Loading...
HomeMy WebLinkAboutRES 08-163 RESOLUTION NO. 08-163 WHEREAS, bids were solicited for a contract for the reconstruction of owner- occupied housing units damaged by Hurricane Rita; and, WHEREAS, J. W. Turner Construction of Tomball, Texas, submitted a bid in the amount of $454,300 for six (6) locations as shown below: 1955 Prairie $70,290 2504 Ave. G 93,860 725 Campus 70,290 395 Fletcher 70,290 785 E. Lucas 79,280 3770 Ethel 70,290 TOTAL $454,300 and, WHEREAS, City Council is of the opinion that the bid submitted by J. W. Turner Construction of Tomball, Texas, in the amount of$454,300 for six (6) locations as shown above should be accepted: NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the bid submitted by J. W. Turner Construction of Tomball, Texas, in the amount of $454,300 for six(6)locations as shown above should be accepted by the City of Beaumont. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 27th day of May, 2008. lot -041�e— Nqe� M yor Becky Ames - 1 .ems �'►a'oews,•``��