Loading...
HomeMy WebLinkAboutRES 07-399 RESOLUTION NO. 07-399 WHEREAS, construction of the street, storm sewer, water and sanitary sewer improvements constructed in the Deerfield - Phase II Subdivision, have been completed as follows: Street and Storm Sewer Improvements • Carrie Lane from 445 feet west of Deerfield Drive approximately 650 feet north to the 3-OM-4P end of roadway markers. • Winnsboro Circle from proposed Carrie Lane approximately 125 feet east to the 3-OM-4P end of roadway markers. • Bonner Drive from 450 feet north of Carrie Lane approximately 475 feet north to the 3-OM-4P end of roadway markers. • Somerville Circle from proposed Bonner Drive approximately 125 feet west to the 3-OM-4P end of roadway markers. Water and Sanitary Sewer Improvements • Lots 11-16, Block 1 • Lots 6-13, Block 2 • Lots 8-13 & lot 26, Block 3 • Lots 15-19, Block 4 WHEREAS, the developers of said street desire to have these improvements accepted and maintained by the City; and, WHEREAS, the director of the Public Works and Engineering Department have determined that said improvements meet city standards and qualify for acceptance for permanent maintenance, and the City Council is of the opinion that said improvements should be accepted and maintained by the City of Beaumont; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the above-referenced street, storm sewer,water and sanitary sewer improvements in the Deerfield - Phase II Subdivision, with the exception of streetlights, are hereby accepted by the City of Beaumont and shall be continuously maintained by the City contingent upon filing of the final plat, complete with filings of dedication of all rights-of-way and easements required on the preliminary and final plats and installation of the streetlights. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 11th day of December, 2007. ����•ay.®off\\ 10 Q,E�,UMp , / Osseas Ma hr Becky Ames -