HomeMy WebLinkAboutRES 08 236 RESOLUTION NO. 08-236
WHEREAS, construction of the street, storm sewer, water and sanitary sewer
improvements constructed in the Meadows Subdivision, Phase One "A" West have been
completed as follows:
Street. Storm Sewer
• Meadow Run from existing Dishman Road approximately 700 feet south to
the 3-OM-4P end of roadway markers.
• North Sage from proposed Meadow Run approximately 500 feet west to the
3-OM-4P end of roadway markers.
• Pampas from proposed North Sage approximately 120 feet north to the end
of the loop.
• North Blue Stem from proposed Meadow Run approximately 300 feet east
to proposed East Blue Stem.
• East Blue Stem from proposed North Blue Stem approximately 100 feet
south to the 3-OM-4P end of roadway markers.
Water and Sanitary Sewer Improvements
• Lots 1-11, Block 19.
• Lots 1-5 and 23-25, Block 22.
• Lots 1-5 and 17-18, Block 23.
• Lots 1-8, Block 24.
WHEREAS, the developers of said streets desire to have these improvements
accepted and maintained by the City; and,
WHEREAS, the director of the Public Works and Engineering Department has
determined that said improvements meet city standards and qualify for acceptance for
permanent maintenance, and the City Council is of the opinion that said improvements
should be accepted and maintained by the City of Beaumont;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the above-referenced street, storm sewer, water and sanitary sewer improvements
in the Meadows Subdivision, Phase One "A" West, with the exception of streetlights, are
hereby accepted by the City of Beaumont and shall be continuously maintained by the City
contingent upon filing of the final plat,complete with filings of dedication of all rights-of-way
and easements required on the preliminary and final plats and installation of the
streetlights.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 26th day of
August, 2008.
,� l - Mayor Pro Tern Audwin Samuel -