HomeMy WebLinkAboutRES 05-206 RESOLUTION NO. 05-206
BE IT RESOLVED BY THE CITY COUNCIL
OF THE CITY OF BEAUMONT:
THAT the FY2006 Capital Program is hereby adopted. The Capital Program is
substantially in the form attached hereto as Exhibit"A." A public hearing was held at 1:30
PM on August 30, 2005 in the City Council Chambers, City Hall, Beaumont, Texas.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 20th day of
September, 2005.
��.UMp���t't
U pis jl
2 - Mayor Guy N. Goodson -
�j �
PUBLIC WORKS PROJECTS
FY 2006-2010
Anticipated
Estimated Cost Construction Date
Construction Phase
Ditch No. 117 $ 739,000 2006
Downtown Improvements
Pearl - College to Calder 2,100,000 2005
Griffing Ditch 350,000 2006
Hayes Gufiy 2,786,000 2006
Main - Calder to Blanchette 3,520,000 2005
Phelan - Major to Keith 2,600,000 2005
Rolfe Christopher - US 69 S.to Virginia 2,600,000 2006
Street Rehabilitation 1,000,000 2006
Virginia - Mercantile to Avenue A 2,700,000 In Progress
Total Construction Phase $ 18,395,000
Desian Phase
Brakes Bayou $ 1,148,000 2007
Calder- Main to Phelan 13,000,000 2007
Concord IV - E.Lucas to Hwy.105 9,540,000 [f] 2007
Dowlen - Col<ege to Walden 4,320,000 [3] 2008
Dowlen - Delaware to Gladys 5,950,000 2008
Dowlen - US 69 N to Delaware 8,380,000 [3] 2008
Downtown Improvements(FY 2007-2010)
Neches - Laurel to College 1,160,000 2008
Willow and Park - North to College 1,940,000 2007
Future Improvements 2,0001000 2007
Fannett Road 600,000 2006
Laurel - IH-10 to Office Park 3,650,000 [3] 2008
Madison - Irving to Grove 1,940,000 2007
North Street - ML King to Twenty-Third 6,000,000 2008
Old Dowlen - Dowlen to Hwy.105 3,100,000 [2] 2007
Seventh Street - lH-10 to Laurel 2,750,000 2007
Street Rehabilitation(FY 2007-2010) 4,000,000
Washington - IH-10 to ML King 12,400,000 2007
Washington - Langham to Major 3,240,000 [3] 2008
Total Design Phase $ 85,118,000
Planned Prolects 2008-2010
Cak]wood Outfall $ 4,380,000
College Street - IH-10 to Goliad 6,100,000
Delaware - Concord to Dowlen 9,600,000
Eleventh Street - Washington to US 69 12,400,000
Gladys Street - IH-10 to Dowlen 7,700 000
High School Ditch 10,290,000
Magnolia - Liberty to E Lucas 10,470,000
Moore Street Relief 4,650,000
North Main Street - Calder to RR Tracks 1,500,000
Pearl Street - Calder to North 450,000
Phelan - IH-10 to Dowlen 13,000,000
Pine Street - IH-10 to Crockett 3,000,000
South Park Relief 6,240,000
Total Planned Projects $ 89,780,000
Grand Total $ 193,293,000
[1] Includes Federal Kkjhway Administration funding of 80 percent up to$7,375,000. Construction start is September 2007.
[2] Includes TxDOT funding of 80 percent up to$2,400,000 for both phases. TxDOT construction start date for phase li is 2007.
[3] Air Quality issues will not be determined until a later date and could effect project timeline.
EXHIBIT "A"
WATER AND SEWER PROJECTS
FY 2006 -2010
Anticipated
Estimated Cost Construction Date
Construction Phase
Master Plan for Water&Sewer System $ 400,000 2006
Water Projects:
2 MG Elevated Storage Tank on Dishman 2,800,000 2005
14 MGD Water Plant Expansion 13,835,000 In Progress
36"Transmission Line 4,800,000 2005
Bunn's Bluff Canal Improvements 2,630,000 In Progress
Initial Distribution System Evaluation(IDSE) 100,000 2006
Northwest Tank Rehab 600,000 2006
Southwest Elevated Storage Tank 410,000 In Progress
Water Line Extension on IH-10 850,000 2005
(between Brooks and Walden)
Water Line Replacement-Lindbergh 600,000 2005
Sewer Projects:
2.2 Meter Belt Press 202,000 In Progress
20-Acre Treatment Pond 3,900,000 In Progress
30"Force Main 1,500,000 2005
54"Central Trunk Rehab 1,100,000 In Progress
Bar Screen Area-Beltpress 1,300,000 In Progress
Degritter-Waste Water Treatment Plant 1,200,000 2005
East Lucas Sewer Interceptor 2,434,000 In Progress
HowellfYount Outfall 862,000 In Progress
Lab Addition-Waste Water Treatment Plant 335,000 In Progress
Lift Station Repairs 300,000 In Progress
Replace Grit Pumps-Waste Water Treatment Plant 150,000 2005
Sanitary Sewer Line Extension on IH-10 850,000 2005
(between Brooks and Walden)
Sanitary Sewer Rehabilitation-Contract VIII 2,940,000 In Progress
Sanitary Sewer Rehabilitation-Contract X 2,300,000 In Progress
Waste Water Treatment Plant-Rock Trap Basin 600,000 2005
Wetlands Evaluation-Phase 1 200,000 2006
WaterlSewer for Street Projects:
Delaware Street Utility Relocation 1,242,000 In Progress
Main Street-Calder to Blanchette 719,000 2005
Pearl Street-College to Calder 314,000 2005
Phelan Blvd. -Major to Keith 555,000 2005
Rolfe Christopher-US 69 to Virginia 85,000 2006
Tyrrell Park Road Resurfacing 1,200,000 2005
Total Construction Phase $ 51,313,000
GENERAL IMPROVEMENT PROJECTS
FY 2006 -2010
Anticipated
Estimated Cost Construction Date
Construction Phase
Central Park Community Center $ 300,000 2006
Lefler Park Spray Device Replacement 50,000 2005
Martin Luther King, Jr. Park 350,000 In Progress
Public Safety Comm. &Emergency Operations Center 1,500,000 2006
Public Safety Communication Hardware/Software 3,000,000 [il 2006
Rogers Park Walking Trail 100,000 2006
Tyrrell Park Clubhouse&Parking Lot 700,000 In Progress
Visitor Center/CVB 1,200,000 In Progress
Total Construction Phase $ 7,200,000
Design Phase
Athletic Complex Restroom Facilities $ 200,000 2007
Detention Facilities Hike&Bike Trail 600,000 2007
Downtown Area Park 1,300,000 2007
Fire Station Dmeway Replacements 120,000 2007
Fire Station Relocation/Administration 3,000,000 2007
Julie Rogers Theatre 500,000 2007
Senior Center 1,500,000 2007
Total Design Phase $ 7,220,000
Planned Projects 2007-2010
Alice Keith and Chaison Park Playground Renovations $ 150,000
Alice Keith Park Restroom Facilities 125,000
City Hall Rooftop Air Handier 175,000
Fire Fleet Maintenance Shop 400,000
Total Planned Projects $ 850,000
Grand Total $ 15,270,000
[1] Staff is applying for Federal and State grants that may reduce the City's share.
Water Utilities Continued
Anticipated
Estimated Cost Construction Date
Design Phase
54"Central Thank Line- $ 4,500,000 2007
(East of Eleventh Street-Phase II)
54"West Trunk Outfall-Phase 1 2,215,000 2007
Dredge Pond 1 &2-Waste Water Treatment Plant 400,000 2007
Replacement of Clarifiers, Filters, Thickner Lines, 1,200,000 2007
Filter Arms&Bearings -WWTP
Water Plant Improvements-Phase 1 6,000,000 2007
Wetlands Evaluation-Phase 11 200,000 2007
Water/Sewer for Street Projects:
Calder-Main to Phelan 1,600,000 2007
Concord Road-Phase IV-East Lucas to Hwy. 105 873,000 2007
Dowlen Road-College to Walden 1,200,000 2008
Dowlen Road-Delaware to Gladys 487,000 2008
Dowlen Road-US 69 to Delaware 699,000 2008
Downtown Improvements:
Neches-Laurel to College 161,000 2008
Willow and Park-North to College 541,000 2007
Laurel-IH-10 to Office Park 377,000 2008
Madison-Irving to Grove 85,000 2007
North Street-ML King to Twenty-Third 741,000 2008
Seventh Street-I1-1-10 to Laurel 391,000 2007
Old Dowlen-Dowlen to Hwy. 105 533,000 2007
Washington-IH-10 to ML king 1,535,000 2007
Washington-Langham to Major 1,328,000 2008
Total Design Phase $ 25,066,000
Planned Projects 2008-2010
54"West Trunk Outfall-Phase II 1,300,000
Ammonia Edition to LOEB Plant 250,000
Lift Station Repairs 1,000,000
Sanitary Sewer Rehab-Small Mains 8,000,000
Waste Water Treatment Plant Ground Improvements 1,000,000
Water Plant Improvements-Phase II 12,000,000
Wetland Rehabilitation 3,000,000
Water/Sewer for Street Projects:
College Street-IH-10 to Goliad 645,000
Delaware-Concord to Dowlen 2,102,000
Eleventh Street-US 69 to Washington 337,000
Gladys Street-IH-10 to Dowlen 982,000
Magnolia-Liberty to E. Lucas 1,364,000
North Main Street-Calder to Railroad Tracks 130,000
Pearl Street-Calder to North 107,000
Phelan Blvd-IH-10 to Dowlen 450,000
Pine Street-IH-10 to Crockett 338,000
Total Planned Projects $ 33,005,000
Grand Total $ 109,384,000