HomeMy WebLinkAboutRES 08-022 RESOLUTION NO. 08-022
WHEREAS, final inspection of street, storm sewer, water and sanitary sewer
improvements constructed in the Washington Boulevard Park Subdivision, was made by
the Engineering Division and the Water Utilities Department as follows:
Street and Storm Sewer Improvements:
• Parago Circle from existing Washington Boulevard approximately 1450
south to the end of the cul-de-sac.
Water and Sanitary Sewer Improvements:
• Lots 1 - 3
WHEREAS, the developers of said addition desire to have these improvements
accepted and maintained by the City; and,
WHEREAS,the Directorof Public Works recommendsthat said improvements meet
city standards and qualify for acceptance for permanent maintenance,and the City Council
is of the opinion that said improvements should be accepted and maintained by the City
of Beaumont;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the street, storm sewer, water and sanitary improvements in the Washington
Boulevard Park Subdivision,with the exception of streetlights, are hereby accepted by the
City of Beaumont and shall be continuously maintained by the City contingent upon filing
of the final plat, complete with filings of dedication of all rights-of-way and easements
required on the preli �lats.
PASSED L of the City of Beaumont this the 22nd day of
January, 2008. i
i
I till t/
- Mayor Becky Ames -