HomeMy WebLinkAboutRES 06-166 RESOLUTION NO. 06-166
WHEREAS, construction of the street and storm sewer improvements constructed
in the Pine Glen Fifth Addition, Subdivision, have been completed as follows:
Street and Storm Sewer
E Nicole Lane from Tolivar Road approximately 1038 linear feet to proposed
Sheila Lane.
E Sheila Lane from the existing Sheila Lane end of roadway pavement
approximately 376 linear feet west to the 3-OM-4P end of roadway markers.
Water and Sanitary Improvements
E Lots 1-34, Block 1
[E] Lots 1-5, Block 3.
WHEREAS, the developers of said street desire to have these improvements
accepted and maintained by the City; and,
WHEREAS, the director of the Public Works and Engineering Department have
determined that said improvements meet city standards and qualify for acceptance for
permanent maintenance, and the City Council is of the opinion that said improvements
should be accepted and maintained by the City of Beaumont;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the above-referenced street and storm sewer improvements in the Pine Glen Fifth
Addition, Subdivision, with the exception of streetlights, are hereby accepted by the City
of Beaumont and shall be continuously maintained by the City contingent upon filing of the
final plat, complete with filings of dedication of all rights-of-way and easements required
on the preliminary and final plats and installation of the streetlights.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 6th day of June,
2006.
Mayor Guy N. Goodson -
bv.
G + u'.'mwiertdear
4�4 a W