Loading...
HomeMy WebLinkAboutRES 07-343 RESOLUTION NO. 07-343 WHEREAS, on October 24, 2006,the City Council of the City of Beaumont, Texas, passed Resolution No. 06-325 awarding a contract in the amount of$1,496,254 to Allco, Ltd., Beaumont,Texas,forthe Rehabilitation of the Wastewater Treatment Facility Primary and Secondary Trickling Filters; and, WHEREAS, Change Order No. 1 is required for "extra work" to remove three concrete plugs for the headworks building and channel, replace the specified Garlock gaskets with 1/8" neoprene gaskets on Primary Trickling Filter No. 1, sandblast existing distribution arms for Primary Trickling Filter No. 2, Secondary Trickling Filter No. 1 and Secondary Trickling Filter No. 2 to prepare the surfaces to be galvanized, repair three (3) sections of the distribution tubes from Primary Trickling Filter No. 2 by cutting the bottom section of the tubes at the weld seams on both sides and installing a 1/4" carbon steel plate bent to the original radius and cutting new holes for the orifice ports to match the original holes, furnish and install 325 new stainless steel spreader plates and 325 new stainless steel spacer plates on Primary Trickling Filter No. 2, repair the top of one distribution tube section by cutting out the damaged area and welding a 1/4" carbon steel plate in place and weld up dimple holes on the distribution tubes for Primary Trickling Filter No. 2, and increase the contract time by 81 calendar days, thereby increasing the contract amount by $34,965.35 for a total contract amount of $1,531,219.35. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be and he is hereby authorized to execute Change Order No. 1 for"extra work"as described above,thereby increasing the contract amount by$34,965.35 for a total contract amount of $1,531,219.35. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 23rd day of October, 2007. X - - ayor Becky Ames - w l0 W_