HomeMy WebLinkAboutRES 08-163 RESOLUTION NO. 08-163
WHEREAS, bids were solicited for a contract for the reconstruction of owner-
occupied housing units damaged by Hurricane Rita; and,
WHEREAS, J. W. Turner Construction of Tomball, Texas, submitted a bid in the
amount of $454,300 for six (6) locations as shown below:
1955 Prairie $70,290
2504 Ave. G 93,860
725 Campus 70,290
395 Fletcher 70,290
785 E. Lucas 79,280
3770 Ethel 70,290
TOTAL $454,300
and,
WHEREAS, City Council is of the opinion that the bid submitted by J. W. Turner
Construction of Tomball, Texas, in the amount of$454,300 for six (6) locations as shown
above should be accepted:
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the bid submitted by J. W. Turner Construction of Tomball, Texas, in the amount of
$454,300 for six(6)locations as shown above should be accepted by the City of Beaumont.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 27th day of May,
2008.
lot -041�e— Nqe�
M yor Becky Ames -
1
.ems
�'►a'oews,•``��