HomeMy WebLinkAboutRES 08-139 RESOLUTION NO. 08-139
WHEREAS, bids were solicited for a contract for Improvements to Rogers Park;
and,May 2, 2008.
WHEREAS, McInnis Construction of Silsbee, Texas submitted a base bid in the
amount of$1,523,000 plus $1.25 per square foot for soil stabilization as shown on Exhibit
"A" attached hereto; and,
WHEREAS, City Council is of the opinion that the bid submitted by McInnis
Construction of Silsbee, Texas, should be accepted; and,
WHEREAS, subsequent to the submission of bids and with the consent of the
lowest bidder, adjustments were made requiring a change order to bring the project within
budget.
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the bid submitted by McInnis Construction of Silsbee, Texas for a contract for
Improvements to Rogers Park in the amount of$1,523,000 plus $1.25 per square foot for
soil stabilization be accepted by the City of Beaumont.
BE IT FURTHER RESOLVED that the City Manager be and he is hereby authorized
to execute Change Order No. 1 in the amount of$17,262.50 to remove 6,905 feet of the
walking trail and an additional amount of$40,000 for the removal of the resurfacing of the
asphalt parking lot on Dowlen for a total of $57,262.50, thereby decreasing the contract
arnount to $1,465,737.50.
PASSED B'Pr bQ NCIL of the City of Beaumont this the 6th day of May,
2008.
if
w
iU
Payor Becky Ames -
BID TABULATION: ROGERS PARK IMPROVEMENTS
BID OPENING DATE: THURSDAY,APRIL 10,2008 @ 2:00 PM
BID NUMBER:CP0308-04
Vendor McInnis Construction Cleveco Construction & ons ruction * erprises
C /State Silsbee TX Lumberton TX Beaumont TX Oran a TX
BASE BID: $1,523,000 $1,634,000 $1,672,000 $1,730,000
Fly Ash Stabilization,unit pricing per square foot $1.25 $1.00 $8.25 $0.77
Time for Completion,calendar days: 220 240 300 240
ALTERNATE BIDS:
Alternate#1-Furnish and install concrete parking and storm
drainage along Dowlen Road per civil drawings in lieu of
base bid asphalt repairs and addition. $44,000 $88,400 $90,000 $65,000
Alternate#2-Furnish and install additional playground and
walkway path light poles,electrical,foundations and control
r electrical drawings. $41,500 $73,250 $45 000 $52,000
en or Goss Building a ex Const,Corp. H.B.Neild ns, nc. an e s g ons
C' /State Beaumont,TX Beaumont,TX Beaumont,TX Beaumont,TX
BASE BID: $1,736,572 $1,796,600 $1,820,600 $2,340,000
Fly Ash Stabilization,unit pricing r square foot $0.65 $1.25 $0.82 $2.00
Time for Completion,calendar days: 10/24/2008 8 months 210
ALTERNATE BIDS:
Alternate#1-Fumish and install concrete parking and storm
drainage along Dowlen Road per civil drawings in lieu of
base bid asphalt repairs and addition. $88,285 $95,000 $89,200 $220,000
Alternate#2-Furnish and install additional playground and
walkway path light poles,electrical,foundations and control
r electrical drawings. 11 $59156 $60 000 $38,000 E$56,000
en or Fast-Track Construction **MBE Certified Contractor
C /State Dallas TX
***Bid Bond submitted was not 5%,bid withdrawn
BASE BID: ***$798,948.78
Fly Ash Stabilization,unit pricing per square foot $4.00
Time for Completion,calendar days: 10/24/2008
X
= ALTERNATE BIDS:
Alternate#1-Furnish and install concrete parking and storm
drainage along Dowlen Road per civil drawings in lieu of
4 base bid asphalt repairs and addition. $33,488.00
DAlternate#2-Furnish and install additional playground and
walkway path light poles,electrical,foundations and control
1per electrical drawings. $27,946.45