Loading...
HomeMy WebLinkAboutRES 06-249 RESOLUTION NO. 06 - 249 WHEREAS, construction of the street, storm sewer, water and sanitary sewer improvements constructed in Barrington Heights Phase VII, Subdivision, have been completed as follows: Street and Storm Sewer. • Claybourn Drive from existing dead end approximately 295 linear feet west to the 3-OM-4P end of roadway markers. • Windrose Drive from the proposed Claybourn Drive approximately 1,077 linear feet south to the proposed Ellington Lane. • Ellington Lane from existing dead end approximately 302 linear feet west to the 3-OM-4P end of roadway markers. Water and Sanitary Sewer Improvements • Lots 34-36, Block 1; • Lot 11-13, Block 6; • Lots 14-25, Block 8; and, • Lots 1-12, Block 9. and, WHEREAS, the developers of said street desire to have these improvements accepted and maintained by the City; and, WHEREAS, the director of the Public Works and Engineering Department recommends that said improvements meet city standards and qualify for acceptance for permanent maintenance, and the City Council is of the opinion that said improvements should be accepted and maintained by the City of Beaumont; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the above-referenced street, storm sewer, water and sanitary sewer improvements in the Barrington Heights Phase VII, Subdivision, with the exception of streetlights, are hereby accepted by the City of Beaumont and shall be continuously maintained by the City contingent upon filing of the final plat, complete with filings of dedication of all rights-of-way and easements required on the preliminary and final plats and installation of the streetlights. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 29th day of August, 2006. to n - Mayor Guy N. Goodson - 'WOW