HomeMy WebLinkAboutRES 08-014 RESOLUTION NO. 08-014
WHEREAS, construction of the street, storm sewer, water and sanitary sewer
improvements constructed in Sienna Trails Subdivision, have been completed as follows:
Street, Storm Sewer,
• Sienna Trails from existing Concord Road, approximately 930 feet north of
the 3-OM-4P end of roadway markers.
• Timber Creek Loop from proposed Sienna Trails approximately 1185 feet
east of Sienna Trails.
Water and Sanitary Sewer Improvements
Lots 1 and 2, Block 2 and Lot 1, Block 3.
WHEREAS, the developers of said street desire to have these improvements
accepted and maintained by the City; and,
WHEREAS, the director of the Public Works and Engineering Department have
determined that said improvements meet city standards and qualify for acceptance for
permanent maintenance, and the City Council is of the opinion that said improvements
should be accepted and maintained by the City of Beaumont;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the above-referenced street, storm sewer, water and sanitary sewer improvements
in Sienna Trails Subdivision,with the exception of streetlights, are hereby accepted by the
City of Beaumont and shall be continuously maintained by the City.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 15th day of
January, 2008.
� - rBecky
�I ayo Ames -