HomeMy WebLinkAboutRES 06-268 RESOLUTION NO. 06-268
WHEREAS, on July 12, 2005, the City Council of the City of Beaumont, Texas,
passed Resolution No. 05-153 awarding a contract in the amount of$983,726 to Brystar
Contracting, Inc. for the 23rd Street Peak Flow Force Main from Lafin Rd. to Hillebrandt
Bayou - Phase II Project; and,
WHEREAS, Change Order No. 1 is required to adjust the material from ductile iron
pipe to high density polyethylene pipe (HDPE), delete the removal and replacement of 85
I.f. of 54" pipe,delete furnishing and installing of Hobas fitting,delete the M.J.fitting,delete
furnishing and installing a 30" x 22 " degree ductile iron M.J. fitting, delete furnishing and
installing a 30" x 11 1/4 degree ductile iron M.J. fitting, delete the relocation of the utility
pole at station 29+05,delete the relocation of existing sanitary sewer manhole and 8"force
main between station 30+65 and 33+22, bore under Lafin Road to proposed 8'x8'concrete
junction box, and connect proposed 32" HDPE to existing 30" ductile iron pipe in the
amount of$(23,023) thereby decreasing the contract amount to $960,703; and,
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the City Manager be and he is hereby authorized to execute Change Order No. 1
in the amount of $(23,023) thereby decreasing the contract amount to $960,703 for the
23rd Street Peak Flow Force Main from Lafin Rd. to Hillebrandt Bayou - Phase II Project
PASSED BY THE CITY COUNCIL of the City of Bea nt this e 12th day of
September, 2006.