HomeMy WebLinkAboutRES 08-100 RESOLUTION NO. 08-100
WHEREAS, construction of the street, storm sewer, water and sanitary sewer
improvements constructed in the Cottage Grove Subdivision have been completed as
follows:
Street, Storm Sewer,
Cottage Grove Court from existing Major Drive (FM364), approximately 500 feet
east of the end of the cul-de-sac.
Water and Sanitary Sewer Improvements
Lots 1 and 12, Block 1 and Lots 14-19, Block 1.
WHEREAS, the developers of said street desire to have these improvements
accepted and maintained by the City; and,
WHEREAS, the director of the Public Works and Engineering Department have
determined that said improvements meet city standards and qualify for acceptance for
permanent maintenance, and the City Council is of the opinion that said improvements
should be accepted and maintained by the City of Beaumont;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the above-referenced street, storm sewer, water and sanitary sewer improvements
in the Cottage Grove Subdivision, with the exception of streetlights, are hereby accepted
by the City of Beaumont and shall be continuously maintained by the City
contingent upon filing of the final plat, complete with filings of dedication of all rights-of-way
and easements required on the preliminary and final plats and installation of the
streetlights.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 8th day of April,
2008.
AW
,A ,t1
- Ma Becky Ames -
i