Loading...
HomeMy WebLinkAboutRES 08-056 RESOLUTION NO. 08-056 WHEREAS, construction of the street, storm sewer, water and sanitary sewer improvements constructed in the Wolf Creek Subdivision, have been completed as follows: Street. Storm Sewer. • Wolf Creek Drive from existing Washington Village Parkway, approximately 380 feet west to proposed Dylan Drive. • Dylan Drive from proposed Canyon Circle, approximately 800 feet north to the 3-OM-4P, end of roadway markers. • Canyon Circle from proposed Dylan Drive approximately, 180 feet west of the cul-de-sac. • Ridgeline Circle from proposed Dylan Drive approximately, 210 feet west of the cul-de-sac. • Elk Run Circle from proposed Dylan Drive approximately, 210 feet west of the cul-de-sac. Water and Sanitary Sewer Improvements Lots 1 and 2 , Block 2 Lot 1, Block 3 WHEREAS, the developers of said street desire to have these improvements accepted and maintained by the City; and, WHEREAS, the director of the Public Works and Engineering Department have determined that said improvements meet city standards and qualify for acceptance for permanent maintenance, and the City Council is of the opinion that said improvements should be accepted and maintained by the City of Beaumont; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the above-referenced street, storm sewer, water and sanitary sewer improvements in the Wolf Creek Subdivision, with the exception of streetlights, are hereby accepted by the City of Beaumont and shall be continuously maintained by the City contingent upon filing of the final plat, complete with filings of dedication of all rights-of-way and easements required on the preliminary and final plats and installation of the streetlights. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 4th day of March, 2008. 01 i - ayor Becky Ames -