HomeMy WebLinkAboutRES 06-197 RESOLUTION NO. 06-197 WHEREAS, bids were received for furnishing all labor, supplies, materials and equipmentforthe construction of a pre-engineered metal building atthe Police Department training facility; and, WHEREAS, Cleveco Construction, Lumberton, Texas, submitted a bid in the amount of $337,420; and, WHEREAS, City Council is of the opinion that the bid submitted by Cleveco Construction, Lumberton, Texas, should be accepted; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the bid submitted by Cleveco Construction, Lumberton, Texas, for furnishing all labor, supplies, materials and equipment for the construction of a pre-engineered metal building at the Police Department training facility in the amount of$337,420 be accepted by the City of Beaumont. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 11th day of July, 2006. o Mayor o Tern Beaulieu - ly ;iA9RNC C� INTER-OFFICE MEMORANDUM City of Beaumont,Texas Capital Projects Div. Public works Dept. Date: March 16,2007 To: Kyle Hayes, City Manager From: Brenda Beadle, Capital Projects Manager Subject: Police Department Range House/Change Order No.3 COMMENTS On July 11,2006,by Resolution No.06-197,City Council awarded a construction contract for the new Police Department Range House to Cleveco Construction,Lumberton,Texas. The amount of the contract awarded was$337,420. Change Order No. 1 was executed September 1,2006 and deducted$475.00 from the construction contract, resulting in a new contract total of$336,945. Change Order No. 2 was executed February 2, 2007 and increased the construction contract $4,838.95, resulting in a new contract total of$341,783.95. Attached for your review and approval are three (3) copies of Change Order No. 3. This change order. provides for additional stub ups,receptacle,and TV support. This increase of$2,515.59 represents less than I%of the construction contract. The new total for the construction contract will be $344,299.54. No additional days are required for these changes, therefore the date of Substantial Completion remains February 18, 2007. If you require any additional information,please call. BB:bd Attachments C:1D.eu a S iap�Wy Dminwb\WPDOCS%Cpnwn.PmlecuNOl Dep Shad Ho W,1i -R.ap Howe 1004U/e M�3-Rasp Haag MW CHANGE ORDER PROJECT: Range House, City of Beaumont CHANGE ORDER NO: 3 CONTRACTOR: Cleveco Construction Co. DATE: 3/5/07 P.O. Box 8511 ARCHITECT'S PROJECT NO.: 0301 OB Lumberton, TX 77657 CONTRACT DATE: 7/12/2006 CONTRACT FOR: General Construction The Contract is changed as follows: 1. Add four(4) 1"and one(1) 1-1/4" PVC Conduit Stub-Ups. Add ADD $2,178.00 one(1)TV Stub-Up and one(1) Duplex Receptacle in the Classroom above Projection Screen. Provide support for TV, six(6) 10'-0"2x4's and labor by Cleveco Construction Company. 2. Add Electrician's Markup of 10% ADD $217.80 3. Add Contractor's Markup of 5% ADD $119.79 TOTAL $2,515.59 **See attached breakdown Not valid until signed by the Owner,Architect,and Contractor. The original Contract Sum was........................................................................................................................$337,420.00 Net change by previously authorized Change Orders..........................................................................................$4,363.95 The Contract Sum prior to this Change Order was...........................................................................................$341,783.95 The Contract sum will be increased by this Change Order in the amount of ......................................................$2,515.59 The new Contract Sum including this Change Order will be ............................................................................$344,299.54 The Contract T' eased/decreased by (0)days. The date of tal on as of the date of this Change Order therefore is February 18, 2007. ap NOTE: Ws top ct changes in the Contract Sum or Contract Time, which have been authorized by . t do an 0 ive. a N y * 16306 The LaBic 'tect Cleveco Construction Company City of Beaumont 7999 Gladys 1 P.O. Box 8511 P.O. Box 3827 Beaumont, x Lumbe on, Texas 77657 Beaumont, exas 77704 Y By: _ By: By: Date:_ -4>7 Date: 3- Z_-07 Date: 3- 2/ -o-7 FROM (THU)MAR 1 2007 5:26/ST. 5:26/No.7500000603 P 1 CHANGE ORDER # 3 C L E V E C O CONSTRUCTION COMPANY ARCHITECT:The LaBiche Architcctural Croup,Inc. P.O.BOX 8511 LUMBERTON,TEXAS 77657 PROJECT NUMBER:03010B DATE: 2/28/2007 PROJECT: City of Beaumont Range House TO: City of Beaumont P.O.Box 3827 Beaumont,Texas 77701 Gentlemen: We hereby agree to snake the change(s)specified below: This change will result in an add to the original contract of: Add four(4) 1"and one(1) 1-1/4"PVC Conduit Stub-Ups(10 lineal feet away from the new slab) After building was erected,we extended conduit through ceiling for future use Add one(1)TV stub-up and one(1)Duplex Receptacle in the Classroom abovc Projection Screen Provide support for TV(six(6) 10'-0"2X4's and labor by Clcv=o Construction Company) 1'wo Thousand,Five Hundred And Fifteen Dollars And Fifty Nine Cents(S 2515.59) The breakdown is as follows(Electrical Subcontractor's Quote is attached): Labor.....................$ 1020.00 Material.....................S 708.00 Equipment Rental.........S 350.00 Electrician's Markup of 10%......S 217.80 $2,395-80 Add Contractor's Mark-up of 5%.....$119.79 $ 2,515.59 NOTE: THIS CHANGE BECOMES PART OF, AND IS IN CONFORMANCE WITH THE EXISTING CONTRACT We hereby agree to make the change(s)specified above for the sum of: S 2,515.59 Previous Contract Amount. $ 341,783.95 Revised Contract Amount: S 344,299.54 CONTRACTOR'S SIGNATURE: Sue Cleveland,President ACCEPTED - THE ABOVE PRICES AND SPECIFICATIONS OF THIS CHANGE ORDER ARE SATISFACTORY AND ARE HEREBY ACCEPTED.ALL WORK TO BE PERFORMED UNDER SAME TERMS AND CONDITIONS AS SPECIFIED IN ORICINAL CONTRACT. DATE OF ACCEPTANCE: SIGNATURE: (ARCHITECT) DATE OF ACCEPTANCE: SIGNATURE: (OWNER) FROM (THU)MAR 1 2007 5:26/ST. 5:26/No. 7500000603 P 2 BE.A,UMONT :Gi�GK th; i.., 826 Chamberlin Dr. Beaumont, Texas 77707 (409) 842-3131 Fax (409) 842-4506 License 018935 Change Order 42 Range House Attn:Ron Cleveland 2.27-07 Add(4) 1"and(1) 1114"PVC conduit stub ups (10) away from the new slab and extend them above the lay-in ceiling for future use Equipment Mental for(1)day Add(1)TV stub up and (1)duplex receptacle in the classroom above the projection screen Labor(14 hrs) $1,120.00 Matcrial 5708.00 Equipment rental 5350.00 Markup (1094) $217.80 Job Total $2,395.80 Kevin McClory, Beaumont Electric Customer Signature Regulated by The TX Dept of Licensing&Regulation,P.O.Box 12157,Austin,7X.78711, 1-800-303-9202 512463-6599;webaiw'www.11ceou.stm.tx.us/comply uts INTER-OFFICE MEMORANDUM City of Beaumont,Texas Capital Projects Div. Public works Dept. Date: March 27,2007 To: Kyle Hayes, City Manager From: Brenda Beadle, Capital Projects Manager Subject: Police Range House/Beaumont Police Dept. COMMENTS On July 11, 2006, by Resolution No. 06-197, City Council awarded the construction of a pre-engineered metal building (Range House) for the Beaumont Police Department to Cleveco Construction, Lumberton, Texas,in the amount of$337,420. Three change orders were executed for a total of$6,879.54 increasing the construction contract to $344,299.54. This project was funded by the Police Confiscated Goods Fund. Attached for your review and approval are three (3) original copies of the Certificate of Substantial Completion. The Certificate designates February 23,2007 as the date of warranty commencement. This was determined after an inspection of the project by the architect, the contractor, Building Services Project Planner,Lt.Mark Pierce and other representatives from BPD. As a result of this inspection,the project was determined to be substantially complete. All items which are in need of final completion or correction are in the process of being completed by the contractor. Your signature on the attached certificate will signify your acceptance and approval. If you require any additional information,please call. BB:bd Attachments C:IDddnrni.a S -PWren Wy Docww PDOCS\Cdutrud.P j,0001 DqA Shod Ho film-R p Hm,1006W1 M®-Pa. S.b C=Pl PD R..`e H ..N CERTIFICATE OF SUBSTANTIAL COMPLETION PROJECT: Range House, City of Beaumont ARCHITECT: LaBiche Architectural Beaumont, Texas Group, Inc. PROJECT NO.: 03010B TO: City of Beaumont CONTRACTOR: Cleveco Construction Co. P. O. Box 3827 Beaumont, TX 77704 CONTRACT FOR: New Construction CONTRACT DATE: 7/12/2006 DATE OF ISSUANCE: February 23, 2007 PROJECT OR DESIGNATED PORTION SHALL INCLUDE: All Work The Work performed under this Contract has been reviewed and found to be substantially complete. The Date of Substantial Completion of the Project or portion thereof designated above is hereby established as February 23, 2007, which is also the date of commencement of applicable warranties, required by the Contract documents, except as stated below. DEFINITION OF DATE OF SUBSTANTIAL COMPLETION The date of Substantial Completion of the Work or designated portion thereof is the Date certified by the Architect when construction is sufficiently complete, in accordance with the Contract Documents, so the Owner can occupy or utilize the Work or designated portion thereof for the use for which it is intended d in the Contract Documents,. �,D ,4 Rc A list of items to be completed or corrected, prepared by the Contractor ?0 4 verified and amended by the Architect is attached hereto. The failure to t3 0 m include any items on such list does not alter the responsibility of the W M N. n Contractor to complete all Work in accordance with the Contract Documents. 0 16306 ^ The date of commencement of warranties for items on the attached list will be the date of final payment unless otherwise agreed to in wri ing. IS>, OF The LaBiche Architectural Group, Inc. 2'23 •47 ARCHITECT DATE The Contractor will complete or correct the Work on the list of items attached hereto within fifteen (15) days from the Date of Substantial Completion. Cleveco Construction Company —e23 —07 CONTRACTOR BY DATE The Owner accepts the Work or designated portion thereof as substantially complete and will assume full possession thereof at 8:00 a.m. on February 24, 2007. City of Beaumont OWNER BY DATE The responsibilities of the Owner and the Contractor for security, maintenance, heat, utilities, damage to the Work and insurance shall be as follows: Owner will assume responsibility for maintenance, security, and damage to the Work on the Date of Substantial Completion except for damage done by Contractor or Subcontractors during final completion. Owner assumes responsibility for insurance of the Project on February 24, 2007. The Contractor will submit to the Owner the executed warranties, maintenance agreements, inspection certificates, record documentation, maintenance manuals, tools, spare parts, keys and similar operational items by March 24, 2007. ARCHITECTS CHECK LIST PROJECT: City of Beaumont—Range DATE OF OCCUPANCY: 2/24/07 House PROJECT NO.: 03010B DATE OF INSPECTION: 2/23/07 CONTRACTOR: Cleveco Construction INSPECTED BY: Greg Wall ROOM NAME: CLASSROOM ROOM NO.: 101 CODES: X Not Applicable 06 Adjust 12 Clean 01 Chipped/Scratched 07 Touch-up 13 Sand 02 Faulty 08 Replace 14 Paint/Stain 03 Broken/Damaged 09 Repair 15 Torn 04 Dented/Marred 10 Leak 16 Other: 05 Missing 11 Caulk CODE NO, QK ITEM CODE NO. QK ITEM Door _ Window Shade n'7 _ Door Frame _ Projection Screen Sill _ Closet Rod/Shelf(s) Hardware _ Ceiling VCB �� _ Light Fixtures Carpet _ Diffusers/Clg. Grille VCT/Res. Flr. _ Detectors CT. Flr. _ Sprinklers CTB Fin. Radiation/Cab. Htr. _ Sinks Window Stool(s) _ Cabinets GWB Wall _ Water Closets/Urinals CT Wall _ Shower Stall/Rod/Curtain Wainscot(VCF) _ Spigots/Valves VCF Wall _ Mirrors Window _ Toilet Paper Holders SW/Plate _ Napkin Vendor/Disposal Recep/Plate _ Paper Towel Thermostat _ Exhaust Fan/Grille Comm. Outlets _ Mop Holder Fan Control/Plate _ Elec.Test Demo Clock _ Air Test, Bal. Demo Exit Sign/Light _ Plumbing Test Demo Fire Alarm Horn _ HWH Test Bal. Demo Fire Alarm Pull Station _ Equip.Test Bal. Demo Fire Extinguisher _ Ductwork Marker Board COMMENTS: I7A-Mij',Ap IAAA L �Q04MCK 664P RZ2& 1016 Qdu&x A7 ~1 /Oj 5 ARCHITECTS CHECK LIST PROJECT: City of Beaumont—Range DATE OF OCCUPANCY: 2/24/07 House PROJECT NO.: 030108 DATE OF INSPECTION: 2/23/07 CONTRACTOR: Cleveco Construction INSPECTED BY: Greg Wall ROOM NAME: CLASSROOM STORAGE ROOM NO.: 102 romq- X Not Applicable 06 Adjust 12 Clean 01 Chipped/Scratched 07 Touch-up 13 Sand 02 Faulty 08 Replace 14 Paint/Stain 03 Broken/Damaged 09 Repair 15 Torn 04 Dented/Marred 10 Leak 16 Other: 05 Missing 11 Caulk CODE NO. DE 9EM CODE NO_ QK ITEM Door _ Window Shade Door Frame _ Projection Screen Sill _ Closet Rod/Shelf(s) Hardware _ Ceiling VCB _ Light Fixtures Carpet _ Diffusers/Clg. Grille VCT/Res. Fir. _ Detectors CT. Fir. _ Sprinklers CTB Fin.Radiation/Cab. Htr. _ Sinks Window Stool(s) _ Cabinets GWB Wall _ Water Closets/Urinals CT Wall _ Shower Stall/Rod/Curtain Wainscot(VCF) _ Spigots/Valves VCF Wall _ Mirrors Window _ Toilet Paper Holders SW/Plate _ Napkin Vendor/Disposal Recep/Plate _ Paper Towel Thermostat _ Exhaust Fan/Grille Comm.Outlets _ Mop Holder Fan Control/Plate _ Elec.Test Demo Clock _ Air Test, Bal. Demo Exit Sign/Light _ Plumbing Test Demo Fire Alarm Horn _ HWH Test Bal. Demo Fire Alarm Pull Station _ Equip.Test Bal. Demo Fire Extinguisher _ Ductwork Marker Board COMMENTS: ARCHITECTS CHECK LIST PROJECT: City of Beaumont–Range DATE OF OCCUPANCY: 2/24/07 House PROJECT NO.: 030108 DATE OF INSPECTION: 2/23/07 CONTRACTOR: Cleveco Construction INSPECTED BY: Greg Wall ROOM NAME: RESTROOM ROOM NO.: 103 CODES. X Not Applicable 06 Adjust 12 Clean 01 Chipped/Scratched 07 Touch-up 13 Sand 02 Faulty 08 Replace 14 Paint/Stain 03 Broken/Damaged 09 Repair 15 Torn 04 Dented/Marred 10 Leak 16 Other: 05 Missing 11 Caulk CODE NO. Qh ITEM CODE NO. ITEM —QL _ Door _ Window Shade Door Frame _ Projection Screen Sill _ Closet Rod/Shelf(s) Hardware 07_ _ Ceiling VCB _ Light Fixtures Carpet _ Diffusers/Clg. Grille VCT/Res. Flr. _ Detectors CT. Flr. _ Sprinklers CTB Fin. Radiation/Cab. Htr. _ Sinks Window Stool(s) _ Cabinets GWB Wall _ Water Closets/Urinals CT Wall _ Shower Stall/Rod/Curtain Wainscot(VCF) _ Spigots/Valves VCF Wall _ Mirrors Window _ Toilet Paper Holders SW/Plate _ Napkin Vendor/Disposal Recep/Plate _ Paper Towel Thermostat _ Exhaust Fan/Grille Comm.Outlets _ Mop Holder Fan Control/Plate _ Elec.Test Demo Clock _ Air Test, Bal. Demo Exit Sign/Light _ Plumbing Test Demo Fire Alarm Horn _ HWH Test Bal. Demo Fire Alarm Pull Station _ Equip.Test Bal. Demo Fire Extinguisher _ Ductwork Marker Board OW6/ COMMENTS: iir!5�,ICT�M C'VA"4A5, AN, C-64A44'e, TI4S 6C GeuL.� 'T o �lam- ��HH� Giwarc /)/jD• ARCHITECT'S CHECK LIST PROJECT: City of Beaumont—Range DATE OF OCCUPANCY: 2/24/07 House PROJECT NO.: 03010B DATE OF INSPECTION: 2/23/07 CONTRACTOR: Cleveco Construction INSPECTED BY: Greg Wall ROOM NAME: RESTROOM ROOM NO.: 104 -O X Not Applicable 06 Adjust 12 Clean 01 Chippod/Scratched 07 Touch-up 13 Sand 02 Faulty 08 Replace 14 Paint/Stain 03 Broken/Damaged 09 Repair 15 Torn 04 Dented/Marred 10 Leak 16 Other: 05 Missing 11 Caulk CODE NO. aK ITEM QQDF NO ITEM Door _ Window Shade Door Frame _ Projection Screen Sill _ Closet Rod/Shelf(s) Hardware _ Ceiling VCB _ Light Fixtures Carpet _ Diffusers/Clg. Grille VCT/Res. Flr. _ Detectors CT. Flr. _ Sprinklers CTB Fin. Radiation/Cab. Htr. _ Sinks Window Stool(s) _ Cabinets GWB Wall _ Water Closets/Urinals CT Wall _ Shower Stall/Rod/Curtain Wainscot(VCF) _ Spigots/Valves VCF Wall _ Mirrors Window _ Toilet Paper Holders SW/Plate _ Napkin Vendor/Disposal Recep/Plate _ Paper Towel Thermostat _ Exhaust Fan/Grille Comm.Outlets _ Mop Holder Fan Control/Plate _ Elec.Test Demo Clock _ Air Test, Bal. Demo Exit Sign/Light _ Plumbing Test Demo Fire Alarm Horn _ HWH Test Bal. Demo Fire Alarm Pull Station _ Equip.Test Bal. Demo Fire Extinguisher _ Ductwork Marker Board COMMENTS: 9k' fQ1=7'XAV VU-1-5/ jftf� Art' QC 4*1,r 776,C ARCHITECT'S CHECK LIST PROJECT: City of Beaumont—Range DATE OF OCCUPANCY: 2/24/07 House PROJECT NO.: 03010B DATE OF INSPECTION: 2/23/07 CONTRACTOR: Cleveco Construction INSPECTED BY: Greg Wall ROOM NAME: VENDING ROOM NO.: 105 CODES. X Not Applicable 06 Adjust 12 Clean 01 Chipped/Scratched 07 Touch-up 13 Sand 02 Faulty 08 Replace 14 Paint/Stain 03 Broken/Damaged 09 Repair 15 Torn 04 Dented/Marred 10 Leak 16 Other: 05 Missing 11 Caulk CODE NO. QK ITEM CODE NO, QK ITEM Door _ Window Shade Door Frame _ Projection Screen Sill _ Closet Rod/Shelf(s) Hardware _ Ceiling VCB _ Light Fixtures Carpet _ Diffusers/Clg. Grille VCT/Res. Flr. _ Detectors CT. Flr. _ Sprinklers CTB Fin. Radiation/Cab. Htr. _ Sinks Window Stool(s) _ Cabinets D7 SCI,/1 vr— 6 ` GWB Wall _ Water Closets/Urinals CT Wall _ Shower Stall/Rod/Curtain Wainscot(VCF) _ SpigotsNalves VCF Wall _ Mirrors Window _ Toilet Paper Holders SW/Plate _ Napkin Vendor/Disposal Recep/Plate _ Paper Towel Thermostat _ Exhaust Fan/Grille Comm. Outlets _ Mop Holder Fan Control/Plate _ Elec.Test Demo Clock _ Air Test, Bal. Demo Exit Sign/Light _ Plumbing Test Demo Fire Alarm Horn _ HWH Test Bal. Demo Fire Alarm Pull Station _ Equip.Test Bal. Demo Fire Extinguisher _ Ductwork Marker Board COMMENTS: //S /W /1j6 ,5Ge i Ar fG�G�,G,CAc s+rfc �X ARCHITECT'S CHECK LIST PROJECT: City of Beaumont—Range DATE OF OCCUPANCY: 2/24/07 House PROJECT NO.: 030106 DATE OF INSPECTION: 2/23/07 CONTRACTOR: Cleveco Construction INSPECTED BY: Greg Wall ROOM NAME: CORRIDOR ROOM NO.: 106 OC DES: X Not Applicable 06 Adjust 12 Clean 01 Chipped/Scratched 07 Touch-up 13 Sand 02 Faulty 08 Replace 14 Paint/Stain 03 Broken/Damaged 09 Repair 15 Torn 04 Dented/Marred 10 Leak 16 Other: 05 Missing 11 Caulk CODE NO. a ITEM CODE NO ITEM Door _ Window Shade Door Frame _ Projection Screen Sill _ Closet Rod/Shelf(s) Hardware _ Ceiling VCB _ Light Fixtures Carpet _ Diffusers/Gig. Grille VCT/Res. Fir. _ Detectors CT. Flr. _ Sprinklers CTB Fin. Radiation/Cab. Htr. _ Sinks Window Stool(s) _ Cabinets GWB Wall _ Water Closets/Urinals CT Wall _ Shower Stall/Rod/Curtain Wainscot(VCF) _ Spigots/Valves VCF Wall _ Mirrors Window _ Toilet Paper Holders SW/Plate _ Napkin Vendor/Disposal Recep/Plate _ Paper Towel Thermostat _ Exhaust Fan/Grille Comm. Outlets _ Mop Holder Fan Control/Plate _ Elec.Test Demo Clock _ Air Test, Bal. Demo Exit Sign/Light _ Plumbing Test Demo Fire Alarm Horn _ HWH Test Bal. Demo Fire Alarm Pull Station _ Equip.Test Bal. Demo Fire Extinguisher _ Ductwork Marker Board COMMENTS: ARCHITECTS CHECK LIST PROJECT: City of Beaumont—Range DATE OF OCCUPANCY: 2/24/07 House PROJECT NO.: 03010B DATE OF INSPECTION: 2/23/07 CONTRACTOR: Cleveco Construction INSPECTED BY: Greg Wall ROOM NAME: MECHANICAL ROOM NO.: 107 CODES: X Not Applicable 06 Adjust 12 Clean 01 Chipped/Scratched 07 Touch-up 13 Sand 02 Faulty 08 Replace 14 Paint/Stain 03 Broken/Damaged 09 Repair 15 Torn 04 Dented/Marred 10 Leak 16 Other: 05 Missing 11 Caulk CODE NO. QK ITEM CODE NO. QK UEM Door _ Window Shade Door Frame _ Projection Screen Sill _ Closet Rod/Shelf(s) Hardware _ Ceiling VCB _ Light Fixtures Carpet _ Diffusers/Clg. Grille VCT/Res. Fir. _ Detectors _ CT. Fir. _ Sprinklers CTB Fin. Radiation/Cab. Htr. _ Sinks Window Stool(s) _ Cabinets GWB Wall _ Water Closets/Urinals CT Wall _ Shower Stall/Rod/Curtain Wainscot(VCF) _ Spigots/Valves VCF Wall _ Mirrors Window _ Toilet Paper Holders SW/Plate _ Napkin Vendor/Disposal Recep/Plate _ Paper Towel Thermostat _ Exhaust Fan/Grille Comm. Outlets _ Mop Holder Fan Control/Plate _ Elec.Test Demo Clock _ Air Test,Bal. Demo Exit Sign/Light _ Plumbing Test Demo Fire Alarm Horn _ HWH Test Bal. Demo Fire Alarm Pull Station _ Equip.Test Bal. Demo Fire Extinguisher _ Ductwork Marker Board COMMENTS: ARCHITECT'S C'HEC'K LIST PROJECT: City of Beaumont—Range DATE OF OCCUPANCY: 2/24/07 House PROJECT NO.: 03010B DATE OF INSPECTION: 2/23/07 CONTRACTOR: Cleveco Construction INSPECTED BY: Greg Wall ROOM NAME: RANGE ROOM ROOM NO.: 108 CODES: X Not Applicable 06 Adjust 12 Clean 01 Chipped/Scratched 07 Touch-up 13 Sand 02 Faulty 08 Replace 14 Paint/Stain 03 Broken/Damaged 09 Repair 15 Torn 04 Dented/Marred 10 Leak 16 Other: 05 Missing 11 Caulk CODE NO. Q1S ITEM CODE NO. QK ITEM Door _ Window Shade Door Frame _ Projection Screen Sill _ Closet Rod/Shelf(s) _ Hardware _ Ceiling VCB 12- — Light Fixtures Carpet — Diffusers/Clg.Grille VCT/Res.Flr. _ Detectors CT. Flr. — Sprinklers CTB Fin. Radiation/Cab. Htr. — Sinks Window Stool(s) _ Cabinets GWB Wall — Water Closets/Urinals CT Wall — Shower Stall/Rod/Curtain Wainscot(VCF) — Spigots/Valves VCF Wall — Mirrors Window _ Toilet Paper Holders SW/Plate — Napkin Vendor/Disposal Recep/Plate — Paper Towel Thermostat — Exhaust Fan/Grille Comm. Outlets — Mop Holder Fan Control/Plate — Elec.Test Demo Clock — Air Test, Bal. Demo Exit Sign/Light _ Plumbing Test Demo Fire Alarm Horn _ HWH Test Bal. Demo Fire Alarm Pull Station — Equip.Test Bal. Demo Fire Extinguisher _ Ductwork Marker Board COMMENTS: ARCHITECTS CHECK LIST PROJECT: City of Beaumont—Range DATE OF OCCUPANCY: 2/24/07 House PROJECT NO.: 03010B DATE OF INSPECTION: 2/23/07 CONTRACTOR: Cleveco Construction INSPECTED BY: Greg Wall ROOM NAME: RANGE OFFICE ROOM NO.: 109 CDDES.: X Not Applicable 06 Adjust 12 Clean 01 Chipped/Scratched 07 Touch-up 13 Sand 02 Faulty 08 Replace 14 Paint/Stain 03 Broken/Damaged 09 Repair 15 Torn 04 Dented/Marred 10 Leak 16 Other: 05 Missing 11 Caulk CODE NO, QK 1IEM CODE NO, QK ITEM Door _ Window Shade Door Frame _ Projection Screen Sill _ Closet Rod/Shelf(s) Hardware _ _ Ceiling VCB _ Light Fixtures Carpet _ Diffusers/Clg. Grille VCT/Res. Flr. _ Detectors CT. Flr. _ Sprinklers CTB Fin. Radiation/Cab. Htr. _ Sinks Window Stool(s) _ Cabinets GWB Wall _ Water Closets/Urinals CT Wall _ Shower Stall/Rod/Curtain Wainscot(VCF) _ Spigots/Valves VCF Wall _ Mirrors Window _ Toilet Paper Holders SW/Plate _ Napkin Vendor/Disposal Recep/Plate _ Paper Towel Thermostat _ Exhaust Fan/Grille Comm. Outlets _ Mop Holder Fan Control/Plate _ Elec.Test Demo Clock _ Air Test, Bal. Demo Exit Sign/Light _ Plumbing Test Demo Fire Alarm Horn _ HWH Test Bal. Demo Fire Alarm Pull Station _ Equip.Test Bal. Demo Fire Extinguisher _ Ductwork Marker Board COMMENTS: ,i41W �l��r Df G�J/nlr�lr�ca ARCHITECT'S CHECK LIST PROJECT: City of Beaumont—Range DATE OF OCCUPANCY: 2/24/07 House PROJECT NO.: 03010B DATE OF INSPECTION: 2/23/07 CONTRACTOR: Cleveco Construction INSPECTED BY: Greg Wall ROOM NAME: CORRIDOR ROOM NO.: 110 CODFS: X Not Applicable 06 Adjust 12 Clean 01 Chipped/Scratched 07 Touch-up 13 Sand 02 Faulty 08 Replace 14 Paint/Stain 03 Broken/Damaged 09 Repair 15 Torn 04 Dented/Marred 10 Leak 16 Other: 05 Missing 11 Caulk CODF NO. QK ITEM CODE NO_ QK ITEM Door _ Window Shade Door Frame _ Projection Screen Sill _ Closet Rod/Shelf(s) Hardware _ Ceiling VCB _ Light Fixtures Carpet _ Diffusers/Clg. Grille VCT/Res.Fir. _ Detectors CT. Fir. _ Sprinklers CTB Fin. Radiation/Cab. Htr. _ Sinks Window Stool(s) _ Cabinets GWB Wall _ Water Closets/Urinals CT Wall _ Shower Stall/Rod/Curtain Wainscot(VCF) _ Spigots/Valves VCF Wall _ Mirrors Window _ Toilet Paper Holders SW/Plate _ Napkin Vendor/Disposal Recep/Plate _ Paper Towel Thermostat _ Exhaust Fan/Grille Comm. Outlets _ Mop Holder Fan Control/Plate _ Elec.Test Demo Clock _ Air Test, Bal. Demo Exit Sign/Light _ Plumbing Test Demo Fire Alarm Hom _ HWH Test Bal. Demo Fire Alarm Pull Station _ Equip.Test Bal. Demo Fire Extinguisher _ Ductwork Marker Board COMMENTS: ARCHITECTS CHECK LIST PROJECT: City of Beaumont—Range DATE OF OCCUPANCY: 2/24/07 House PROJECT NO.: 03010B DATE OF INSPECTION: 2/23/07 CONTRACTOR: Cleveco Construction INSPECTED BY: Greg Wall ROOM NAME: CLEANING ROOM ROOM NO.: 111 CODES: X Not Applicable 06 Adjust 12 Clean 01 Chipped/Scratched 07 Touch-up 13 Sand 02 Faulty 08 Replace 14 Paint/Stain 03 Broken/Damaged 09 Repair 15 Torn 04 Dented/Marred 10 Leak 16 Other: 05 Missing 11 Caulk CODE NO. aK ITEM CODE NO. QK IIF.m Door _ Window Shade Door Frame _ Projection Screen Sill _ Closet Rod/Shelf(s) Hardware _ Ceiling VCB _ Light Fixtures Carpet _ Diffusers/Cig. Grille VCT/Res.Flr. _ Detectors CT. Flr. _ Sprinklers CTB Fin. Radiation/Cab. Htr. _ Sinks Window Stool(s) _ Cabinets o?_&oovK 'Lj Nx W GWB Wall _ Water Closets/Urinals CT Wall _ Shower Stall/Rod/Curtain Wainscot(VCF) _ Spigots/Valves VCF Wall _ Mirrors Window _ Toilet Paper Holders SW/Plate _ Napkin Vendor/Disposal Recep/Plate _ Paper Towel Thermostat _ Exhaust Fan/Grille Comm. Outlets _ Mop Holder Fan Control/Plate _ Elec.Test Demo Clock _ Air Test, Bal. Demo Exit Sign/Light _ Plumbing Test Demo Fire Alarm Horn _ HWH Test Bal. Demo Fire Alarm Pull Station _ Equip.Test Bal. Demo Fire Extinguisher _ Ductwork Marker Board COMMENTS: !k GdLLr A *I (_ fT GNI U //V;�k" L77oA) C1 14. 4_ Aaw is L .,c ARCHITECT'S CHECK LIST PROJECT: City of Beaumont—Range DATE OF OCCUPANCY: 2/24/07 House PROJECT NO.: 03010B DATE OF INSPECTION: 2/23/07 CONTRACTOR: Cleveco Construction INSPECTED BY: Greg Wall ROOM NAME: GARAGE ROOM NO.: 112 CODES, X Not Applicable 06 Adjust 12 Clean 01 Chipped/Scratched 07 Touch-up 13 Sand 02 Faulty 08 Replace 14 Paint/Stain 03 Broken/Damaged 09 Repair 15 Torn 04 Dented/Marred 10 Leak 16 Other: 05 Missing 11 Caulk CODE NO. aK ITEM CODE NO. aK ITEM Door _ Window Shade Door Frame _ Projection Screen Sill _ Closet Rod/Shelf(s) Hardware _ Ceiling VCB _ Light Fixtures Carpet _ Diffusers/Cig.Grille VCT/Res. Flr. _ Detectors CT. Flr. _ Sprinklers CTB Fin. Radiation/Cab. Htr. _ Sinks Window Stool(s) _ Cabinets GWB Wall _ Water Closets/Urinals CT Wall _ Shower Stall/Rod/Curtain Wainscot(VCF) _ Spigots/Valves VCF Wall _ Mirrors Window _ Toilet Paper Holders SW/Plate _ Napkin Vendor/Disposal Recep/Plate _ Paper Towel Thermostat _ Exhaust Fan/Grille Comm.Outlets _ Mop Holder Fan Control/Plate _ Elec.Test Demo Clock _ Air Test, Bal. Demo Exit Sign/Light _ Plumbing Test Demo Fire Alarm Horn _ HWH Test Bal. Demo Fire Alarm Pull Station _ Equip.Test Bal. Demo Fire Extinguisher _ Ductwork Marker Board COMMENTS: ARCHITECT'S CHECK LIST PROJECT: City of Beaumont–Range DATE OF OCCUPANCY: 2/24/07 House PROJECT NO.: 03010B DATE OF INSPECTION: 2/23/07 CONTRACTOR: Cleveco Construction INSPECTED BY: Greg Wall ROOM NAME: AMMO VAULT ROOM NO.: 113 CODFS: X Not Applicable 06 Adjust 12 Clean 01 Chipped/Scratched 07 Touch-up 13 Sand 02 Faulty 08 Replace 14 Paint/Stain 03 Broken/Damaged 09 Repair 15 Torn 04 Dented/Marred 10 Leak 16 Other: 05 Missing 11 Caulk CODF NO. IE ITEM CODE NO, QE 1IEM Door _ Window Shade Door Frame _ Projection Screen Sill _ Closet Rod/Shelf(s) Hardware s27 AO0unO — Ceiling _ VCB Wkc c ju_,I�_ Light Fixtures Carpet d wbls-, _ Diffusers/Cig. Grille VCT/Res. Fir. _ Detectors CT. Fir. _ Sprinklers CTB Fin. Radiation/Cab. Htr. _ Sinks Window Stool(s) _ Cabinets GWB Wall _ Water Closets/Urinals CT Wall _ Shower Stall/Rod/Curtain Wainscot(VCF) _ Spigots/Valves VCF Wall _ Mirrors Window _ Toilet Paper Holders SW/Plate _ Napkin Vendor/Disposal Recep/Plate _ Paper Towel Thermostat _ Exhaust Fan/Grille Comm.Outlets _ Mop Holder Fan Control/Plate _ Elec.Test Demo Clock _ Air Test, Bal. Demo Exit Sign/Light _ Plumbing Test Demo Fire Alarm Horn _ HWH Test Bal. Demo Fire Alarm Pull Station _ Equip.Test Bal. Demo Fire Extinguisher _ Ductwork Marker Board COMMENTS: ARCHITECTS CHECK LIST PROJECT: City of Beaumont—Range DATE OF OCCUPANCY: 2/24/07 House PROJECT NO.: 03010B DATE OF INSPECTION: 2/23/07 CONTRACTOR: Cleveco Construction INSPECTED BY: Greg Wall ROOM NAME: AMMO LOCKER ROOM NO.: 114 CODES. X Not Applicable 06 Adjust 12 Clean 01 Chipped/Scratched 07 Touch-up 13 Sand 02 Faulty 08 Replace 14 Paint/Stain 03 Broken/Damaged 09 Repair 15 Torn 04 Dented/Marred 10 Leak 16 Other: 05 Missing 11 Caulk CODE NO. QK ITEM CODE NO, QK. ITEM Door _ Window Shade Door Frame _ Projection Screen Sill _ Closet Rod/Shelf(s) Hardware _ Ceiling VCB _ Light Fixtures Carpet _ Diffusers/Clg.Grille VCT/Res. Fir. _ Detectors CT. Fir. _ Sprinklers CTB Fin. Radiation/Cab. Htr. _ Sinks Window Stool(s) _ Cabinets GWB Wall _ Water Closets/Urinals CT Wall _ Shower Stall/Rod/Curtain Wainscot(VCF) _ Spigots/Valves VCF Wall _ Mirrors Window _ Toilet Paper Holders SW/Plate _ Napkin Vendor/Disposal Recep/Plate _ Paper Towel Thermostat _ Exhaust Fan/Grille Comm. Outlets _ Mop Holder Fan Control/Plate _ Elec.Test Demo Clock _ Air Test, Bal. Demo Exit Sign/Light _ Plumbing Test Demo Fire Alarm Horn _ HWH Test Bal. Demo Fire Alarm Pull Station _ Equip.Test Bal. Demo Fire Extinguisher _ Ductwork Marker Board COMMENTS: ARCHITECT'S CHECK LIST PROJECT: City of Beaumont–Range DATE OF OCCUPANCY: 2/24/07 House PROJECT NO.: 03010B DATE OF INSPECTION: 2/23/07 CONTRACTOR: Cleveco Construction INSPECTED BY: Greg Wall ROOM NAME: COVERED PORCH ROOM NO.: 115 •OD s• X Not Applicable 06 Adjust 12 Clean 01 Chipped/Scratched 07 Touch-up 13 Sand 02 Faulty 08 Replace 14 Paint/Stain 03 Broken/Damaged 09 Repair 15 Torn 04 Dented/Marred 10 Leak 16 Other: 05 Missing 11 Caulk CODE NO, QK IIEM CODE NO Qjs bpd Door _ Window Shade Door Frame _ Projection Screen Sill _ Closet Rod/Shelf(s) Hardware _ Ceiling VCB _ Light Fixtures Carpet _ Diffusers/Clg. Grille VCT/Res. Flr. _ Detectors CT. Flr. _ Sprinklers CTB Fin. Radiation/Cab. Htr. _ Sinks Window Stool(s) _ Cabinets GWB Wall _ Water Closets/Urinals CT Wall _ Shower Stall/Rod/Curtain — Wainscot(VCF) _ Spigots/Valves VCF Wall _ Mirrors Window _ Toilet Paper Holders SW/Plate _ Napkin Vendor/Disposal Recep/Plate _ Paper Towel Thermostat _ Exhaust Fan/Grille Comm.Outlets _ Mop Holder Fan Control/Plate _ Elec.Test Demo Clock _ Air Test, Bal. Demo Exit Sign/Light _ Plumbing Test Demo Fire Alarm Horn _ HWH Test Bal. Demo Fire Alarm Pull Station _ Equip.Test Bal. Demo Fire Extinguisher _ Ductwork Marker Board COMMENTS: �5i/7�G�aue S7A,u< � l�tt Luc. �,LC 7�Lic,�c G►clT[�`?� �' Gf1iJc -t v172"r �/L