HomeMy WebLinkAboutRES 08-144 RESOLUTION NO. 08-144
WHEREAS, on October 31, 2006, the City Council of the City of Beaumont, Texas,
passed Resolution No. 07-342 awarding a contract in the amount of $648,000 to N & T
Construction, Inc., Orange,Texas,forthe construction of Martin Luther King,Jr. Park; and,
WHEREAS, Change Order No. 1 was required for upgrading the specified 2 ft. x 2
ft. concrete pavers to Hanover Prest Pavers in a limestone grey and furnishing new
memorial brick pavers in a charcoal finish thereby increasing the contract amount by
$47,476 which increased the total contract amount to $695,476; and,
WHEREAS, Change Order No. 2 was required to imprint 261 new memorial bricks
that will be placed along the walkway thereby increasing the contract amount by $6,635
for a total contract amount of$702,111; and,
WHEREAS, Change Order No. 3 was required forfurnishing and installing electrical
power breakers, a concrete pedestal and an aluminum enclosure for the main electrical
service that connects to the main power source thereby increasing the contract amount by
$8,303 for a total contract amount of$710,414; and,
WHEREAS, Change Order No.4 was required forfurnishing and installing new light
fixtures in the parking lot thereby increasing the contract amount by $17,669 for a total
contract amount of$728,083; and,
WHEREAS, Change Order No. 5 was required for inscribing cast stone panels
thereby increasing the contract amount by$37,000 for a total contract amount of$765,083;
and,
WHEREAS Change Order Numbers 6, 7 and 8 are necessary as shown below:
Change Order No. 6 $6,943
Change the pavers to a diagonal layout.
Change Order No. 7 $5,600
Install additional underground drainage in the planting beds to eliminate
water retention.
Change e Order No. 8
$7,500
Construct a pedestal for the dedication plaque.
The total amount of$20,043 for these three change orders increases the contract
amount to $785,126;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the City Manager be and he is hereby authorized to execute Change Order Numbers
6, 7 and 8 in the amount of $20,043 thereby increasing the contract to $785,126 for the
construction of Martin Luther King, Jr. Park.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 13th day of May,
2008.