HomeMy WebLinkAboutRES 05-174 RESOLUTION NO. 05-174
WHEREAS, construction of the street, storm sewer, water and sanitary sewer
improvements constructed in the Greenfield Addition Subdivision have been completed as
follows:
Street and Storm Sewer Improvements
Quail Court from the existing Greenfield Drive approximately 329 linear feet
south to and including the cul-de-sac and from the existing Greenfield Drive
approximately 310 linear feet north to and including the cul-de-sac.
Water and Sanitary Sewer Improvements
Lots 1-12, Block 1
Lots 1-15, Block 2
WHEREAS, the developers of said addition desire to have these improvements
accepted and maintained by the City; and,
WHEREAS, the director of the Public Works and Engineering Department
recommends that said improvements meet city standards and qualify for acceptance for
permanent maintenance, and the City Council is of the opinion that said improvements
should be accepted and maintained by the City of Beaumont;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the above-referenced street, storm sewer, water and sanitary sewer
improvements in the Greenfield Addition Subdivision,with the exception of streetlights,are
hereby accepted by the City of Beaumont and shall be continuously maintained by the City
contingent upon filing of the final plat, complete with filings of dedication of all rights-of-way
and easements required on the preliminary and final plats and installation of the
streetlights.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 16th day of
August, 2005.
- Mayor Guy N. Goodson -
MUN ��t
V <,
U3 X
1�