HomeMy WebLinkAboutRES 06-249 RESOLUTION NO. 06 - 249
WHEREAS, construction of the street, storm sewer, water and sanitary sewer
improvements constructed in Barrington Heights Phase VII, Subdivision, have been
completed as follows:
Street and Storm Sewer.
• Claybourn Drive from existing dead end approximately 295 linear feet west
to the 3-OM-4P end of roadway markers.
• Windrose Drive from the proposed Claybourn Drive approximately 1,077
linear feet south to the proposed Ellington Lane.
• Ellington Lane from existing dead end approximately 302 linear feet west
to the 3-OM-4P end of roadway markers.
Water and Sanitary Sewer Improvements
• Lots 34-36, Block 1;
• Lot 11-13, Block 6;
• Lots 14-25, Block 8; and,
• Lots 1-12, Block 9.
and,
WHEREAS, the developers of said street desire to have these improvements
accepted and maintained by the City; and,
WHEREAS, the director of the Public Works and Engineering Department
recommends that said improvements meet city standards and qualify for acceptance for
permanent maintenance, and the City Council is of the opinion that said improvements
should be accepted and maintained by the City of Beaumont;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the above-referenced street, storm sewer, water and sanitary sewer improvements
in the Barrington Heights Phase VII, Subdivision, with the exception of streetlights, are
hereby accepted by the City of Beaumont and shall be continuously maintained by the City
contingent upon filing of the final plat, complete with filings of dedication of all rights-of-way
and easements required on the preliminary and final plats and installation of the
streetlights.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 29th day of
August, 2006.
to
n - Mayor Guy N. Goodson -
'WOW