HomeMy WebLinkAboutRES 08-144 RESOLUTION NO. 08-144 WHEREAS, on October 31, 2006, the City Council of the City of Beaumont, Texas, passed Resolution No. 07-342 awarding a contract in the amount of $648,000 to N & T Construction, Inc., Orange,Texas,forthe construction of Martin Luther King,Jr. Park; and, WHEREAS, Change Order No. 1 was required for upgrading the specified 2 ft. x 2 ft. concrete pavers to Hanover Prest Pavers in a limestone grey and furnishing new memorial brick pavers in a charcoal finish thereby increasing the contract amount by $47,476 which increased the total contract amount to $695,476; and, WHEREAS, Change Order No. 2 was required to imprint 261 new memorial bricks that will be placed along the walkway thereby increasing the contract amount by $6,635 for a total contract amount of$702,111; and, WHEREAS, Change Order No. 3 was required forfurnishing and installing electrical power breakers, a concrete pedestal and an aluminum enclosure for the main electrical service that connects to the main power source thereby increasing the contract amount by $8,303 for a total contract amount of$710,414; and, WHEREAS, Change Order No.4 was required forfurnishing and installing new light fixtures in the parking lot thereby increasing the contract amount by $17,669 for a total contract amount of$728,083; and, WHEREAS, Change Order No. 5 was required for inscribing cast stone panels thereby increasing the contract amount by$37,000 for a total contract amount of$765,083; and, WHEREAS Change Order Numbers 6, 7 and 8 are necessary as shown below: Change Order No. 6 $6,943 Change the pavers to a diagonal layout. Change Order No. 7 $5,600 Install additional underground drainage in the planting beds to eliminate water retention. Change e Order No. 8 $7,500 Construct a pedestal for the dedication plaque. The total amount of$20,043 for these three change orders increases the contract amount to $785,126; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be and he is hereby authorized to execute Change Order Numbers 6, 7 and 8 in the amount of $20,043 thereby increasing the contract to $785,126 for the construction of Martin Luther King, Jr. Park. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 13th day of May, 2008. i i - yor Becky Ames - s'�