city Of Beaunwnt
REGULAR MEETING OF THE CITY COUNCIL
COUNCIL CHAMBERS MAY 16,2006 1:30 P.M.
CONSENT AGENDA
* Approval of minutes
Confirmation of committee appointments
Pauline Mouton would be reappointed to the Martin Luther King, Jr. Parkway Commission. The
current term would expire February 2, 2008. (Mayor Guy N. Goodson)
Lynda Kay Makin would be reappointed as Vice Chairman of the Planning and Zoning
Commission. The current term would expire January 31, 2007. (Mayor Guy N. Goodson)
Lynda Kay Makin would be reappointed to the Planning and Zoning Commission. The current
term would expire April 14, 2009. (Mayor Guy N. Goodson)
A) Approve the waiver of penalty and interest on one tax account processed by the Jefferson
County Tax Assessor-Collector's Office
B) Approve the payment of an invoice for emergency roofing services performed subsequent
to Hurricane Rita
C) Approve a bid for asbestos abatement related to the structure located at 4225 Gohad
D) Approve a resolution accepting maintenance of the street, storm sewer, water and sanitary
sewer improvements in West Chase Village Subdivision, Section IV
E) Approve a resolution accepting maintenance of the street, storm sewer in Pinebrook Place
Unit Two, Phase 2 Subdivision
•
A
City of Beaumont
Council Agenda Item
TO: City Council
FROM: Kyle Hayes, City Manager
MEETING DATE: May 16, 2006
AGENDA MEMO DATE: May 12, 2006
REQUESTED ACTION: Approve the waiver of penalty and interest on one tax account
processed by the Jefferson County Tax Assessor-Collector's Office.
BACKGROUND
Section 33.011 (a)(2) of the Property Tax Code was amended by HB 1604, 76h Tex. Leg., 1999,
effective September 1, 1999 and states"the governing body of a taxing unit may waive penalties and
provide for waiver of interest on a delinquent tax if the property for which the tax is owed is acquired
by a religious organization that qualifies the property for exemption under Section 11.20 before the
first anniversary of the date the religious organization acquires the property. A letter from the Tax
Assessor-Collector is attached for your review.
BUDGETARY E"ACT
None.
PREVIOUS ACTION
None.
SUBSEQUENT ACTION
None.
RECOMMENDED BY
City Manager.
ON CO
0
AIM" K. JOHNSON
TAX ASSESSOR-COLLECTOR
NETt E WILLIAMS TRUSS IE ON COUNTY COURTHOUSE SYLVIA E.MYBRS
CHM DBP[IrY P.O.BOX 2112 BEAUMONT,TEXAS 77704 CHMP OPERATIONS MGR.
409-835-8316 FAX 409-835-6589
May 3, 2006
Kyle Hayes
City of Beaumont
P. O. Box 3827
Beaumont, TX 77704
RE: Account#062500-000/004900-00000 - Lot 2,Block 7
SUBURBAN ACRES
Dear Mr. Hayes:
Please place an item on your next Board agenda to consider and possibly approve the waiver of penalty and
interest in the amount of$1,672.76, according to Sec. 33.011 (a)(2) of the Property Tax Code, for Freeway
Baptist Church of Beaumont.
The above mentioned section of the Property Tax Code was amended by HB 1604, 76th Tex. Leg., 1999,
effective September 1, 1999 and reads as follows:
Sec. 33.011. Waiver of Penalties and Interest.
(a) The governing body of a taxing unit:
(2) may waive penalties and provide for waiver of interest on a delinquent tax
if the property for which the tax is owed is acquired by a religious organization
that qualifies the property for exemption under Section 11.20 before the first
anniversary of the date the religious organization acquires the property.
This religious organization has met the requirements as stated in 33.011 (a)(2). The church remains liable for
the full amount of delinquent levy as indicated on the Certified Tax Roll for the above referenced account.
If you have any questions, please let me hear from you.
incerel ,
L'7.19d
MIRIAM K. JOHNSO
Assessor-Collector of Taxes
Jefferson County, Texas
MKJ:tm Freeway Baptist Church-citybmt
B
M City of Beaumont
Council Agenda Item
TO: City Council
FROM: Kyle Hayes, City Manager
PREPARED BY: Brenda Beadle, Purchasing Manager
MEETING DATE: May 16, 2006
AGENDA MEMO DATE: May 10, 2006
REQUESTED ACTION: Council consider payment of an invoice for emergency roofing
services performed subsequent to Hurricane Rita.
RECOMMENDATION
Administration recommends payment in the amount of $29,907.14 to Wes Lochridge and
Asssociates of Dallas, Texas for emergency roofing repairs provided at the Julie Rogers Theater.
BACKGROUND
The Julie Rogers Theater sustained significant water intrusion throughout the structure during
Hurricane Rita, due to extensive damage to the roof system. The repairs provided by Wes
Lochridge and Associates were temporary in nature, and were a stopgap measure to halt further
water damage until a replacement roof system could be appropriately designed and installed. The
new roof system is currently out for bid.
The work was performed between December 22, 2005 and January 5, 2006 upon the
recommendation of the City's insurance carrier. At the time, the extent of damage was unknown
and payments to contractors could not be authorized until final settlements were processed by the
City's insurance carrier. Remuneration by the insurance carrier has been made to the City,
therefore, the City is responsible for compensating the contractor.
BUDGETARY IMPACT
Due to the nature of the damage, the expenditure will be funded by insurance settlement.
e
PREVIOUS ACTION
None.
Payment of Invoice for Emergency Roof Repairs-Julie Rogers Theater
May 9, 2006
Page 2
SUBSEQUENT ACTION
None.
RECOMMENDED BY
City Manager.
c
C i of Beaumont
IL Council Agenda Item
TO: City Council
FROM: Kyle Hayes, City Manager
PREPARED BY: Brenda Beadle, Purchasing Manager
MEETING DATE: May 16, 2006
AGENDA MEMO DATE: May 8, 2006
REQUESTED ACTION: Council approval to award a bid for an asbestos abatement.
RECOMMENDATION
Administration recommends the award of a bid to fin-nish all labor,materials, supplies and equipment
to remove all asbestos containing materials from the structure located at 4225 Goliad to Lynx
Contractors of San Marcos, Texas in the amount of$28,800.
BACKGROUND
The commercial structure located at 4225 Goliad was determined to be a dangerous structure and
condemned by Council on August 30, 2005. The structure's owner is deceased and the property has
sustained fire damage since it was condemned. Criminal activities have also been reported at the site.
Prior to the demolition of the building,an environmental survey must be conducted to determine the
present of asbestos containing materials. Asbestos containing materials were detected and must be
abated prior to demolition.
Asbestos containing materials include 13,000 square feet of sheetrock, 360 square feet of ceiling tile,
7,342 square feet of floor tile and mastic, and 2,420 square feet of exterior transite panels.
Additionally, the building contains an excessive amount of debris which must be removed by the
successful contractor prior to removing the asbestos materials. The successful contractor will be
responsible for the disposal of non asbestos containing materials as well as the proper disposal of
asbestos containing materials.
Asbestos Abatement- 4225 Goliad
May 8, 2006
Page 2
Eleven bids were received on Thursday, May 4, 2006 and are as follow:
Contractor Location Price Completion Time
Lynx Contractors San Marcos, TX $28,800 8 days
Clean Air Remediation Dallas, TX $37,499 12 days
Arrow Services, Inc. Houston, TX $37,900 8 days
Absolute Environmental Services Humble, TX $43,000 8 days
Inland Environments Pt. Arthur, TX $43,800 14 days
AAR Inc. Houston, TX $47,880 8 days
Ponce Contractors Dallas, TX $48,000 8 days
Olmos Abatement Austin, TX $48,744 8 days
Assured Environmental Quality Nederland, TX $49,400 8 days
Certified/LVI Environmental Houston, TX $59,229 8 days
Services
CST Environmental Houston, TX $68,800 8 days
After the abatement,bids will be solicited for the demolition of the structure.
BUDGETARY IMPACT
Funds for this project are available from Community Development Block Grant.
PREVIOUS ACTION
Building Condemnation by Council on August 30, 2005.
SUBSEQUENT ACTION
None.
RECOMMENDED BY
City Manager and Public Works Director.
D
Cit y of Beaumont
Council Agenda Item
TO: City Council
FROM: Kyle Hayes, City Manager
PREPARED BY: Tom Warner, Public Works Director
MEETING DATE: May 16, 2006
AGENDA MEMO DATE: May 8, 2006
REQUESTED ACTION: Council consider a resolution accepting maintenance of the street,
storm sewer, water and sanitary sewer improvements in West Chase
Village Subdivision, Section IV.
RECOMMENDATION
Administration recommends approval of the following:
• Amberwood Drive from the existing end of concrete pavement
approximately 707 linear feet north to and including the Cul de
Sac.
• Devonshire Drive from the proposed Amberwood Drive
approximately 148 linear feet east to the 3-OM-4P end of roadway
markers.
• Cobblestone Court from the proposed Amberwood Drive Cul de Sac
approximately 155 linear feet west to the existing end of concrete
pavement.
Also, recommended for approval are the water and sanitary improvements for Lots 13-20, Block
6; Lots 14-20, Block 7; and Lots 1-3, Block 9.
BACKGROUND
The aforementioned improvements in the subdivision passed final inspection from all entities
involved on April 19, 2006.
BUDGETARY IMPACT
None.
PREVIOUS ACTION
None.
SUBSEQUENT ACTION
None.
RECOMMENDED BY
City Manager and Public Works Director.
N` A pRi�
� 5 Cliase
Cr
Sect1A 2 _
o � �
a z
BLIIE� •.
z
umvt
,yova°�
F�agers P
MARSHALL Park.
° 3 o GLADYS
U a GR WO
a (`
o li KWQQ WSJ)
CH RRYYIo D WLDER
ZE
O°. E�FcbOW _ NfESiGA. STGAIE ..
l7RLtNGON � e
qro 00 ? a w Country BLARNEY o O 0
SS pAON Club WEAVER < M
-.. HEN DOAfl
� w
SHILOH v 00 00:
VftNGEIJ I $ O
COWER
SHIRE
VICINITY .MAP
N TS
WEST CHASE VILLAGE
SECTION IV
S SUBDIVISION
E
City of Beaumont
Council Agenda Item
TO: City Council
FROM: Kyle Hayes, City Manager
PREPARED BY: Tom Warner, Public Works Director
MEETING DATE: May 16, 2006
AGENDA MEMO DATE: May 10, 2006
REQUESTED ACTION: Council consider a resolution accepting maintenance of the street,
and storm sewer in Pinebrook Place Unit Two, Phase 2 Subdivision.
RECOMMENDATION
Administration recommends approval of the following:
Jenard Lane from the existing end of concrete pavement approximately 714 linear
feet north to the 3-OM-4P end of roadway markers.
The water and sanitary improvements for Lots 6-17, Block 4 and Lots 4-15, Block 5, has been
accepted by the City for maintenance in Pinebrook Place Unit Two, Phase 1.
BACKGROUND
The aforementioned improvements in the subdivision passed final inspection from all entities
involved on May 2, 2006.
BUDGETARY IMPACT
None.
PREVIOUS ACTION
None.
SUBSEQUENT ACTION
None.
RECOMMENDED BY
City Manager and Public Works Director.
MAIDA
y
a
KENNET I
cri
G
m PROJECT
PPN LOCATION
GARNER.
�o� x
W CASTE CHARLES
a Morgan
w P4
PICADILLY r VAMES w o
o pE1HgER a
McNALE � 3
AMILTON a
cO,y� o ZAARGO LUCAS
LANDR
O R Q
ODOM w C v" �s S Q NA SO x m
`✓ '� '� PI
I a U SU HA A
VICINITY MAP " `
YNN
HAYES ES
BEAUMONT, TEXAS HYSR
PINEBROOK PLACE
UNIT TWO, PHASE 2
SUBDIVISION
City of Beaumont
�• Council Agenda Item
TO: City Council
FROM: Kyle Hayes, City Manager
PREPARED BY: Tom Warner, Public Works Director
MEETING DATE: May 16, 2006
AGENDA MEMO DATE: May 4, 2006
REQUESTED ACTION: Council consider a resolution authorizing eminent domain
proceedings to acquire property along the northeast right of way line
of the Santa Fe Railroad line between Cottonwood Street and
Caldwell Street, for a fifteen foot(15')water line easement.
RECOMMENDATION
The property owners listed below could not be located and as a result have not accepted the
appraised value for their property. All properties were appraised by Bishop Real Estate
Appraisers:
1) 2,850 square foot tract out of City Plat D-11, Tract 44, A. Williams Survey
Appraised Value: $2,500
Owner: Emily Ann Clifton
2) 2,100 square foot tract out of City Plat D-11, Tract 7, A. Williams Survey
Appraised Value: $2,500
Owner: Estelle A. Gallier
3) 2,100 square foot tract out of City Plat D-11, Tract 5, A. Williams Survey
Appraised Value: $500
Owner: Ethel Levine
4) 2,550 square foot tract out of City Plat D-11,Tract 43 out of Tract 6A,A. Williams
Survey
Appraised Value: $525
Owner: Jimmy Mason
Administration recommends authorization to acquire the above properties by eminent domain.
BACKGROUND
The easements are to be used specifically to accommodate the installation of a thirty-six inch(36")
water transmission line along the northeast right of way line of the Santa Fe Railroad line between
Cottonwood Street and Caldwell Street.
BUDGETARY IMPACT
This project is funded under the Capital Improvement Program.
PREVIOUS ACTION
None.
SUBSEQUENT ACTION
None.
RECOMMENDED BY
City Manager and Public Works Director.
engbnsf ed4b.wpd
4 May,2005
UNE BEARING ;I CE
ETCH SHOWING t N 5442'59'E oo \
PROP. 15 FT. UTILITY EASEMENT 2 S 35'25'17'E .44' \
OUT of 3 S 55.40'51'W 72' \
A PART of 4 N 35'28'17'W .06'
THE CITY of BEAUMONT PLAT D1 1 5 S 35'26'17 E e7
in THE
6 N 8640'51'E 72' \
A. WILLIAMS SUJRVEY 7 S 3528'17'E 354.34' / Q
JANUARY 2006 a s 6640'51'W 17.72'
O -TRACT NUMBERS 9 —;'35-28-9-W 354.34'
Prepared b :
Schaumburg 6L Po Inc. --
Schau g Polk,
LT3N0 SNOI
CON9V /
F 8885 College Street
Hesumont,
Texas 77707
(409)688-0341
TOTAL vAs,,ENT ARC„ 0236 ACRE
All"
49
I
o I 5 I- 3a 2)ESTELLE GALLIER / //1)EMILY ANN CLIFTON
O
3)ESTHER LEVINE ----------}--- / - -----7�J�/�- ,'
I /[GL j�LG� ss[LL�GLG %��LL�LL!/llllll��Ull�� j /
PROPOSED 15 FT. 4)JIMMY MASON
WATER LINE EASEMENT
P.O.B. BURLINGTON NORTHERN R.R.
(EXISTING 100'R.O.W.)
I V~
City of Beaumont
REGULAR 1<'IEETING OF THE CITY COUNCIL
COUNCIL CHAMBERS MAY 16, 2006 1:30 P.M.
AGENDA
CALL TO ORDER
* Invocation Pledge Roll Call
* Presentations and Recognition
* Public Comment: Persons may speak on scheduled agenda items 1-9/Consent
Agenda
* Consent Agenda
GENERAL BUSINESS
S1. Consider authorizing the City Manager to execute a Lease and Management
Agreement with the Jefferson Theatre Limited Partnership
2. Consider a request for an appeal of the decision of the Historic Landmark
Commission on its denial of a carport at 2501 Hazel
3. Consider a request for an appeal of the decision of the Historic Landmark
Commission on its denial of paint colors on the house located at 2270 Hazel
4. Consider authorizing the City Manager to increase the Water Line Replacement
for North Street From 1101 Street to 6" Street Project amount for"extra work"
5. Consider approving a one(1)year contract for the purchase of ready mix concrete
and cement stabilized base
6. Consider approving a bid for a fuel management contract
7. Consider authorizing the City Manager to renew the contract with Beaumont
Wings, Inc. for operation of the Beaumont Municipal Airport
8. Consider approving a contract for wireless data access services
9. Consider approving a contract to purchase wireless data communication
equipment
WORKSESSION
* Review and discuss the City of Beaumont's Emergency Preparedness Plan
COMMENTS
* Councilmembers/City Manager comment on various matters
* Public Comment (Persons are limited to 3 minutes)
Persons with disabilities who plan to attend this meeting and who may need auxiliary aids or
services are requested to contact Lenny Caballero at 880-3716 three days prior to the meeting.
! 1
May 16, 2006
Consider authorizing the City Manager to execute a Lease and Management Agreement with the
Jefferson Theatre Limited Partnership
117Ej7!j City of Beaumont
Council Agenda Item
A - E g
TO: City Council
FROM: Kyle Hayes, City Manager
MEETING DATE: May 16, 2006
AGENDA MEMO DATE: May 12, 2006
REQUESTED ACTION: Council consider authorizing the City Manager to execute a Lease and
Management Agreement with the Jefferson Theatre Limited
Partnership
RECOMMENDATION
Administration recommends approval of authorizing the City Manager to execute the Lease and
Management Agreement.
BACKGROUND
The Board ofDirectors for the Jefferson Theatre Preservation Society has requested that the City of
Beaumont consider taking over the operation and management duties of the Theatre. The Theatre
was fully restored nearly three years ago with the cost of the renovation totalling approximately$6
million, $2 million of which came from Section 108 funds which are being repaid by the City of
Beaumont over a 20-year period using Community Development Block Grant funds.
The Jefferson Theatre is owned by a limited partnership which acts as the Landlord for the building.
The Preservation Society is the tenant who currently operates the Theatre. Due to tax credits used
as a part of the renovation effort, the ownership of the Theatre cannot change for a period of 66
months commencing from the time the renovation was complete in November of 2003. Therefore,
the ownership of the Theatre would remain as is until June 2009.
The attached agreement is for a one-year period with an option to renew and would commence
immediately if approved by the Council. Once the tax credit period expires,the Limited Partnership
would grant the City the right of first refusal to purchase the Theatre for one dollar. The City's
Convention Facilities Division currently manages the activities of the Civic Center, Julie Rogers
Theatre, Harvest Club, Fair Park Coliseum and Riverfront Park. The City has box office, technical
and maintenance staff on the payroll as well as equipment used to stage a production. The City
would also help preserve the historic Theatre while ensuring that the $2 Million City investment is
carried out as intended.
BUDGETARY IMPACT
The budget for the Convention Facilities Division is$860,000 for FY 2006. The net cost for the City
to assume operations and maintenance of the Jefferson Theatre is estimated to be an additional
$100,000 per year. It should be noted that any emergency maintenance repairs which may occur,and
are not budgeted for,will be the responsibility ofthe City. The City does not anticipate assuming any
debt or outstanding bills. The Purchasing Division believes the Theatre can be insured as a part of
the City's insurance policy with a minimal cost.
PREVIOUS ACTION
None.
SUBSEQUENT ACTION
None.
RECOMMENDED BY
City Manager.
��ersen C�ie�tre �
P.O. Box 1229,Beaumont,Texas 77704-1229 • 345 Fannin, Beaumont,Texas 77701 ,r
409.835.LIVE(5483) • 409.835.1248 Fax • www.jeffersontheatre.org `t fact
Carolyn Johnson, Theatre Manager -Ic�?
yor Oka April 20, 2006 00
Mayor Guy Goodson
Beaumont City Council
City Manager Kyle Hayes
Dear City Leaders,
Eight years ago the Jefferson Theatre Preservation Society undertook the
mammoth task of restoring this wonderful 1927 jewel of a performance
venue. We raised$6 million dollars, two million of which came from
federal dollars provided by the City of Beaumont, and almost three years
ago the fully restored theatre was reopened for public enjoyment. The
IJefferson Theatre has provided great entertainment and a community venue
for public rental that has added greatly to this city's quality of life.
'efferson Theatre The theatre has been managed since its opening by a California company
-reservation Society under the supervision of the Preservation Society Board. The Society has
Board of Directors sponsored three seasons of performances, attempting to build a season
Roy Steinhagen ticket support base of 500 ticket holders. Last year's season ticket sales and
President
Nancy Beaulieu the major fund raiser for the theatre season were interrupted and/or
Via President cancelled by Hurricane Rita, and we have been unsuccessful in maintaining
Mn Creswell our momentum at a level that will support another season of performances,
Past President
Richard Funchess or even basic theatre operation.
Treasurer
Linda Pate At this point in time, the hurricane damage sustained by the Jefferson
Secretary
Joan Hataway Theatre either has been repaired or, in the case of the Robert Morgan
Volunteers Wonder Organ, is under repair. Insurance money is available to take care of
Janie Hill these expenses. We have completed the season we undertook for 2005-
Programming/I'icket Sales
Barbara Knight 2006, but now find ourselves without the financial ability to underwrite
Grants another season nor, in fact,to continue to fund the utility and staff expenses
Eric Meadows associated with the Jefferson Theatre in its current configuration much
Film
Gwen Mercer beyond the end of this month.
Cultural Growth
Nell McCallum Morris It is our urgent request that the City of Beaumont consider at its earliest
Fundraising
Dan Parker convenience taking over operation of the Jefferson Theatre. The city
Theatre Operations already has the necessary technical and management staff, the equipment
Torchy Salter and the expertise to operate a theatre, and there would be an economy of
Sponsorship
'red Simon scale in combining the operation of the Julie Rogers and the Jefferson. City
.Aembership management would also protect the $2 million dollar investment the city
Lulu Smith has already made in the future of the Jefferson Theatre.
Building Preservation
Floyd Broussard,ex-officio
Charles Ege,ex-officio
Mildred Hall,ex-officio
Mayor Evelyn Lord,ex-officio
The Preservation Society is still firmly committed to its original mission:
Preserving the Jefferson Theatre in its restored condition and providing quality
entertainment for the citizens of Beaumont. We have learned, however, that theatre
operation is not what we do best. Our hope is to be able to serve the city in an
advisory capacity as the Jefferson Theatre continues to remain open and available
to the people of Southeast Texas.
We will make ourselves available, and look forward to answering any questions
you might have concerning this request, and we thank you in advance for your
consideration of this important proposal.
Sincerely,
44 4 '�
I
Janie Hill, President Roy Steinhagen, Past President
! 2
May 16, 2006
Consider a request for an appeal of the decision of the Historic Landmark Commission on its
denial of a carport at 2501 Hazel
i
1170171
City of Beaumont
IN 1COMIKIVE0102MIMM Council Agenda Item
TO: City Council
FROM: Kyle Hayes, City Manager
PREPARED BY: Tom Warner, Public Works Director
MEETING DATE: May 16, 2006
AGENDA MEMO DATE: May 8, 2006
REQUESTED ACTION: Council consider a request for an appeal ofthe decision ofthe Historic
Landmark Commission on its denial of a carport at 2501 Hazel
RECOMMENDATION
The Administration recommends denial of the request for an appeal of the decision of the Historic
Landmark Commission on its denial of a carport at 2501 Hazel.
BACKGROUND
On April 10,2006,the Historic Commission denied a request for a certificate of appropriateness that
would allow a metal carport at 2501 Hazel.
Yvonne Sharpton had a nonconforming metal carport/storage room constructed without a certificate
of appropriateness or a building permit. The carport actually extends into the street right-of-way.
The carport is located where a lawfully nonconforming beauty shop and lean-to carport originally sat.
The beauty shop and carport were destroyed during Hurricane Rita.
Sec. 30-21.2 of the Zoning Ordinance states that accessory buildings must be compatible with the
scale, shape,roof form,materials,detailing and color ofthe main building. Accessory buildings must
have pitched roofs. Prefabricated metal accessory buildings are permitted in a rear or side yard if they
are completely screened from view from any abutting street.
The Zoning Ordinance states that in an historic district,a lawful nonconforming building or structure
destroyed by an act of God may be rebuilt at the same location as long as the building does not
increase whatsoever the degree of nonconformity. However, it is the determination of the Planning
Manager that the degree of nonconformity has increased and therefore must receive approval by the
Historic Landmark Commission or, upon appeal, by City Council.
BUDGETARY IMPACT
None.
PREVIOUS AC'T'ION
At a regular meeting held April 10, 2006, the Historic Landmark Commission voted 9:0 to deny
the carport.
SUBSEQUENT ACTION
None.
RECOMMENDED BY
Historic Landmark Commission,City Manager, Public Works Director and the Planning Manager.
Yvonne Sharpton
2501 Hazel Street ^ .F ►�.�;�
Beaumont, TX 77702
April24, 2006
APR 2.4 2006
City of Beaumont
Planning Division
P.O. Box 3827
Beaumont, TX 77704-3827
I am asking permission to allow me keep the structure in question that is located at the corner of
Ninth-and Hazel Streets, at 2501 Hazel Street. This structure was built on the space and was
not pre-fabricated. This carport faces Ninth Street. I propose to pull the structure back-off the city
easement and to paint it as close to the house color as possible. The structure is 12x26 and built-
of the.same materials as the previous structures. The driveway is of crushed limestone rock which
was used by the city for their repairs:
I 1975, in keeping,with zoning requirements at that time, a beauty shop and carport were built on
this space and they'were of the same materials as this new structure. Hurricane Rita.destroyed the
building, and due to Historical District codes,I am unable to rebuild this shop. Therefore, I have
lost.-my primary means,of livelihood.
As.a result, my means are,very limited. I have already spent$2,400 on the carport. The beauty shop
was uninsured and I r have suffered a very significant loss. I am a widow and, due to my health; have
only been"able to work three days,a week. Other repairs need to be made, and as you know, it has
been very difficult to find workers since the hurricane.
request that you accept this proposal and'grant'an additional four months for completion. I
believe that it will take this amount of time to have the permit approved and find cost-effective,
competent workers.
I agree with the Oaks Historical District's goals of keeping the area neat, clean, and appropriate in
appearance. However, with these,efforts, we need to be reminded to be considerate of the people
who have made this area their home for many years. Also, in the aftermath of Hurricane Rita,
an extra degree of consideration is needed.
Thank you,
Z�110/ULQ�!Q/1�4/t
"4
r: f
f Ai.- �. a
Im
{
G
3
i -
. �"� ...-_^.-, �k�..ti-:='�.•�._:�DTs: _ ^�rH,,,�s �:
u
ORDINANCE NO.
ENTITLED AN ORDINANCE TO APPEAL THE DECISION OF
THE HISTORIC LANDMARK COMMISSION FOR THE
PROPERTY LOCATED AT 2501 HAZEL STREET,
BEAUMONT, JEFFERSON COUNTY, TEXAS.
WHEREAS, Yvonne Sharpton made a request for a certificate of appropriateness
to allow a pre-fab metal carport/storage building for property located at 2501 Hazel Street,
Beaumont, Jefferson County, Texas; and,
WHEREAS, after conducting a public hearing and hearing the evidence concerning
the application, the Historic Landmark Commission voted to deny the request; and,
WHEREAS, pursuant to the ordinances of the City of Beaumont, the applicant,
Yvonne Sharpton, has filed an appeal of the decision of the Commission to the City
Council for the City of Beaumont.
NOW, THEREFORE, BE IT ORDAINED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the Council considered the request of Yvonne Sharpton for an appeal of the decision
of the Historic Landmark Commission to deny a certificate of appropriateness to allow a
pre-fab carport/storage building on property located at 2501 Hazel in Beaumont, Texas.
The Council, after considering the request,the evidence provided in support of the request
and the staff response finds and determines that the request should be granted/denied.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 16th day of May,
2006.
- Mayor Guy N. Goodson -
• 3
May 16, 2006
Consider a request for an appeal of the decision of the Historic Landmark Commission on its
denial of paint colors on the house located at 2270 Hazel
117LJ711 L City of Beaumont
Council Agenda Item
TO: City Council
FROM: Kyle Hayes, City Manager
PREPARED BY: Tom Warner, Public Works Director
MEETING DATE: May 16, 2006
AGENDA MEMO DATE: May 8, 2006
REQUESTED ACTION: Council consider a request for an appeal of the decision of the Historic
Landmark Commission on its denial of paint colors on the house
located at 2270 Hazel
RECOMMENDATION
The Administration recommends denial of the request for an appeal of the decision of the Historic
Landmark Commission on its denial of paint colors on the house located at 2270 Hazel.
BACKGROUND
On April 10,2006,the Historic Commission denied a request for a certificate of appropriateness that
would allow the colors that Conni Rogers painted her house. The main body of the house and the
trim were painted two shades of blue. No certificate of appropriateness was applied for or approved
prior to painting the house.
Sec. 30-21.2 of the Zoning Ordiance states that property owners shall use a dominant color that
complies with the officially adopted Acceptable Color Range. Any dominant color that is not within
the officially adopted Acceptable Color Range must be reviewed and approved by the Historic
Landmark Commission based upon their appropriateness to and compatibility with the structure,
blockface and the historic district.
Ms.Rogers states that she had the two shades of blue in mind for well over a year and was not aware
that the colors were inappropriate with the Historic District guidelines. She says that she is financially
unable to repaint the house.
BUDGETARY IMPACT
None.
PREVIOUS ACTION
At a regular meeting held April 10, 2006, the Historic Landmark Commission voted 8:0:1 to deny
the paint colors.
SUBSEQUENT ACTION
None.
RECOMMENDED BY
Historic Landmark Commission, City Manager, Public Works Director and the Planning Manager.
4/18/2006
To City Council:
RE: CA-1164
My name is Conni Rogers. In April 2Q02 I was blessed to become the privileged property
owner of 2270 Hazel,Bmt, Tx. I was delighted. The house was nearly new,built in 1§98,
was at a reasonable price, and was in a great neighborhood. In February of 2006, I had
my house painted. I was totally unaware of needing to obtain pre-approval or to what I've
since learned is called a"Certificate of Appropriateness". There is no mention of any
rules due to living in the .Oaks Historic District in any of my house papers nor has anyone
ever mentioned anything. I do not wish to make trouble or create any problems,however
I must appeal your denial and ask for your reconsideration.
I am the sole provider for the household. My roommate is disabled. I work as a waitress
at Waffle House. My total gross income for last year was $4,162 (not including change).
When I bought this house I knew right away I wanted to paint it someday. I have been
saving all my change (pennies,nickels, dimes, and quarters) from waitressing for 4 years
to pay to have my house painted. I cannot tell you how many trips I have made with my
mayonnaise jar full of coins to the coinstar at Kroger's. I had two major surgeries in the
summer of 2005 which I still owe thousands for. I am on food stamps and struggling to
make ends meet.
I chose the colors I did because I felt it would compliment my beautiful green lawn. I
have had the two shade blue idea in my minds eye for well over a year not knowing it
was inappropriate because of the Oaks Historic rules. I even planted flowers(which have
unfortunately since been claimed by Hurricane Rita)and purchased blue solar lights to
correlate with a blue house.
I have had many compliments on the house since it has been painted. Including
neighbors, friends, strangers, and ironically,the postman who delivered the first letter
from you. I take great pride in my house and its appearance. My yard is always very well
kept and maintained. When I painted the house the colors I did, I'was trying to improve
the look of my property as well as the neighborhood.
I am financially unable to repaint my house. I have heard only positive remarks about the
colors I chose. I would be very grateful for your compassionate reassessment on the
denial of my paint color.
Thank-You for your time and consideration,
Conni Rogers
�,. a .,rs{ �.yey„R,H - •• .' '=fi "fii`:BWmJa WAS
,�
AV
h
V �
i I �
V
!v r h ��A •
' ti� •rye .5�.
r X _
ORDINANCE NO.
ENTITLED AN ORDINANCE TO APPEAL THE DECISION OF
THE HISTORIC LANDMARK COMMISSION FOR THE
PROPERTY LOCATED AT 2270 HAZEL STREET,
BEAUMONT, JEFFERSON COUNTY, TEXAS.
WHEREAS, Conni Rogers made a request for a certificate of appropriateness to
allow certain paint colors on her house located at 2270 Hazel Street, Beaumont, Jefferson
County, Texas; and,
WHEREAS, after conducting a public hearing and hearing the evidence concerning
the application, the Historic Landmark Commission voted to deny the request; and,
WHEREAS, pursuant to the ordinances of the City of Beaumont, the applicant,
Conni Rogers, has filed an appeal of the decision of the Commission to the City Council
for the City of Beaumont.
NOW, THEREFORE, BE IT ORDAINED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the Council considered the request of Conni Rogers for an appeal of the decision
of the Historic Landmark Commission to deny a certificate of appropriateness to allow the
paint colors to remain on her house located at 2270 Hazel Street, Beaumont, Texas. The
Council after considering the request, the evidence provided in support of the request and
the staff response finds and determines that the request should be granted/denied.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 16th day of May,
2006.
- Mayor Guy N. Goodson -
4
May 16, 2006
Consider authorizing the City Manager to increase the Water Line Replacement for North Street
From I Vh Street to Ob Street Project amount for"extra work"
f ti7sij City o Beaumont
Council Agenda Item
M - K�
TO: City Council
FROM: Kyle Hayes, City Manager
PREPARED BY: Hani J. Tohme,Water Utilities Director
MEETING DATE: Tuesday May 16, 2006
AGENDA MEMO DATE: Tuesday May 9, 2006
REQUESTED ACTION: Council approval of a resolution authorizing the City Manager to increase
the Water Line Replacement for North Street From 11 u Street to 6"`Street
Project amount for "extra work.".
RECOMMENDATION
Administration recommends approval of increasing the Water Line Replacement for North Street From
I Vh Street to 6t'Street Project by$60,995.00 to authorize Brystar Contracting,Inc to install water taps at
the intersections of North Street and 1111, 10th, 9th, 8th and 6' Streets along with 107 service line
connections. The proposed extra work will represent an increase of 15.70 percent of the original contract
amount. The total of all of the extra work to date,including this proposed recommendation,will represent
15.70 percent of the original contract amount
BACKGROUND
The existing water lines and taps were built in the 1950's have deteriorated and require replacement. The
primary goals of the project are to restore the integrity of the water lines, increase pressure, and provide
customers with uninterrupted and adequate service.
BUDGETARY IMPACT
Funds for the project are available in the Water Utilities Non-Operating Fund,
PREVIOUS ACTION
Resolution 05-249 in the amount of$388,610 was passed by City Council on November 29,2005.
SUBSEQUENT ACTION
None.
RECOMMENDED BY
City Manager and Water Utilities Director.
i
APPROVAL OF CONTRACT CHANGE
Change Order No. 1
Date:May 9,2006
Project: City of Beaumont
Water Line Replacement for North Street From I I'h Street to 6'h Street Project
Owner: City of Beaumont
P.O.Box 3827
Beaumont,Texas 77704
Contractor: Brystar Contracting,Inc.
8385 Chemical Road
Beaumont,Texas 77705
To the Owner. Approval of the following contract change is requested.
Reason for Change:To increase the contract amount for"extra work"performed by the Contractor to install water
taps at the intersections of North Street and 11'h, I CO, 9'h, 8th and 6`h Streets along with 107 service line
connections.
ORIGINAL CONTRACT AMOUNT $388,610.
THIS CHANGE ORDER:
Description Net Change
Install tap at the intersection of North and 11'h Street. $5,820a
Install tap at the intersection of North and 10'h Street. $6,180.
Install tap at the intersection of North and 9'h Street. $5,800.
Install tap at the intersection of North and 8'h Street. $6,290.
Install tap at the intersection of North and 6'h Street. $5,875.
Install 107 service line connections. $31,030.
TOTAL AMOUNT OF THIS CHANGE ORDER: 6S 0.995.
TOTAL REVISED CONTRACT AMOUNT INCLUDING
THIS CHANGE ORDER: 445 9,605.
CONDITION OF CHANGE:
"Contractor acknowledges and agrees that the adjustments in contract price and contract time stipulated in this Change
Order represents full compensation for all increases and decreases in the cost of,and the time required to perform the
entire work under Contract arising directly or indirectly from this Change Order and all previous Change Orders.
Acceptance of this waver constitutes an agreement between Owner and Contractor that the Change Order represents
an all inclusive,mutually agreed upon adjustment to the Contract,and that Contractor will waive all rights to file a
claim on this Change Order after it is properly executed."
Recommended By: Approved By: Accepted By:
Hani Tohme,P.E. City of Beaumont Brystar Contracting,Inc.
Water Utilities Director Owner Contractor
Date: Slyfti Date: Date:
5
May 16,2006
Consider approving a one(1)year contract for the purchase of ready mix concrete and cement
stabilized base
...... City of Beaumont
�• Council Agenda Item
TO: City Council
FROM: Kyle Hayes, City Manager
PREPARED BY: Brenda Beadle, Purchasing Manager
MEETING DATE: May 16, 2006
AGENDA MEMO DATE: May 9, 2006
REQUESTED ACTION: Council approval of a one(1)year contract for the purchase of ready
mix concrete and cement stabilized base.
RECOMMENDATION
Administration recommends award of a one (1) year contract for purchasing ready mix concrete
to Transit Mix Concrete of Beaumont; and to APAC-Texas, Inc. for purchasing cement stabilized
base, at the prices highlighted in the attached bid tabulation.
BACKGROUND
The contract specifies that the successful bidders shall provide ready mix concrete and cement
stabilized base at fixed unit costs for one (1) year from the date of award. The material will be
used by both the Water Utilities and Public Works Departments.
Ready mix concrete pricing was requested for both delivery to job site, with subsequent additional
charges per occurrence for deliveries of less than 5 cubic yards, and for City pickup of material
at the plant site. Depending upon the application, the departments may need a different texture
concrete than the 3,000 PSI with 1" aggregate specified in the bid. Bidders have included an
addition or deduction amount per sack for finer or coarser concrete, respectively.
Five (5) vendors were notified with three (3) submitting bids as reflected in the attached bid
tabulation.
Annual Contract for Ready Mix Concrete and Cement Stabilized Base
May 9, 2006
Page 2
BUDGETARY IMPACT
The approximate expenditure anticipated for the contract term is $205,850. Funds are available
for this expenditure in the departments' respective operating budgets. The expenditure for the
prior contract year was approximately $162,000.
PREVIOUS ACTION
None.
SUBSEQUENT ACTION
None.
RECOMMENDED BY
City Manager, Public Works Director and Water Utilities Director.
BID TABULATION: ANNUAL CONTRACT FOR READY MIX CONCRETE AND CEMENT STABILIZED BASE
BID NUMBER: RF0306-42
Vendor Transit Mix Concrete& Material Quality Concrete& Materials Apac-Texas, Inc.
City/State Beaumont,TX Beaumont, TX Beaumont, TX
Fax Number _ 409.654.3312 409.842.9393 409.866.1032
Unit Price Ext. Price Unit Price Ext. Price Unit Price, Enid Price
3,000 PSI concrete-delivered to job site $72.00 1cu yd. $64,800.00 $78.00/cu yd $70,200.00 I no bid
Add or Deduct per sack at the rate of: $5.00 1sack n/a n/a n/a no bid
Delivery charge for a partial load, 1/4-2 cu/yd $75.00 1load $4,500.00 $75.00/load $4,500.00 no bid
Delivery charge for a partial load, 2-1/4-4 -3/4 cu/y $75.00 1load $6,750.00 $75.00/load $6,750.00 no bid
3,000 PSI concrete-City pickup at plant site $62.00/cu yd. $24,800.00 $68.00/cu yd $27,200.00 I no bid
TOTAL $100,850.00 $108,650.00 1 no bid
Section III
Vendor Transit Mix Concrete & Material Quality Concrete& Materials pac-Texas, Inc.
City/State Beaumont, TX Beaumont, TX Beaumont,TX
Fax Number 409.654.3312 409.842.9393 409.866.1032
Portland Cement Treated Base: $26.45/ton $34.50/ton $21.00/ton
Location of Plant: 1250 Florida Ave. 025 Highland Ave. &2155 N. 7t 860 Pine St.
• 6
May 16,2006
Consider approving a bid for a fuel management contract
•
�► City of Beaumont
Council Agenda Item
c g
TO: City Council
FROM: Kyle Hayes, City Manager
PREPARED BY: Brenda Beadle, Purchasing Manager
MEETING DATE: May 16, 2006
AGENDA MEMO DATE: May 10, 2006
REQUESTED ACTION: Council consider award of a bid for a fuel management contract.
RECOMMENDATION
Administration recommends awarding a bid for a three (3) year fuel management contract to
various vendors as reflected in the attached bid tabulation.
BACKGROUND
G OUND
The bid separates the fuel management system into three (3) elements:
• Section I requires the vendor to provide fuel and fuel cards(with associated accounting and
reporting responsibilities on the part of the vendor)for use by City employees at the City's
automated fueling locations and at vendor-supplied retail locations throughout the City.
• Section II is the provision of bulk fuel to the City's non-automated fueling locations: Water
Utilities, Water Reclamation, Loeb Water Well, Fire Stations 1, 4, and 10, and the Fire
Training Grounds.
• Section III is for fuel delivery to the City during periods of declared emergency.
The City's fleet fueling system consists of two (2) major fuel dispensing centers located on Lafin
(30,000 gallon capacity) and Concord (20,000 gallon) Roads. These automated dispensing
centers provide drivers of City vehicles and equipment with gasoline and diesel fuel. A fuel card
is issued to each vehicle and each employee authorized to drive a vehicle is given a secure
Personal Identification Number (PIN) for access to the system. A cardreader at the sites
electronically retrieves information, such as the employee's name, vehicle unit number, fuel type,
fuel quantity, mileage or hours, gallons dispensed and transaction date and time when fuel is
dispensed. This information is collected electronically from both sites and uploaded to the fleet
Annual Contract for Fuel Management
May 10, 2006
Page 2
system software providing fuel and usage history for each vehicle or equipment unit. A tank
monitoring system at each site also retrieves data related to the maintenance of the fuel inventory
for upload to the fleet software.
Bid specifications request a vendor to provide fuel cards, fuel to the City's automated sites, and
access to off-site retail fueling locations, while providing the City with detailed transaction
information as described above. The awarded vendor shall be responsible for performing and
reporting inventory control tests as required by the Texas Commission on Environmental Quality
(TCEQ). The vendor will be compensated for fuel provided as it is dispensed to City vehicles,
following submission of the required usage reports and invoice. The estimated annual fuel usage
for this section of the contract is 180,000 gallons of gasoline, and 245,000 gallons of diesel. The
expenditure for Section I for the prior contract year was approximately $1,555,000.
The bid received from Fleetcor Technologies for Section I is $0.129 per gallon above the
published Oil Price Information Service (OPIS) weekly average price for markets in the south
central section of the United States. Fleetcor held the previous fuel contract for automated sites
at a cost of$0.0575 above OPIS. That pricing had held firm for a five (5)year period, and rising
transportation and distribution costs in recent years necessitated a significant price increase over
the previous contract for the vendor to keep pace.
Section II of the contract requests a vendor to provide bulk fuel delivery to the City's non-
automated(no cardreading devices or employee ID system) fueling sites as described above. The
estimated annual usage at the non-automated sites is 12,000 gallons of gasoline, and 90,000
gallons of diesel. The vendor is compensated for the fuel delivered after the fuel is off-loaded into
City tanks. The fuel is dispensed at the City locations by appropriate division personnel for use
in City vehicles. The only bid received for this section of the bid was from Tri-Con, at $0.086
per gallon above the OPIS weekly average for gasoline and diesel tankwagon delivery, and
$0.0272 above OPIS for diesel transport delivery. The expenditure for Section II for the prior
contract year was approximately$230,000. Tri-Con has successfully held the contract previously.
Section III of the contract provides for fuel delivery to City tanks during periods of declared
emergency. Three (3) vendors have provided bid pricing as described in the attached tabulation.
The vendors are from Beaumont, Houston, and Broussard, Louisiana, which will provide the City
with fuel delivery resources from east and west of Beaumont. This should serve to protect the
City's capability to obtain fuel in the event of a weather emergency.
The City will issue a letter of intent to each of the bid respondents for emergency fuel delivery
indicating the bidder's stated pricing, and reiterating the City's intent to purchase fuel at said
pricing during periods of emergency (subject to each vendor's capacity to deliver). The City shall
have discretion to utilize the fuel vendor it deems most advantageous during an emergency, and
shall not be restricted to purchasing from any of the three (3) respondents.
Annual Contract for Fuel Management
May 10, 2006
Page 3
BUDGETARY IMPACT
Funds are provided in the Fleet Maintenance Division's operating budget.
PREVIOUS ACTION
None.
SUBSEQUENT ACTION
None.
RECOMMENDED BY
City Manager.
� s !
BID TABULATION FOR FUEL MANAGEMENT SYSTEM
BID NUMBER: RF0306-41
SECTION I -Fees for Fuel Dispensed from Automated Sites (above OPIS weekly average price)
Vendor Fleetcor Technologies
City i State Norcross,GA
Fax No. 704-853-1945
Unleaded 87 Octane $+.129/gal
Diesel $+.129/gal
Brand or Trade name No brand posted
SECTION II -Fees for Fuel Delivery to Non-Automated Sites (above OPIS weekly average price)
Vendor Tri-Con Inc.
City/State Beaumont,TX
Fax No. 409-838-1925
Tankwagon
Unleaded 87 Octane $+.086/gal
Diesel $+.086/gal
Transport
Unleaded 87 Octane N/A
Diesel $+.0272/gall
Brand or Trade name ExxonMobil or Chevron Texaco J
SECTION III -Fees for Emergency Fuel Delivery(all fees above OPIS daily average price on delivery date)
Vendor Tri-Con Inc. Sun Coast Resources, Inc. Macro Oil Co.
City/State Beaumont,TX Houston,TX Broussard, LA
Fax No. 409-838-1925 713-844-9635 337-839-5006
Vendor Margin/Gallon $+.015/gal $+.020/gal $+.10/gal
Delivery charge per gallon per mile $+.05/mile N/A N/A
Delivery charge per truck per hour $+75.00/hour $+250.00/hour _ $+ 150.00/hour
7
May 16, 2006
Consider authorizing the City Manager to renew the contract with Beaumont Wings, Inc. for
operation of the Beaumont Municipal Airport
179'_1~ Cit y of Beaumont
1f Council Agenda Item
A C
TO: City Council
FROM: Kyle Hayes, City Manager
PREPARED BY: Jim Thompson, Special Projects Manager
MEETING DATE: May 16, 2006
AGENDA MEMO DATE: May 11, 2006
REQUESTED ACTION: Council authorize the City Manager to renew the contract with
Beaumont Wings, Inc. for operation of the Beaumont Municipal
Airport.
RECOMMENDATION
The Administration recommends renewing the contract with Beaumont Wings, Inc. (BWI) for ten
(10)years as the Fixed Base Operator(FBO) at the Beaumont Municipal Airport.
BACKGROUND
On January 25, 2000, City Council approved the sale of BWI and assignment of the existing FBO
contract to Gary Giarraputo. The previous owner,whose participation began in 1991, asked to be
released from his obligations due to health problems.
The current contract expires March 31, 2007. Mr. Giarraputo is requesting that the agreement be
renewed under the same terms and conditions for a period of ten (10) years, with an option for an
additional five (5)years, subject to mutual agreement at that time.
Beaumont Wings has six (6) full-time employees, including three (3) licensed aircraft mechanics
who provide maintenance and repair services at an on-site shop. This shop was built by Mr.
Giarraputo on airport property and is under lease with the City of Beaumont until 2031. The
company,run by owners Gary and Barbara Giarraputo,has established a good working relationship
with the aviation community. BWI has sufficient aircraft and refueling equipment to continue to
successfully serve the needs of the community. The renewal of this contact will allow the FBO to
revise his business plan and seek the financing needed for an additional airplane to be used to
provide flying lessons and a refueling truck.
Renew FBO Contract/Beaumont Wings. Inc.
May 11, 2006
Page 2
Since his affiliation with the City,the staff has been very satisfied with Mr.Giarraputo's dedication,
performance and cooperation. Mr. Giarraputo is optimistic about the potential that exists at the
airport and wants to continue to build his business. He has assisted the City on various projects and
is participating in the Airport Development Plan which is currently underway.
BUDGETARY IMPACT
None.
PREVIOUS ACTION
None.
SUBSEQUENT ACTION
None.
RECOMMENDED BY
Recommended by the City Manager.
8
May 16, 2006
Consider approving a contract for wireless data access services
MONK f..ON
Cit y of Beaumont
Council Agenda Item
TO: City Council
FROM: Kyle Hayes, City Manager
PREPARED BY: Brenda Beadle, Purchasing Manager
MEETING DATE: May 16, 2006
AGENDA MEMO DATE: May 9, 2006
REQUESTED ACTION: Council authorization to participate in a contract for wireless data
access services.
RECOMMENDATION
Administration recommends participation in a two (2)year contract with Cingular Wireless for the
purchase of wireless data access services at the rate of$49.59 per month per mobile computer plus
an activation fee of$2,995 through the State of Texas Cooperative Purchasing Program, TEX-AN
2000.
BACKGROUND
The City's recent public safety communications system upgrade included the purchase of
approximately 146 mobile computers installed in Police, Fire, and EMS vehicles. Each mobile
computer requires an air card and wireless high speed data access services in order to function within
the wireless communication system.
TEX-AN 2000 contracts provide all Texas Building and Procurement Commission Cooperative
Purchasing Program participants with access to competitively bid telecommunication services
including wireless high speed data access services.Cingular Wireless is an authorized TEX-AN 2000
contractor offering data access services and equipment.
A two(2)year contract with Cingular Wireless includes an air card for each mobile computer at no
charge to the City. This results in a cost savings of approximately$7,300 by eliminating the need to
purchase 146 air cards at $49.99 each. The contracted monthly rate for the data access service is
$49.59 per mobile computer.The total estimated annual cost ofproviding data access service for 146
mobile computers is approximately$86,882. A one-time activation fee of$2,995 is also required.
Contract for Wireless Data Access Services
May 9,2006
Page 2
BUDGETARY IMPACT
Funds are budgeted for this expenditure in the Police, Fire, and EMS operating budgets.
PREVIOUS ACTION
None.
SUBSEQUENT ACTION
None.
RECOMMENDED BY
City Manager.
9
May 16, 2006
Consider approving a contract to purchase wireless data communication equipment
•
i
City of Beaumont
NOW W Council Agenda Item
TO: City Council
FROM: Kyle Hayes, City Manager
PREPARED BY: Brenda Beadle, Purchasing Manager
MEETING DATE: May 16, 2006
AGENDA MEMO DATE: May 9, 2006
REQUESTED ACTION: Council consider the purchase of wireless data communication
equipment.
RECOMMENDATION
Administration recommends the purchase of Global Positioning System (GPS)receivers for$432
each and antennae for$81 each from Portable Computer Systems, Inc., of Golden, Colorado.
BACKGROUND
In December 2005,Council approved a public safety communications system upgrade including the
purchase of mobile computers for installation in Police, Fire, and EMS vehicles. GPS receiver
positioning units and antennae are required for the mobile units to interface with the wireless data
communications system.
Bids were solicited from ten (10) vendors for Trimble Placer GPS 450 trunk mountable receiver
mobile positioning units and AntennaPlus brand antennae. The following bids were received:
140 Receivers 140 Antennae
Vendor
Unit Price Total Price Unit Price Total Price
Portable Computer Systems, Inc.
Golden, CO $432.00 $60,480.00 $81.00 $11,340.00
Triangle Communications, LLC
Stirling, NJ No Bid $88.00 $12,320.00
AntennaPlus, LLC
Scottsdale AZ No Bid $96.30 $13482.00
I
Wireless Data Communication Equipment
May 9,2006
Page 2
BUDGETARYIMPACT
Funds are available in the Capital Improvement Project Fund for the purchase of wireless data
communication equipment for the total amount of approximately$71,820.
PREVIOUS ACTION
None.
SUBSEQUENT ACTION
None.
RECOMMENDED BY
City Manager and Finance Officer.
VCR
BEAUMONT,TEXAS C
Bui* ldi* ng Te Future
Capital Program
Fiscal Year 2007 = 2011
fwr• �"?.9A�' ,. t��. �=rte: ..
;r,• Y 1 Lx�� �, �� •�s.
t'r`Y
Opp
�. r•.<' it -
r
Y
y of Beaumont
Integrity Service Leadership' . rj
May 12 2006
Honorable Mayor and City Council:
The Capital Program is a plan prepared annually to provide for both short and long range
physical development within the City of Beaumont.The City Charter requires the submission
of the Capital Program to Council as part of the financial planning process. The Program is
adopted with the annual operating budget and allows for project evaluation at a
comprehensive level and also provides the financial information necessary to plan and
anticipate potential changes to the tax structure, user fees, and bonded indebtedness.
Generally, a capital improvement has the following characteristics: relatively high monetary
value (at least $50,000), long life (will last at least 10 years), and results in either the
creation of a fixed asset, or the revitalization of one. Fixed assets are resources owned by
the City which have monetary value, long-term character and will be held or used. Examples
are land,buildings,and improvements to land otherthan buildings. Included within the above
definition are the following specific items: purchase, improvement and development of land;
construction of newfacilities for the delivery of City services; remodeling of existing facilities;
and the planning/engineering costs related to speck improvements of the type listed above.
The Capital Program includes a listing of all Public Works, General Improvements and
Water and Sewer improvement projects along with project descriptions and cost estimates.
Public Works includes street and storm water drainage projects; General Improvements
include general government municipal buildings and facility improvements. Water and
Sewer includes all projects related to water and sewer infrastructure.
Approved projects are classified in two phases: design or construction and planned. A
project classed in the design or construction phase is under design and rights-of-way
may be acquired or is underway or will be within the recommended time schedule. Projects
classified as planned are projects in the preliminary development or design stage.
Financing for the Capital Program is provided by the "cash flow" approach, whereby debt is
issued to generate enough cash to pay the expenditures anticipated during the year for both
existing and new projects. This approach provides the most efficient use of citizens' dollars
by allowing multi-year projects to be initiated without issuing debt for the full cost of the
projects at the time of project commencement. All available funding sources are considered
including Certificates of Obligation and Community Development Block Grant funds. ■
Based on a "cash flow" approach, the City issues Certificates of Obligation (CO's) on an as
needed basis, to provide sufficient cash flow for active Public Works and General
Improvement projects. Weather, planning, design and construction costs all factor into the
decision of when and how much debt to issue.
Utilities Department has taken an aggressive approach to identify and implement
The Water U p 99 PP fy
necessary improvements to the water and sewer systems. In many instances, these
renovations are required to meet federal and state mandates as well as meet the needs of
the City's growth.
Funding for Water and Sewer projects is determined similar to the Public Works and General
Improvement projects in that it uses the cash flow approach; however, Water Revenue
Bonds are issued rather than tax supported Certificates of Obligation. This type of bond is
serviced utilizing revenues from water and sewer usage.
The Capital Program includes projects to enhance the quality of life the City of Beaumont
strives to achieve for its residents. This plan represents our best effort to allocate available
resources toward projects that provide the most benefit for the citizens of Beaumont. The
City Council will annually review and approve updates to this plan, and projects may be
revised during this process.
Respectfully Submitted,
/lk/ /C f
Kyle Hayes
City Manager
Capital Program
FY 2007 - 2011
Program Summary
Estimated Cost
Public Works Projects
Design or Construction $ 153,500,000
Planned 130,970,000
Total $ 284,470,000
General Improvement Projects
Design or Construction $ 31,230,000
Planned 20,780,000
Total $ 52,010,000
Water and Sewer Projects
Design or Construction $ 75,510,000
Planned 34,170,000
Total $ 109,680,000
Total Capital Program Cost $ 446,160,000
PUBLIC WORKS PROJECTS
FY 2007 -2011
Recommended
Time Schedule
Design or Construction Phase Estimated Cost FY 2007-2009
Babe Zaharias Drive $ 1,350,E
Brakes Bayou 1,150,000 (t1
Calder- Main to Phelan 47,155,000 121
Cartwright/Coliey-Ditch 100d 1,200,000 131
Concord IV - E.Lucas to Hwy.105 11,500,000 14]
Ditch No. 117 739,000 (11
Dowlen - College to Walden 9,700,000 (51,[61
Dowlen - US 69 N to Delaware 10,100,000 [5]
Downtown Improvements
Pearl - College to Calder 2,100,000
Neches - College to Laurel 1,400,000
Willow and Park - College to North 2,350,000 M
Pearl Street - Calder to North 540,000
Future Improvements 2,400,000
Fannett Road 600,000 (51
Griffing Ditch 350,000 [8]
Hayes Gully 2,786,000 [91
Illuminated Street Markers
Signalized Intersections-160 Locations 1,000,000
Laurel - IH-10 to Office Park 4,480,000 [51
Main - Calder to Blanchette 4,500,000
North Street - ML King to Twenty-Third 7,200,000
Old Dowlen - Dowlen to Hwy.105 5,000,000 [101
Phelan - Major to Keith 3,500,000
Rolfe Christopher - US 69 S to Virginia 4,000,000
Seventh Street - IH-10 to Laurel 4,000,000
Street Rehabilitation 5,000,000
Washington - IH-10 to ML IGng 14,900,000
Washington - Langham to Major 3,900,000 [5],p ij
Wendel(n/Kelly 600,000
Total Design or Construction Phase $ 153,500,000
Planned Projects FY 2007-2011
Avenue A-Washington to U.S.69 S $ 7,000,000
Caklwood Outfall 5,230,000
College Street - IH-10 to Goliad 7,320,000
Delaware - Concord to Dowlen 11,520,000
Dowlen - Delaware to Gladys 7,150,000
East Lucas-U.S.69 N to Pine Street 12,000,000
Eleventh Street - Washington to US 69 15,000,000
Gladys Street - IH-10 to Dowlen 8,000,000
High School Ditch 8,700,000
• Madison - Irving to Grove 2,350,000
Magnolia - Liberty to E Lucas 12,600,000
Moore Street Relief 5,600,000
North Main Street - Calder to RR Tracks 1,800,000
Phelan - IH-10 to Dowlen 15,600,000
Pine Street - IH-10 to Crockett 3,600,000
South Park Relief 7,500,000
Total Planned Projects E 130,970,000
Grand Total $ 284,470,000
[11 This is a participation project with the Water Development Board and D006.The grant is a pass through with no cost to the City.
[2]Includes FEMA Funding of$23,665, and other potential funding or$7,889,820
[3]This is a joint participation project with DDi8.The estimated cost to the City is$1.200,000
[4]ktchidos Federal Highway Aduninistra funding o(80 percent up to 57,375.000. Construction start is September 2007.
[51 Air Quality issues will not be determined until a later data and could effect project timeline.
[6]Includes Federal Highway Administration Funding of$2,764,800.
M Includes Federal Highway Administration Funding of 5512,000 for the section of Willow between North and Crockett
[a]This is a participation project with DON.The es imdad cost to the City is W350,000.
19]This is a participation project with the Texas Water Development Board and DDM6.The estimated cost to the City is$2,089,787.
[10]Includes TxDOT fondue 011`80 percent up to$2,400,000 for both phases. TxDOT construction start date for phase II is 2007.
(111 Includes Federal Highway Administration Funding of 53,080,000
i
GENERAL IMPROVEMENT PROJECTS
FY 2007-2011
Recommended
Time Schedule
Design or Constriction Phase Estimated Cost FY 2007-2009
Alice Keith Park Playground Renovations $ 100,000
Central Park Community Center 500,000
City Hall Rooftop Air Handler 440,000
Community Facilities
Alice Keith Park 500,000
Rogers Park 500,000
North End Location 500,000
Demolition of Public Facilities&Commercial Structures 3,000,000
Detention Facility Hike&Bike Trail 720,000
Downtown Event Center&Lake Park 6,500,000
Fire Fleet Maintenance Shop 460,000
Fire Station Relocation/Administration 4,590,000
Julie Rogers Theatre 2,900,000
Lambs Building Replacement 750,000
Main Library Improvements 200,000
Martin Luther King,Jr.Park 600,000
911 Operations Center 2,310,000 (1)
Public Safety Communication Hardware/Software 3,000,000 [2]
Rogers Park Walking Trail&Parking Lot 200,000
Tyrrell Historical Library Addition 1,930,000
Visitor Center/CVB 1,530,000
Total Design or Construction Phase $ 31,230,000
Planned Proiects FY 2007-2011
Athletic Complex Restroom Facilities 380,000
Civic Center Demolition 350,000
Fire Station Driveway Replacements 150,000
Fleet Parking Lot 1,500,000
Police Department Building 11,000,000
Public Health Department Building 2,500,000
Riverfront Park Improvements 2,000,000
Senior Center 2,300,000
Tyrrell Park Community Building and Improvements 600,000
Total Planned Projects $ 20,780,000
Grand Total $ 52,010,000
[1)Includes Federal Grant of$68,000
[21 Includes Federal Grant of$892,000
WATER AND SEWER PROJECTS
FY 2007-2011
Recommended
Time Schedule
Design or Construction Phase Estimated Cost FY 2007-2009
Master Plan for Water&Sewer System $ 400,000
Water Projects:
2 MG Elevated Storage Tank on Dishman 2,800,000
36"Transmission Line 6,400 000
Automatic Flushing 100,000
Dredge Ponds 1&2 Wastewater Treatment Plant 1,200,000
Initial Distribution System Evaluation(IDSE) 100,000
Leak Detection Project 350,000
Northwest Elevated Storage Tank Rehabilitation 620,000
Water Line Extension on IH-10(between Brooks&Walden) 890,000
Water Line Extensions/Replacement 3,000,000
Water Meter Relocation 810,000
Water Plant Improvements-Phase 1 7,000,000
Water Plant Improvements-Phase II 3,000,000
Wies Bluff Bank Stabilization 1,500,000 0]
Sewer Projects:
54'Central Trunk Rehabilitation 5,500,000
54"West Trunk Outfall-Phase 1 2,330,000
54"West Trunk Outfall-Phase II 1,620,000
60"Trunk Line Rehabilitation 3,390,000
Ammonia Addition to Loeb Well 250,000
Degritter-Waste Water Treatment Plant 1,210,000
Filter Rehabilitation-Wastewater Treatment Plant 1,900,000
Florida Lift Station 510,000
Generator(2)Installation-Wastewater Treatment Plant 2,500,000
Grit Pumps Replacement-Wastewater Treatment Plant 150,000
Lift Station Repairs 900,000
Sanitary Sewer Rehabilitation-Small Mains(Pipe Bursting) 6,000,000
Sanitary Sewer Line Extension on IH-10(between Walden&Brooks) 890,000
Wetlands Evaluation-Phase 1 170,000
Wetlands Evaluation-Phase 11 200,000
Wetlands Rehabilitation 3,000,000
WaterlSewer for Street Projects:
Calder-Main to Phelan 2,080,000
Concord Road-Phase IV-East Lucas to Hwy.105 1,140,000
Dowlen Road-College to Walden 1,560,000
Dowlen Road-US 69 N to Delaware 910,000
Downtown Improvements:
Neches-Laurel to College 210,000
Willow and Park-North to College 700,000
Pearl Street-Caller to North 140,000
Laurel-IH-10 to Office Park 490,000
Main Street-Caller to Blanchette 840,000
North Street-ML Icing to Twenty-Third 960,000
Old Dowlen-Dowlen to Hwy.105 530,000
Pearl Street-College to Calder 410,000
Phelan Blvd.-Major to Keith 720,000
Rolfe Christopher-US 69 S to Virginia 330,000
Seventh Street-I1-1-10 to Laurel 510,000
Tyrrell Park Road Resurfacing 1,560,000
Washington-IH-10 to ML Fling 2,000,000
Washington-Langham to Major 1,730,000
Total Construction Phase $ 75,510,000
Water Utilities Continued
Recommended
Time Schedule
Planned Projects FY 2007-2011 t
Lift Station Repairs $ 600,000
Sanitary Sewer Rehabilitation-Small Mains(Pipe Bursting) 4,000,000
Waste Water Treatment Plant Ground Improvements 1,000,000
Water Line Extension/Replacement 2,000,000
Water Plant Improvements-Phase II 15,000,000
Water7Sewer for Street Projects:
Avenue A-Washington To US 69 S 650,000
College Street-IH-10 to Goliad 840,000
Delaware-Concord to Dowlen 2,730,000
Dowlen Road-Delaware to Gladys 630,000
E. Lucas-US 69 N to Pine 1,920,000
Eleventh Street-US 69 N to Washington 440,000
Gladys Street-I1-1-10 to Dowlen 1,280,000
Madison-Irving to Grove 110,000
Magnolia-Liberty to E.Lucas 1,770,000
North Main Street-Calder to Railroad Tracks 170,000
Phelan Blvd-IH-10 to Dowlen 590,000
Pine Street-I1-1-10 to Crockett 440,000
Total Planned Projects $ 34,170,000
Grand Total $ 109,680,000
[t]Includes funding from Natural Resources and Conservation Services.Cost to City is$500,000
PUBLIC WORKS
PROJECT DESCRIPTIONS
PUBLIC WORKS PROJECTS
FY 2007 - 2011
AVENUE A -WASHINGTON TO U.S. 69 SOUTH
This section of Avenue A is a two-lane concrete and asphalt roadway that provides access from
Washington Boulevard to U.S. 69 South. Avenue A south of U.S. 69 South was reconstructed by
the Texas Department of Transportation and is identified as Spur 93. The project will consist of
reconstructing the existing roadway as a concrete curb and gutter street.The estimated cost of the
project is $7,000,000.
BABE ZAHARIAS DRIVE
Babe Zaharias Drive is located within Tyrrell Park and is a two-lane asphalt roadway with open
ditches.The project will consist of reconstructing the existing roadway with concrete pavement and
open ditches. The estimated cost of the project is$1,350,000.
BRAKES BAYOU
Brakes Bayou flows southerly along the east side of Beaumont and ties into the Neches River 2.2
miles south of Pollard Street which is the southern boundary of the project area.The upper reaches
of Brakes Bayou,starting 150 feet south of Pollard Street,consists of underground culverts varying
in size from 72 inches at the lower end to 36 inches at the upper end.This underground system that
serves 163 acres is currently undersized.The proposed project includes the construction of an open
channel, the installation of additional underground culverts at various street crossings and the
installation of 700 feet of box culvert along Willie Mae Street.
This is a joint participation project between the Texas Water Development Board,Drainage District
No. 6 and the City of Beaumont. The project will be funded from a Flood Mitigation Assistance
(FMA)Grant and by Drainage District No.6. In order to receive the grant funding it was necessary
for the City to submit the application to the Board.The estimated cost of the project is$1,150,000
with 70 percent FMA Grant funding and a 30 percent local (DD6) match.
CALDER-MAIN TO PHELAN
The section of Calder Avenue from Main Street to W. Lucas is a heavily traveled roadway that
provides access from downtown to the west end of the City.The current roadway is four lanes with
a continuous left-tum lane from Main Street to west of IH-10 and two lanes with a continuous left-
turn lane from west of IH-10 to W. Lucas. The condition of the existing pavement is poor and
requires rehabilitation. This project will include the rehabilitation of the existing roadway.
Additionally, this is a joint participation project with Drainage District No. 6 and the Federal
Emergency Management Administration. The DD6 has received a FEMA grant in the amount of
$23,665,180 to install an underground storm drainage system from W.Lucas to the Neches River.
In conjunction with this grant,the City will be applying for an additional$7,889,820 in federal funding
to meet the 80/20 grant match requirement. It is estimated that when complete, the project will
remove more than 900 structures from FEMA's repetitive loss listing.
The estimated cost of the project is$47,155,000.
CALDWOOD OUTFALL
When completed,this project will increase the capacity of the Caldwood Addition Outfall and relieve
street flooding.The project includes installation of inlets and laterals on Bristol, Sunbury, Medford,
Canterbury and the reconstruction of the streets. Also included is the installation of new laterals,
replacement of inlets and reconstruction of Cross, North Caldwood, Central Caldwood, South
Caldwood and West Caldwood Streets. The estimated cost of this project is$5,230,000.
CARTWRIGHT/CORLEY
The Cartwright/Corley Drainage Project is a participation project with Drainage District No. 6. The
project includes the installation of detention ponds and an underground storm drainage system in
the Cadwright/Corley area between 4'"and IH-10.The City will be responsible for the installation of
an underground drainage system on Blanchette Street near 11t" Street. The City's share of the
project cost is$1,200,000.
COLLEGE STREET-IH-10 TO GOLIAD
The section of College from Goliad to Eleventh Street was constructed in the mid 1980's. At that
time the street was constructed with an asphalt surface due to funding availability.This section has
reached the end of its useful life and is beginning to experience pavement failures.The project will
provide for the reconstruction of College,with concrete pavement,from IH-10 to Goliad.Estimated
cost of this project is$7,320,000.
CONCORD ROAD-PHASE IV
This project will relieve the north/south traffic congestion on Eastex Freeway and provide an
extension of M. L. King, Jr. Parkway. The first three phases and the Delaware Outfall have been
completed.Phase IV includes the reconstruction of Concord Road from East Lucas to Highway 105.
The Federal Highway Administration(FHWA) has allocated 80°x6 up to$7,375,000 for this phase of
the project. The estimated cost of Phase IV is$11,500,000.
DELAWARE-CONCORD TO DOWLEN
The construction of Phase If of the Concord Road Project included the reconstruction of Delaware
from Pine to Concord. This project will complete the reconstruction of Delaware from Concord to
Dowlen. Estimated cost of this project is$11,520,000.
DITCH NO. 117
The Upper Hillebrandt Ditch No. 117 watershed consists of 227 acres and is generally bounded on
the north by Arthur Lane,Gladys Avenue on the south,23rd Street on the east and W.Lucas on the
west.The primary cause of flooding in this area is undersized box culverts just below the Ditch No.
117 watershed. The proposed improvements include the construction of a detention basin and
culverts at the northern end of the watershed.The detention basin would be located near the former
Wal-Mart site on Eastex Freeway.
This is a joint participation project between the Texas Water Development Board,Drainage District
No. 6 and the City of Beaumont. The project will be funded from a Flood Mitigation Assistance
(FMA)Grant and by Drainage District No. 6. In order to receive the grant funding it was necessary
for the City to submit the application to the Board.The estimated cost of the project is$739,000 with
56 percent FMA Grant funding and a 44 percent local (DD6) match.
DOWLEN -COLLEGE TO WALDEN
The extension of Dowlen Road to the south of College is needed to provide an additional north/south
corridor in the developing southwest area of the City. Specifically, it will extend from College to
Walden Road. The right-of-way has been donated by property owners adjacent to the corridor.
Estimated cost for this project is$9,700,000. The City has received federal funding in the amount
of$2,764,000 for this project. Air quality issues will not be determined until November 2007 and
could affect project timeline.
DOWLEN -DELAWARE TO GLADYS
The section of Dowlen Road from Delaware to Gladys is beginning to experience failures at or near
the catch basins.This project will include the rehabilitation of the entire roadway section.Estimated
cost is$7,150,000.
DOWLEN -US 69 N TO DELAWARE
The section of Dowlen Road from US 69 to Delaware is beginning to deteriorate along the curb lane,
primarily at or near the catch basins.Additionally,the project will relieve congestion in the Parkdale
Mall area by adding an additional lane in each direction within the project limits.The estimated cost
of the project is $10,100,000. Air quality issues will not be determined until November 2007 and
could affect project timeline.
DOWNTOWN IMPROVEMENTS
The downtown area is currently experiencing a tremendous amount of private investment.To make
downtown more attractive and entice further capital investment,the City will continue to make street,
sidewalk,lighting and landscaping improvements.The initial project paved Crockett Street between
Main and Pearl, and installed brick sidewalks in the surrounding block. It was followed by sidewalk,
lighting and landscaping improvements on Orleans from Wall to Crockett. This project continues
these improvements on Pearl from College to Calder. Estimated cost is $2,100,000. The next
sections,which cover Neches Street from Laurel to College and Willow and Park Streets from
North to College, are currently in the design phase. Estimated costs for these projects are
$1,400,000 and$2,350,000,respectively.This project also includes the rehabilitation of North Pearl
Street from Calder to North Street. It will include improvements at the Calder and Pearl intersection
to improve a drainage problem.The estimated cost of this project is$540,000. Estimated cost for
future locations is$2,400,000.The City has received federal funding in the amount of$512,000 for
the section of Willow Street from North Street to Crockett Street.
EAST LUCAS-U.S.69 NORTH TO PINE
The section of E. Lucas from U.S. 69 North to Magnolia is a four and five lane concrete curb and
gutter street and a two-lane asphalt roadway from Magnolia to Pine Street.This project will consist
of reconstructing the street from U.S.69 North to Magnolia at an estimated cost of$8,500,000 and
r constructing a three-lane concrete curb and gutter street from Magnolia to Pine at an estimated cost
]4 of$3,500,000. The total estimated cost of this project is$12,000,000.
ELEVENTH STREET-WASHINGTON TO US 69 NORTH
Eleventh Street from Washington to US 69 is experiencing failures from numerous utility cuts and
base failures. Sections of the concrete curb and gutter roadway have been overlayed with asphalt
f to extend the life of the street. The estimated cost of this project is$15,000,000.
1
FANNETT ROAD
The section of Fannett Road from west of Ethel Street to east of Cardinal Drive (US 69, 96&287)
Frontage Road is constructed as a two-lane roadway with left turn lanes at 11th Street.This project
will include the widening of this section to a four-lane roadway similar to the sections east of Ethel
Street and at the Cardinal Drive Frontage Road. The estimated cost for this project is$600,000.
GLADYS STREET-IH-10 TO DOWLEN
Gladys Street from IH-10 to Edson is a four-lane concrete curb and gutter roadway.The section from
Edson to Dowlen is a two-lane asphalt roadway with curbs and gutter. This project will consist of
rehabilitating the concrete section and reconstructing the section from Edson to Dowlen as a
concrete roadway. The estimated cost of this project is$8,000,000.
GRIFFING DITCH
The Griffing Ditch Project is a joint project between Jefferson County Drainage District No.6 and
the City of Beaumont. The proposed improvements to be constructed by DD6 are located on the
Griffing Ditch north of Highway 105.The City will provide funding to the District for the enlargement
of the drainage structures under City streets. Estimated cost of this project is$350,000.
HAYES GULLY
The lower(downstream)part of this 262-acre watershed is served by a concrete lined open channel
known as Hayes Gully.This gully is a tributary to the Neches River and flows into the Neches River
Marsh on the northeast side of Beaumont. The gully, after crossing East Lucas, west of Magnolia
Street,crosses five city streets with box culverts and then goes underground at Fillmore Street.This
area of the watershed is currently served by an underground 72 and 48-inch culvert.The proposed
project includes the installation of an open channel that will run parallel to an existing 1,100 foot long
run of underground pipe,the installation of additional box culverts and improvements to existing
street crossings.Property will need to be acquired in order to install the open channel. Most of the
properties are abandoned and in disrepair due to previous flooding that has occurred in the area.
This is a joint participation project between the Texas Water Development Board,Drainage District
No. 6 and the City of Beaumont. The project will be funded from a Flood Mitigation Assistance
(FMA) Grant and the City of Beaumont. The estimated cost of the project is $2,786,000 with 75
percent($2,089,500) FEMA funding and a 25 percent($696,500) City match.
HIGH SCHOOL DITCH
There are two remaining phases of the High School Ditch project, South and North. Each section
consists of the installation of trunk lines, inlets, manholes and connecting pipe improvements that
are required to complete the drainage improvements in the entire High School Ditch area.This area
covers approximately 600 acres and is served mostly by an underground storm sewer system.
Estimated cost for this project is$8,700,000.
ILLUMINATED STREET MARKERS
This project consists of the installation of illuminated street markers at the City's 160+ signalized
intersections.The street markers are currently being installed as a part of the various street projects.
The$1,000,000 allocated forthis project will be used to install the markers at signalized intersections
that are not a part of an existing or proposed street project.
LAUREL-IH-10 TO OFFICE PARK
Due to increased traffic from the Liberty/Laurel project, the widening of Laurel, between the IH-10
west service road and 23rd Street, into a four-lane roadway is proposed. This project will relieve
traffic congestion in the area, particularly during heavy traffic hours.Also included is the provision
fora direct connection between Laurel and the Liberty-Laurel overpass project.The short connection
between these two projects is needed to complete the roadway system involved with the IH-10
overpass.This project,in conjunction with the Calder project,will complete the arterial system in this
area. Estimated cost for this project is $4,480,000. Air quality issues will not be determined until
November 2007 and could impact project timeline.
MADISON STREET-IRVING TO GROVE
Madison Street,from Irving to Grove,is the primary truck route forthe industrial district located east
of Carroll Street and along Gulf States Road. The existing concrete pavement is deteriorating and
should be replaced. Estimated cost for this project is$2,350,000.
MAGNOLIA-LIBERTY TO EAST LUCAS
Magnolia from Liberty to North of IH-10 consists of a two-lane section with concrete curbs and gutter.
The remaining section consists of a four-lane concrete street with curbs and gutter. This project
involves the complete reconstruction of Magnolia.The estimated cost forthis project is$12,600,000.
MAIN STREET-CALDER TO BLANCHETTE
The existing pavement on Main Street, from Calder to Blanchette, is beginning to experience
numerous failures as a result of the utilities running underneath it. After continually repairing the
roadway, it is now at the point that the entire roadway needs to be replaced.The estimated cost to
reconstruct this four-lane concrete roadway is$4,500,000.
MOORE STREET RELIEF
The lack of roadside ditch facilities in residential areas, inadequate capacity within existing storm
sewer systems,and large paved areas within the Lamar University campus,all contribute to flooding
problems.The Moore Street Drainage Area is located within the southeast quadrant of the City and
is generally defined as the watershed contributing to the Moore Street Ditch. Proposed
improvements include the construction of storm sewers,the removal of a concrete restriction at the
old Lower Neches Valley Authority Crossing, realignment of the channel, the installation of a box
culvert at Highland Avenue and the replacement or modification of existing inlets. The estimated
cost of this project is$5,600,000.
NORTH-M L KING TO TWENTY-THIRD
The section of North Street from ML King to Twenty-Third Street is a two-lane roadway with an
asphalt surface and concrete curbs and gutter.This project consists of reconstructing the roadway
as a concrete street with left turn lanes at the major intersections. Estimated cost of this project is
$7,200,000.
NORTH MAIN-CALDER TO RR Tracks
The pavement on North Main from Calder to the Santa Fe railroad track has experienced numerous
failures due to the large trees adjacent to the roadway.Although the street has been overlayed on
several occasions,the differences in pavement elevation at the curb necessitates the replacement
of the existing pavement. Estimated cost of the project is$1,800,000.
I
f
OLD DOWLEN
Due to significant development in the Parkdale Mall area, a very high demand has been placed on
Old Dowlen Road between Dowlen and SH 105. Federal funding has been secured to reconstruct
Old Dowlen to a four-lane concrete curb and gutter section in FY 2007.Additionally,the relocation
of the northern section to tie in with the intersection of Caswell and SH 105 is proposed to
accommodate the various intersection movements that are occurring at the existing Old Dowlen and
SH 105 intersection.This relocation will allowthe installation of a signal at the proposed intersection
that is not currently feasible due to the close proximity of Old Dowlen to Eastex Freeway.
The project was divided into two phases in FY 2004 as the result of receiving Congestion Mitigation
and Air Quality Funding(CMAQ)for improvements from Dowlen Road to approximately 1,500 feet
north. The project estimates for Phases I and II are $2,000,000 and $3,000,000, respectively.
Federal funding for both phases has been secured on a 80%(federal)/20%(local) basis.
PHELAN BOULEVARD-MAJOR TO KEITH
Phelan Boulevard west of Major Drive is a heavily traveled two lane roadway that provides access
to West Brook High School and the west end of Beaumont.The current roadway cannot adequately
handle the traffic demand and requires widening to a four-lane curb and gutter section from Major
Drive to west of West Brook High School.The section from west of West Brook High School to Keith
Road will be two-lane,with continuous left turn lane, concrete curb and gutter roadway. Estimated
cost for this project is$3,500,000.
PHELAN BOULEVARD-1-10 TO DOWLEN
The section of Phelan Boulevard from IH-10 to Dowlen Road was constructed in the early to mid
1970's and is reaching the end of its design life. This is a heavily traveled roadway that serves as
a major connector from the downtown area to the west end of the City. The estimated cost for this
project is$15,600,000.
PINE STREET
Pine Street from Crockett Street to IH-10 is a heavily traveled roadway that provides access to IH-
10 from the downtown area. The current pavement is experiencing failures and has had several
overlays. It is now necessary to replace the entire roadway. The total estimated cost of the project
is$3,600,000.
ROLFE CHRISTOPHER DRIVE
The widening of this two-lane asphalt roadway from Virginia Street to Cardinal Drive(US 69 South)
into a four-lane concrete roadway will greatly improve the flow of traffic around Lamar University.
Also included in this project are improvements to Virginia Street from Rolfe Christopherto M.L.King
Parkway. Estimated cost of this project is$4,000,000.
SEVENTH STREET
The existing pavement on Seventh Street,from Laurel to IH-10,is experiencing numerous failures
as a result of utilities running underneath it. After continually repairing the roadway, it is now
necessary to replace the entire roadway. Estimated cost of this project is$4,000,000.
i
SOUTH PARK RELIEF
The remaining phases of the South Park Relief project include construction of laterals on Campus
Avenue, Zavalla Drive, East Woodrow, Kenneth Avenue, Saxe Street and Florida Avenue. Also
included are improvements to substandard inlets, manholes and connecting pipe. Estimated cost
for this project is $7,500,000.
STREET REHABILITATION PROGRAM
In 2003, the Street User Fee that was used to fund the Street Rehabilitation Program was
eliminated. This was the only funding source used to do repairs on residential and arterial streets.
Continuation of a Street Rehabilitation Program will require funding from the Capital Improvement
Program. Streets to be included will be identified on an annual basis. The estimated annual cost
of the program is$1,000,000. Future Street Rehabilitation(FY 2007-2011)will require$5,000,000.
WASHINGTON -IH-10 TO M L KING
Washington Boulevard from M.L.King,Jr.Parkway to IH-10 is a heavily traveled four-lane roadway
that provides access from the east to west end of Beaumont. The current roadway has a
combination of continuous left-turn lanes,left-tum lanes at major intersections and sections with no
left-tum lanes.Additionally,the existing pavement is beginning to experience numerous failures and
will require rehabilitation.This project includes the rehabilitation of the existing roadway and adding
either continuous or intersection left-turn lanes along the 3.2 mile length of the project. The
estimated cost for this project is$14,900,000.
WASHINGTON-LANGHAM TO MAJOR
It is desirable to continue Washington Boulevard from Langham Road to Major Drive as a four-lane
arterial.The section from IH-10 to Langham was a participation project with TxDOT and has been
completed.The completion of the last section should be scheduled to coincide with improvements
on Major Drive. Estimated cost for this project is $3,900,000. Federal funding of$3,080,000 has
been received for this project. Air quality issues will not be determined until November 2007 and
could affect the project time-line.
WENDELIN/KELLY
The section of Wendelin from College to Kelly and Kelly from Wendelin to Langham consists of two-
lane asphalt streets with open ditches.Although both of these streets have been rehabilitated,they
continue to experience base failures due to soil conditions.The proposed work on these streets will
consist of the complete reconstruction of the roadways and the installation of concrete pavement.
i The open ditches would remain. The estimated cost of the project is$600,000.
1
GENERALIMPROVEMENTS
PROJECT DESCRIPTIONS I
GENERAL IMPROVEMENT PROJECTS
FY 2007 - 2011
ALICE KEITH PARK PLAYGROUND RENOVATIONS
The existing playground at Alice Keith is outdated and requires replacement. The
for this project is$100,000. estimated cost
ATHLETIC COMPLEX RESTROOM FACILITY
The three wood-framed restroom structures at Complexes I, ll, and III are in need of replacement.
The wood materials used in their construction are not conducive to the constant cleaning with high
moisture levels. Exterior and interior wall framing and bottom plates are in need of replacement to
keep the buildings structurally sound. After demolition of the old buildings, a new single story
masonry structure is proposed at each site. The new units would include electrical service,
accessible restroom facilities, storage area and small covered areas at ground level for score-
keepers. Estimated cost for this project is$380,000.
CENTRAL PARK COMMUNITY CENTER
Due to foundation settlement and deterioration of the structure,the center is in need of replacement.
Settlement has affected the entire structure to a condition that is no longer repairable.Since the park
receives considerable usage,it is recommended that the 1930's structure be demolished and a new
building of similar size, excluding the office area, and configuration be constructed in its place.
Estimated cost for this project is$500,000.
CITY HALL ROOFTOP AIR HANDLER
This project would provide for the replacement of the rooftop air handler at City Hall. The existing
air handler unit at City Hall is more than 20 years old and in very poor condition. The housing,door
gaskets, and drain pans have deteriorated beyond repair. Approximately 30 feet of duct is coated
with asbestos containing materials.Water is leaking from rusted drain pans,causing built-up roofing
materials to deteriorate. The project will also require the entire duct system in City Hall to be
cleaned. Estimated cost for this project is$440,000.
CIVIC CENTER D WOUTION
This project includes the demolition of the Civic Center for potential use of the site for riverfront
development. The estimated cost to demolish the Civic Center is$350,000.
COMMUNITY FACILITIES
The Community Facility buildings at Alice Keith Park and Rogers Park are in need of replacement.
A community facility will also be considered at a north end location. The estimated cost of each
building is$500,000.
DEMOLITION OF PUBLIC FACILITIES AND COMMERCIAL STRUCTURES
This project includes the demolition of public facilities and commercial facilities that will be identified
during the Capital Program Funding years.
DETENTION FACILITIES HIKE & BIKE TRAIL
A 10-foot wide hike and bike trail will be constructed on Drainage District No. 6 property, located
between Dishman Road and Phelan Boulevard. The recreational trail will traverse along the Gulf
Terrace drainage detention facility on Phelan Boulevard, extend along a drainage canal easement
and end at the drainage detention pond on Dishman Road. Total length of the proposed trail is
approximately 2.5 miles. Parking facilities will be provided at the Phelan Boulevard entrance to the
trail.The trail will accommodate recreational activities such aswalking,jogging,skating and cycling.
Estimated cost for this project is$720,000.
DOWNTOWN EVENT CENTER& LAKE PARK
A park including a man-made lake would be constructed on property bordered by MLK Parkway on the
west,Crockett Street on the south, Neches Street on the east and the abandoned railroad track on the Q
north. The proposed park would encompass approximately 16 acres.The proposed lake would be 10- u
12 acres in size and between four and ten feet deep.A concrete walking trail would be constructed on
the perimeter of the lake.Other amenities would include lighting,parking,bathrooms and picnic areas.
In addition to the park, an event center would be constructed to replace the Harvest Club.The Event
Center would include an open area to accommodate large groups and meeting rooms.The estimated
cost of the new Event Center and park is$6,500,000.
FIRE STATION DRIVEWAY REPLACEMENTS
The concrete driveways at Fire Stations Nos. 2, 8, and 9 are in poor condition and in need of repair.
This project includes demolition of the existing driveways,installation of new stabilized sub grade,and
the construction of driveways that support the extreme weight of fire apparatus. Estimated cost for this
project is$150,000.
FIRE FLEET MAINTENANCE SHOP
This project would provide for the construction of a 60'x 100'mechanic shop facility at the Lafin Road
Fleet Service Center.The former Municipal Transit Building on Milam Street is currently being used by
the Fleet Maintenance Division for servicing equipment owned/operated by the Fire Department.
Moving all of the City's Fleet Maintenance operations to a single site would reduce operating costs,
allow for better utilization of available manpower, and improve management's control over the quality
and quantity of work performance. Estimated cost for this project is$460,000.
FIRE STATION RELOCATION/ADMINISTRATION
This project provides for the merging and relocation of Fire Stations No. 1 and 11 from their present
location to an accessible, more strategic location that would allow the City to maximize its firefighting
resources.This would provide additional fire fighting protection forthe Charlton-Pollard community and
continue coverage in the Central Business District. Also proposed is the relocation of the Fire
Department's administrative staff from its current location on the second floor of the Fire Museum of
Texas to the new facility. Estimated cost for this project is$4,590,000.
FLEET PARKING LOT
The Fleet Parking Lot is constructed of concrete and is experiencing numerous failures. This project
would involve the reconstruction of the majority of the parking lot and would also include those areas
that are used for parking and not currently not paved. The estimated cost is$1,500,000.
JULIE ROGERS THEATRE
The Julie Rogers Theatre was completed in 1983,after the City Auditorium,originally built in 1927,was
reconstructed. This project originally included exterior improvements to the building, the
cleaning/sealing/repairing all brick and cast stone surfaces, roof replacement above the stage area,
repairs to copper down spouts and flashing, and replacing the concrete courtyard around the fountain.
This project also proposes the replacement or restoration of the seating in the auditorium.Replacement
of an emergency generator and environmental controls is also scheduled.Extensive damage was done
to the theater as a result of Hurricane Rita.The new project involves the complete rehabilitation of the
interior of the building and replacement of the entire roof system. Estimated cost for this project is
$2,900,000.
LAMBS BUILDING REPLACEMENT
The Lambs Building is currently being used by the City to store surplus property prior to disposal by
auction. The condition of the existing building is poor and no longer of adequate size for the City's
needs.The estimated cost to replace the building is$750,000.
MAIN LIBRARY IMPROVEMENTS
This project includes the replacement of the carpet and furniture located in the public areas.The carpet
and furniture has become worn after may years of use and is in need of replacement. The estimated
cost for new carpet and furniture is$200,000.
MARTIN LUTHER KING, JR. PARK
This project will provide for the construction of a new park located on the east side of M. L. King, Jr.
Boulevard,between College and Wall Streets.The 3.3 acre site will be dedicated to the memory of Dr.
King,a nonviolence advocate,civil rights leader and clergyman.The project includes the development
of a passive park with parking lot, paved areas for reflection and meditation, landscaping and lighting.
Estimated cost for this project is$600,000.
911 OPERATIONS CENTER
Renovations to the second floor of the Municipal Court Building will allow for the consolidation of public
safety dispatch services,including Police,Fire and EMS.Dispatch services are currently provided from
two separate locations. Consolidation provides for the better utilization of communication resources.
Renovations include radio dispatch areas, employee break and lounge area, meeting and training
rooms,and an area to be used in emergency situations as a Citywide command center.Federal funding
in the amount of$68,000 has been received for this project.The total estimated cost for this project is
$2,310,000.
POLICE DEPARTMENT BUILDING
The Police Department has outgrown their existing thirty-one year old building. Currently, three units
of the Police Department are located in outlying facilities within the City. Additionally, the Police
Department requires additional space for their Property Office. During periods of heavy rains the
building is susceptible to flooding from the basement entrance to the building.The construction of a new
building would allow the entire department to be at one location.The estimated cost of a new building
is$11,000,000.
PUBLIC HEALTH DEPARTMENT BUILDING
The Health Department has outgrown their existing facilities on Washington Boulevard. In addition to
the three buildings utilized by Health on Washington,they also have facilities on Laurel Street for EMS
and Health Sanitation and offices in City Hall for Code Enforcement(formally Neighborhood Services).
Two of the buildings on the Washington Boulevard site are expensive to maintain due to their age. The
proposed building will house all of their offices in one facility. The estimated cost for this project is
$2,500,000.
PUBLIC SAFETY COMMUNICATIONS HARDWARE AND SOFTWARE
Replacement of the A. L. Roark Public Safety Software, purchased in 1992 is necessary. This
antiquated system has not been supported by the vendor for over six years,has lost functionality,and
provides no growth or enhancements for public safety.The proposed project includes an update of the
mobile infrastructure and will provide updated software for the 911 Center, Records Management,
Investigations, Case Management, Field Reporting, State and Federal reporting, electronic searches,
and analytical reporting for Police,Fire,and EMS. Several manual tasks will become automated with
the implementation of this upgrade.Estimated cost forthis project is$3,000,000.The City has received
a Federal Grant in the amount of$892,000.
RIVERFRONT PARK IMPROVEMENTS
The northern portion of the park is experiencing extensive erosion due to the currents in the river.
Although not as severe,erosion is also occurring along several other sections of the park.This project
would provide for bank stabilization along the entire length of the park.Also included in the project, is
the replacement of the lighting system and renovations to the existing restrooms.The estimated cost
for bank stabilization is$1,750,000 and$250,000 forthe new lighting system and restroom renovations.
ROGERS PARK-WALKING TRAIL&PARKING LOT
This project would provide for a walking trail and reconstruction of the parking lot at Rogers Park.Other
amenities would include lighting,drinking fountains,landscaping and drainage. Estimated cost for this
project is$200,000.
SENIOR CENTER
A new facility is proposed to replace the Best Years Center.The proposed facility would accommodate
the activities of our senior citizen's program. Construction of a 15,000 square foot facility is proposed
to replace the existing structure which was originally built in the 1950's but is no longer cost effective
to repair. Estimated cost for this project is$2,300,000.
TYRRELL HISTORICAL LIBRARY ADDITION
The Tyrrell Historical Library needs additional space for expansion of the archival area.The proposed
addition would be located on the north side of the existing building.The estimated cost for the addition
is$1,933,000.
TYRRELL PARK COMMUNITY BUILDING
This project will include the construction of a new community facility building at Tyrrell Park. The
existing Recreation Building was constructed in the 1930's by the Civilian Conservation Corp. The
existing building is not air conditioned and will require extensive renovations to bring the building into
a useable condition. The estimated cost of the new building is$600,000.
VISITOR CENTER/CVB
This project will provide for the construction of a new office building and visitor's facility along the
entrance corridorofthe Central Business District.Approximately 4,500 square feet of building area and
adequate visitor parking is planned. Estimated cost for this project is $1,530,000. Construction costs
for this project are eligible for reimbursement from Hotel Occupancy Tax receipts.
D
o� �
T
yD
m
WATER & SEWER PROJECTS
FY 2007 - 2011
WATER AND SEWER PROJECTS
2 MG ELEVATED STORAGE TANK
The City of Beaumont does not meet its elevated storage capacity needs and was cited by TCEQ.
The City should complete the construction of the 2 MG Elevated Storage Tank before the end of FY-
2007. This tank will increase the water pressure in the area and will provide capacity needs for
future development. Estimated cost of this project is$2,800,000.
36" TRANSMISSION LINE
This project will extend a 36"water transmission line from the Water Treatment Plant on Pine Street
to Dishman Road to supply the proposed 2 million gallon elevated storage tank on Dishman Road
with water. In addition, it will increase the water pressure in areas along its path. Estimated cost
of this project is$6,400,000.
54"CENTRAL TRUNK SANITARY SEWER INTERCEPTER REHAB -PHASE II
This project was initiated due to the failing joints and large number of cavities in the existing
concrete pipe causing infiltration of storm water,increasing the number of overflows and impacting
the Waste Water Treatment Plant efficiency. Phase I of this project was completed in February
2006 and construction of Phase II will start in 2007. Estimated cost of this project is$5,500,000.
54"WEST TRUNK OUTFALL-PHASE I
This sanitary sewer interceptor is approximately 5,000 linear feet and runs from Hillebrandt Bayou
to Lafin Road. The existing pipe has deteriorated and infiltration through separated pipe joints is
affecting the operation at the Waste Water Treatment Plant. This project will slipline the existing
54" concrete pipe with a 48" high density polyethylene pipe. In addition, this project will replace
2,000 linear feet of 12"concrete pipe on Fannett Road. Estimated cost of this project is$2,330,000.
54"WEST TRUNK OUTFALL-PHASE 11
This sanitary sewer interceptor is approximately 4,000 linear feet and runs from Hillebrandt Bayou
to Washington Blvd. The existing pipe has deteriorated and infiltration through separated pipe joints
is affecting the operation at the Waste Water Treatment Plant. This project will slipline the existing
54" concrete pipe with a 48" high density polyethylene pipe. Estimated cost of this project is
$1,620,000.
i 60"TRUNK LINE REHABILITATION
The 60-Inch Trunk Line that extends 9,000 linear feet from the Waste Water Treatment Plant to
Washington Blvd. Is over fifty(50) years old and has exceeded its life expectancy. The trunk line
passes under Interstate 10 and several waterways. In the last year several cavities have occurred
at several locations along the span of the line. The rehabilitation of this line will reduce infiltration
of storm water into the sewer system, and decrease the number of sanitary sewer overflows.
Estimated cost of this project is$3,390,000.
AMMONIA EDITION to LOEB PLANT
This project will provide improvements to the facilities and equipment at the LOEB Well in order
to provide ammonia addition to the treatment process. Estimated cost for this project is$250,000.
AUTOMATIC FLUSHING PROJECT
The City of Beaumont is required by TCEQ and the EPA to maintain a chlorine residual in the water
distribution system. The dead end lines in the system must be flushed on a weekly basis to be able
to maintain the required residual and protect public health and safety. The increased cost of labor
and equipment utilized in manually flushing the dead-end water lines will be eliminated by the
installation of the automatic flushing devices. In addition, such devices will help the City measure
and record the volume of water used during the flushing operations. Estimated cost of this project
is$100,000.
DEGRITTER at the WASTE WATER TREATMENT PLANT
This project will provide a degritting system at the head of the Waste Water Treatment Plant to
remove solids and protect the integrity of the pumps and equipment inside the Plant. Estimated cost
for this project is$1,210,000.
DREDGE PONDS 1 &2 0-WASTE WATER TREATMENT PLANT
The 10'deep existing ponds are 2/3 full of sludge. The WWTP should have a holding capacity of
60 million gallons in order to minimize overflows in the system and meet State regulations. Once
the third aeration lagoon is placed into service,the existing ponds will be dried one at a time and the
sludge removed and disposed of at the City of Beaumont landfill. Estimated cost of this project is
$1,200,000.
FILTER REHABILITATION at the WASTE WATER TREATMENT PLANT
The existing filters at the Waste Water Treatment Plant were built in the 1950's and have
deteriorated. The condition of the filters is requiring constant maintenance. This project will replace
the filter arms,thickner lines and the bearings. Estimated cost of this project is$1,900,000.
FLORIDA LIFT STATION
This project will rehabilitate the Florida Street lift station which requires constant maintenance.
Estimated cost of this project is$510,000..
GENERATOR(2)INSTALLATION at the WASTE WATER TREATMENT PLANT
The Waste Water Treatment Plant does not have backup power. Power outages lasting longer than
3-days can cause sanitary sewer overflows in the system. The generators will provide the power
required to process sanitary sewer in case of power outages and hence protect public safety and
health. Estimated cost of this project is$2,500,000.
GRIT PUMPS REPLACEMENT at the WASTE WATER TREATMENT PLANT
This project was designed in-house and will replace twelve (12) pumps at the Waste Water
Treatment Plant to increase the efficiency of the Plant and minimize maintenance efforts. The
existing pumps have exceeded their life expectancy and had required constant maintenance.
Estimated cost of this project is$150,000.
INITIAL DISTRIBUTION SYSTEM EVALUATION IDSE
IDSE is the tool utilized to take system sampling from Stage 1 Running Annual Averages(RAAs)
to Stage 2 Locational Running Annual Averages(LRAAs). LRAAs are Stage 2 required water quality
results based on key sampling locations identified in the IDSE for Total Trihalomethane(TTHM)and
Halcacetic Acids (HAA). When the EPA promulgates Stage 2,water systems will be expected to
select an IDSE and notify the Texas Commission on Environmental Quality(TCEQ)with an updated
monitoring plan;and complete the IDSE and submit a detailed report of the IDSE determination to
TCEQ. This was mandated in June 2005. Estimated cost of this project is$100,000.
LEAK DETECTION PROJECT
The City of Beaumont treats and distributes on an average 24 million gallons a day(MGD)of water.
Thirty percent of the processed water is not metered or accounted for. This project will use state
of the art equipment to test every foot of water lines, valves, water meters, and fire hydrants for
leaks. During the leak detection process the contractor will GPS the existing valves, hydrants and
water meters.
The cost of the project will be replenished through the money saved on chemicals that is used in
treating the lost water. In addition,this project will help the Water Dept.meet its water conservation
goals set by the TCEQ. Estimated cost of this project is$350,000.
LIFT STATION REPAIRS
The City of Beaumont owns,operates and maintains 97 sanitary sewer lift stations throughout the
City. This project will rehabilitate deteriorated stations that require constant maintenance.
Estimated cost of this project is$900,000 or$300,000 per year.
MASTER PLAN for WATER and SEWER SYSTEM
The Master Plan will assist Water Utilities in future planning of new facilities and rehabilitating
existing ones.
The Water Distribution System Master Plan will update the Water Computer Aided Drafting(CAD)
Water System Model; review water system pressure concerns; conduct pressure testing; conduct
site visits;review system operation of pumping and storage facilities. The plan will develop demand
data for the existing water model input;distribute existing water demands throughout the City to the
water system model; conduct model calibration;develop water demand projections; review water
rights and the well supply reliability;evaluate water supply needs through 2025;repair water system
models; develop a draft capital improvement for the Water Distribution System; and prepare a
Water System Master Plan.
The Sewer Collection System Master Plan will analyze the sewer system basin and sub basin
delineation; identify critical lines needed in model review asset data and lift stations;develop H2O
MAP Waste Water System Model;conduct flowmonitoring;calibrate the existing hydraulic computer
model;evaluate the existing sewer system;develop sewer flows throughout the collection system;
prepare sewer system models and develop a capital improvement plan for the sewer system.
Total estimated cost of this project is$400,000.
NORTHWEST ELEVATED STORAGE TANK REHABILITATION
The existing elevated storage tank has been cited by TCEQ and is in need of structural repairs as
well as inside, outside blasting and painting. Estimated cost of this project is$620,000.
SANITARY SEWER REHABILITATION of SMALL MAINS-"PIPE BURSTING"
The City of Beaumont owns, operated and maintains 750 miles of sanitary sewer lines that range
in size from 4 to 72 inches. Some of these lines were built in the early 1950's and have exceeded
their life expectancy. This project will rehabilitate 60,000 linear feet per year for a four year period.
Estimated cost is$2,000,000 a year for a total of$10,000,000.
SANITARY SEWER LINE EXTENSION ON IH-10 (between Walden Road to Brooks Road)
This project will extend sewer lines from Walden Road to Brooks Road to provide service for
development and loop the water system. Estimated cost of this project is$890,000.
WASTE WATER TREATMENT PLANT GROUND IMPROVEMENTS
The Waste Water Treatment Plant has undergone major improvements in the last four years. This
proposed project will rehabilitate the existing roads, buildings, and the grounds. Estimated cost of
this project is$1,000,000.
WATER LINE EXTENSION ON IH-10 (WALDEN to BROOKS)
This project will extend water lines from Walden Road to Brooks Road to provide service for
development and loop the water system. Estimated cost of this project is$890,000.
WATER LINE EXTENSIONS 1 REPLACEMENTS
The City of Beaumont owns and operates 750 miles of water lines that distribute water for
approximately 124,000 customers. Sixty percent of the water lines have shown signs of
deterioration. This pro-active project will replace deteriorated water lines priorto failure to ensure
uninterrupted service and adequate fire protection to the customers. The estimated cost of this
project is$1,000,000 per year for a total project cost of$5,000,000.
WATER METER RELOCATION
Three years ago the City of Beaumont Water Utilities Department initiated a project to relocate
water meters from back alleys to the street right-of-ways. This project will relocate the remaining
140 meters. The project was initiated to optimize meter reading and better detect water leaks.
Estimated cost of this project is$810,000.
WATER TREATMENT PLANT IMPROVEMENTS -PHASE I
This project will provide the required engineering design and construction of the following
improvements at the Water Treatment Plant: Renovate pulsators; bulk chlorine; chemical building
improvements; filter backwash Clarifier System; generators; and miscellaneous mechanical and
electrical improvements. Estimated cost of this project is$7,000,000.
• Pulsators: The existing pulsators have deteriorated as a result of adding coagulant to the
raw water. The renovations of the concrete walls and the replacement of related equipment
is essential for the uninterrupted operations of the Water Treatment Plant.
• Bulk Chlorine Feed System:The existing chlorine feed relies on 1-ton cylinders. A city the
size of Beaumont can use several chlorine cylinders requiring the operators to replace them
frequently. By switching to bulk chlorine we minimize the labor costs and pay less for
chlorine on a per pound basis.
• Chemical Building Improvements: The existing chemical building was built in 1960 and is
in need of rehabilitation. The improvements will include, modification to piping,
instrumentation and control and chemical feed pumps.
• Filter backwash:The purpose of this system is to recycle filter backwash waste to the head
of the plant. Fitter backwash would flow b gravity to the clarifiers equipped with a sludge
P Y 9 riY
scrapping mechanism.Once the sludge settles,the water would be pumped to the head of
the Plant.
WATER/SEWER FOR STREET PROJECTS
AVENUE A -Washington to US 69S
This project will rehabilitate approximately 3,610 linear feet of sanitary sewer lines and replace
8,955 linear feet of water lines with all related appurtenances. The existing lines have deteriorated
and require constant maintenance. Estimated cost of this project is $650,000.
CALDER -Main to Phelan
This project will rehabilitate approximately 12,300 linear feet of sanitary sewer lines and replace
24,000 linear feet of water lines with all related appurtenances. The existing lines have deteriorated
and require constant or regular maintenance. Estimated cost of this project is$2,080,000.
COLLEGE STREET-Goliad to IH-10 t
This project will rehabilitate approximately 4,400 linear feet of sanitary sewer lines and replace 8,700
linear feet of water lines with all related appurtenances. The existing lines have deteriorated and
require constant or regular maintenance. Estimated cost of this project is$840,000.
CONCORD ROAD PHASE IV-East Lucas to Hwy. 105
This project will rehabilitate approximately 10,000 linear feet of sanitary sewer lines and replace
9,500 linear feet of water lines with all related appurtenances. The existing lines have deteriorated
and require constant or regular maintenance. Estimated cost of this project is$1,140,000.
DELAWARE-Concord to Dowlen
This project will rehabilitate approximately 9,500 linear feet of sanitary sewer lines and replace
18,200 linear feet of water lines with all related appurtenances. The existing lines have deteriorated
and require constant or regular maintenance. Estimated cost of this project is$2,730,000. t
DOWLEN ROAD-College to Walden t
This project will rehabilitate approximately 650 linear feet of water lines with all related
appurtenances. The existing lines have deteriorated and require constant or regular maintenance.
In addition,this project will extend 12,000 linear feet of water and 12,000 linear feet of sewer lines
to serve the proposed developments. Estimated cost of this project is$1,560,000.
DOWLEN ROAD-Delaware to Gladys t
This project will rehabilitate approximately 3,900 linearfeet of sanitary sewer lines and replace 5,900
linear feet of water lines with all related appurtenances. The existing lines have deteriorated and
require constant or regular maintenance. Estimated cost of this project is$630,000.
DOWLEN ROAD-Hwy. 69 N to Delaware
This project will rehabilitate approximately 7,000 linear feet of sanitary sewer lines and replace
11,000 linear feet of water lines with all related appurtenances. The existing lines have deteriorated
and require constant or regular maintenance. Estimated cost of this project is$910,000.
• Generators: The existing generator cannot operate all the new 800hp pumps. In case of a
power failure,the Water Treatment Plant would be able to pump only 10-15 million gallons
a day to the distribution system. The new generators will increase the pumping capacity to
40 million gallons a day and provide uninterrupted service to the customers.
WATER TREATMENT PLANT IMPROVEMENTS -PHASE II
Sludge Dewatering Facilities, High Service Pumps, and Raw Water Pumps to increase the Plants
efficiency and capacity. The estimated cost of this project is $18,000,000. The design or
construction phase is estimated at$3,000,000. The remainder is a planned project and is estimated
at $15,000,000.
• Sludge:Currently the sludge from the pulsators is discharged into the sanitary sewer system
and goes to the Waste Water Treatment Plant. By adding sludge dewatering facilities,the
Plant would dewater its sludge reducing the load on the Waste Water Treatment Plant.
Typical sludge dewatering facilities include centrifuges,conveyors,and truck loading areas.
• High Service & Raw Water Pump Additions are required to increase the Plants capacity
from 40 to 50 MGD.
WIESS BLUFF PUMP STATION BANK STABILIZATION
Wiess Bluff Pump Station is located in Jasper County approximately 5 miles from Bunn's Bluff
Canal. The station is used to pump raw water from the Neches River to the Water Treatment Plant
during drought conditions and in emergency cases. The project will rehabilitate the river banks that
have deteriorated as a result of the last two storms. Natural Resources and Conservation Service
will pay seventy-five percent of the construction cost. The City's estimated share of the project cost
is$500,000. Total estimated project cost is$1,500,000.
WETLANDS EVALUATION-PHASE I
Since the wetlands were built in 1990, several changes have taken place forcing the elevations of
the water in cells to increase affecting the aquatic and vegetative life. This project will include
surveying the grounds,animal and plant populations and designing the necessary changes to bring
the wetlands to their original condition. Estimated project cost is$170,000.
WETLANDS EVALUATION-PHASE 11
This project is an extension of the Wetland Evaluation Phase I. This project will provide the
necessary engineering design recommended by Phase I to modify the Wetlands in order for them
to achieve the treatment they were originally built for. Estimated cost is$200,000.
WETLANDS REHABILITATION
Since 1990 when the Wetlands were built, the facilities have undergone major changes that are
preventing the Wetlands from meeting the designed criteria. This project will implement the
modifications recommended by the Wetlands Evaluation Project-Phase ll. Estimated cost of this
project is$3,000,000.
t
t
DOWNTOWN IMPROVEMENTS
NECHES(Laurel to College)-This project will rehabilitate approximately 2,100 linearfeet of sanitary
sewer lines and replace 1,000 linear feet of water lines with all related appurtenances. The existing
lines have deteriorated and require constant or regular maintenance. Estimated cost of this project
is$210,000.
WILLOW&PARK(North to College)-This project will rehabilitate approximately 1,800 linearfeet
of sanitary sewer lines and replace 5,600 linear feet of water lines with all related appurtenances.
The existing lines have deteriorated and require constant or regular maintenance. Estimated cost
of this project is$700,000.
PEARL (Calder to North) - This project will rehabilitate approximately 60 linear feet of sanitary
sewer lines and replace 930 linear feet of water lines with all related appurtenances. The existing
lines have deteriorated and require constant or regular maintenance. Estimated cost of this project
is$140,000.
E. LUCAS-US 69 N to Pine
This project will rehabilitate approximately 9,030 linear feet of sanitary sewer lines and replace
21,537 linear feet of water lines with all related appurtenances. The existing lines have deteriorated
and require constant maintenance. Estimated cost of this project is$1,920,000.
ELEVENTH STREET-Washington Blvd.to US 69 N
This projectwill rehabilitate approximately 3,300 linearfeet of sanitary sewer lines and replace 6,000
linear feet of water lines with all related appurtenances. The existing lines have deteriorated and
require constant or regular maintenance. Estimated cost of this project is$440,000.
GLADYS -IH-10 to Dowlen
This project will rehabilitate approximately 3,800 linear feet of sanitary sewer lines and replace
14,500 linear feet of water lines with all related appurtenances. The existing lines have deteriorated
and require constant or regular maintenance. Estimated cost of this project is$1,280,000.
LAUREL-Office Park to IH-10
This projectwill rehabilitate approximately 2,500 linearfeet of sanitary sewer lines and replace 3,800
linear feet of water lines with all related appurtenances. The existing lines have deteriorated and
require constant or regular maintenance. Estimated cost of this project is$490,000.
MADISON -Irving to Grove
This project will rehabilitate approximately 120 linear feet of sanitary sewer lines and replace 2,900
linear feet of water lines with all related appurtenances. The existing lines have deteriorated and
require constant or regular maintenance. Estimated cost of this project is$110,000.
MAGNOLIA-Liberty to E. Lucas
This project will rehabilitate approximately 8,700 linear feet of sanitary sewer lines and replace
25,100 linear feet of water lines with all related appurtenances. The existing lines have deteriorated
and require constant or regular maintenance. Estimated cost of this project is$1,770,000.
MAIN STREET-Calder to Blanchette
This projectwill rehabilitate approximately 8,200 linearfeet of sanitary sewer lines and replace 5,000
linear feet of water lines with all related appurtenances. The existing lines have deteriorated and
require constant or regular maintenance. Estimated cost of this project is$840,000.
NORTH MAIN STREET-Calder to Railroad Tracks
This project will rehabilitate approximately 550 linear feet of sanitary sewer lines and replace 2,000
linear feet of water lines with all related appurtenances. The existing lines have deteriorated and
require constant or regular maintenance. Estimated cost of this project is$170,000.
NORTH STREET-ML King to Twenty-Third
This project will rehabilitate approximately 4,100 linear feet of sanitary sewer lines and replace I
12,900 linear feet of water lines with all related appurtenances. The existing lines have deteriorated
and require constant or regular maintenance. Estimated cost of this project is $960,000.
OLD DOWLEN -Dowlen to Hwy. 105
This project will rehabilitate approximately 6,000 linear feet of sanitary sewer lines and replace
13,050 linear feet of water lines with all related appurtenances. The existing lines have deteriorated
and require constant or regular maintenance. Estimated cost of this project is$530,000.
PEARL-College to Calder
This project will rehabilitate approximately 1,800 linearfeet of sanitary sewer lines and replace 3,800
linear feet of water lines with all related appurtenances. The existing lines have deteriorated and
require constant or regular maintenance. Estimated cost of this project is$410,000.
PHELAN -Major to Keith Rd
This project will rehabilitate approximately 6,600 linearfeet of sanitary sewer lines and replace 7,300
linear feet of water lines with all related appurtenances. The existing lines have deteriorated and
require constant or regular maintenance. Estimated cost of this project is$720,000.
PHELAN 4H-10 to Dowlen Road
This project will rehabilitate approximately 2,500 linear feet of sanitary sewer lines and replace 5,200
linear feet of water lines with all related appurtenances. The existing lines have deteriorated and
require constant or regular maintenance. Estimated cost of this project is$590,000.
PINE STREET-Crockett to IH40
This project will rehabilitate approximately 7,000 linear feet of sanitary sewer lines and replace
11,000 linear feet of water lines with all related appurtenances. The existing lines have deteriorated
and require constant or regular maintenance. Estimated cost of this project is$440,000. t
ROLFE CHRISTOPHER-US 69 S to Virginia "
This project will rehabilitate approximately 2,900 linear feet of sanitary sewer lines and replace 2,400
linear feet of water lines with all related appurtenances. The existing lines have deteriorated and
require constant or regular maintenance. Estimated cost of this project is$330,000.
SEVENTH STREET-IH40 to Laurel
This project will rehabilitate approximately 5,300 linear feet of sanitary sewer lines and replace 3,500
linear feet of water lines with all related appurtenances. The existing lines have deteriorated and
require constant or regular maintenance. Estimated cost of this project is$510,000.
TYRRELL PARK ROAD RESURFACING
The Water Utilities Department replaced sanitary sewer and water lines on Tyrrell Paris Road during
the last two years. In the process of installing the new lines,Tyrrell Park Road was damaged. This
project will restore the integrity of the road. Estimated cost of this project is $1,560,000.
WASHINGTON -MLK to IH-10
This project will rehabilitate approximately 7,800 linear feet of sanitary sewer lines and replace
27,000 linear feet of water lines with all related appurtenances. The existing lines have deteriorated
and require constant or regular maintenance. Estimated cost of this project is$2,000,000.
WASHINGTON BLVD-Langham to Maior
This project will rehabilitate approximately 7,600 linear feet of sanitary sewer lines and replace 8,200
1 linear feet of water lines with all related appurtenances. The existing lines have deteriorated and
i require constant or regular maintenance. Estimated cost of this project is$1,730,000.
1
a
i
i
� f
n
O
3
O
Q�
�n
n
Completed Projects (FY 2002-2006)
Since 2002, approximately$50.1 M in projects, both general improvement and public works,
have been completed or will be completed prior to fiscal year end 2006. The costs for all
public works projects topped $43.1 M. The general improvement projects completed during
this five-year period totaled $7M. An average of$10M in projects was completed annually
during this period. A summary of the projects completed from 2002-2006 follows:
Public Works Projects
2003 Walden Road- Major Dr. To Fannett 6,557,000
Concord Road Phase 1 8,370,000
Concord Road Phase II 8,325,000
Concord Road Phase III 6,070,000
2005 Major Drive 4,000,000
Downtown Improvements-Orleans-Wall to Crockett 910,000
Phelan Blvd Drainage Participation Project 200,000
Twenty-Third Street-College to Washington 1,930,000
Delaware Extension 3,660,000
2006 Virginia Street- Mercantile to Avenue A 2,700,000
General Improvement Projects
2002 Airport Runway Extension 268,000
Miller Library Expansion 475,000
T. R. Johns, Sr. Library 1,950,000
Playground Renovations 410,000
Perlstein Park 266,000
2003 Chariton Pollard Park 950,000
McLean Park 120,000
Roberts Park 210,000
Athletic Complex-Tennis Courts 260,000
2004 Art Museum Roof Replacement 390,000
Fletcher Mini Park Improvements 60,000
Julie Rogers Theatre Fire Alarm System 75,000
2005 Sprott, Rogers and Central Parks Spray Devices 181,000
Pedstein Park Walking Trail 110,000
Wuthering Heights Walking Trail 95,000
Central Park Tennis Courts 85,000
Cottonwood&Magnolia Park Improvements 350,000
2006 Central Park Tennis Courts 85,000
Tyrrell Park Clubhouse and Parking Lot 700,000
Completed Projects (FY 2002-2006)
Since 2002, approximately $60.9M in Water Utilities projects have been completed or will be
completed prior to fiscal year end 2006.
Water and Sewer Projects
2002 Upgrade Electrical Substation at WTP 95,000
Prison Tank Rehabilitation 320,000
Dowlen Road Sanitary Sewer Interceptor 2,790,000
Replace 2-10 MGD Pumps and Motors at WWTP 175,000
Replacement of 20 MGD pump at WWTP 150,000
Small Sanitary Sewer Mains Rehabilitation Contract III 1,900,000
Prison Force Main 1,392,000
Water Line Replacement Contract 1 126,000
Water Line Replacement Contract II 226,000
2003 Replace Electric System Phase I at WWTP 492,000
Digesters Conversion at WWTP 492,000
Water Line Replacement Contract III 640,000
4-Inch Raw Water Pipeline at Lawsons 3,894,000
Lawson's Pump Station Rehabilitation 3,802,000
Repair and Paint Loeb Steel Tank 553,000
Repair and Repaint the West Tank 281,000
Eleventh Street Sanitary Sewer Interceptor 2,928,000
Small Sanitary Sewer Mains Rehabilitation Contract IV 571,000
Small Sanitary Sewer Mains Rehabilitation Contract V 536,000
2004 Repair and Repaint South Tank 329,000
5 MG Ground Storage Tank 6,958,000
Chlorine Building at Loeb Well No 1 211,000
Small Sanitary Sewer Mains Rehabilitation Contract VII 1,042,000
Small Sanitary Sewer Mains Rehabilitation Contract IX 430,000
2005 Repair and Repaint the South West Tank 364,000
Barscreen Replacement at WWTP 834,000
2006 2.2 Meter Belt Press 292,000
14 MGD Water Plant Expansion 15,021,000
30"Force Main 1,096,000
54"Central Trunk Rehabilitation 1,426,000
20-Acre Treatment Pond 3,939,000
Bar Screen Area- Beltpress 1,052,000
Bunn's Bluff Canal Improvements 2,638,000
East Lucas Sewer Interceptor 2,616,000
Howell/Yount Outfall 864,000
Initial Distribution System Evaluation (I.D.S.E.) 100,000
Lab Addition-Waste Water Treatment Plant 343,000
Outstanding Debt
Relative to the assessed value of property within the Beaumont city limits, the outstanding general
obligation debt has ranged between a high of 2.41% at 10/01/99 and a low of 1.71% at 10/01/04.
The increasing assessed valuation of property is attributable to both the addition of new property on
the tax roll and increasing values of existing properties. Due to Hurricane Rita damage,2006 values
are estimated to equal 2005 values. In 2007,growth in value is expected to return to Pre-Rita levels.
The normal growth in assessed value mirrors the level of debt issued by the City for improvements
to infrastructure which support a growing economy. The debt level has fluctuated between $68.3M
at 10/01/97 and$94.6M at 10/01/05 while maintaining an average basis of 2.00%over the past 10-
year period. The projected debt level for 10/01/06 is$86AM with a debt ratio of 1.76%of assessed
value. The following table illustrates this discussion.
Outstanding Assessed Debt
Debt(1) Value Ratio
10/01/97 68,286,391 3,499,102,595 1.95%
10/01/98 76,723,691 3,661,785,240 2.10%
10/01/99 89,243,491 3,701,491,226 2.41%
10/01/00 81,093,791 3,779,873,302 2.15%
10/01/01 80,276,091 3,908,466,045 2.05%
10/01/02 76,362,576 3,935,778,866 1.94%
10/01/03 81,463,042 4,188,524,756 1.94%
10/01/04 78,050,071 4,568,576,349 1.71%
10/01/05 94,580,000 4,913,341,853 1.92%
10/01/06 (est) 86,410,000 4,913,341,853 1.76%
' Outstanding debt shown net of self-supporting HUD Section 108 loan.
As a percentage of total general government expenditures(General Fund and Debt Service),annual
tax supported debt service payments have ranged from 13.56%to 15.11% during the period FY03
through FY06. This ratio is projected at 14.18% for FY 2007.
Fiscal Year General Govt. Debt Service Percent
Expenditures Payments of Total
2003 83,886,889 12,762,066 14.69%
2004 84,197,207 12,724,564 15.11%
2005 87,693,163 12,246,141 13.97%
2006 (Est) 92,753,295 12,580,745 13.56%
2007 (Proj) 96,092,836 13,627,225 14.18%
I