Loading...
HomeMy WebLinkAboutRES 05-006 RESOLUTION NO. 05-006 WHEREAS, on October 28, 2003, the City Council of the City of Beaumont, Texas, passed Resolution No. 03-235 awarding a contract in the amount of $4,224,066.30 to Brystar Contracting, Inc., for the Delaware Street Extension Project; and WHEREAS, Change Order No. 1 in the amount of$8,490 was required to install a junction box on the existing 24-inch water pipe to eliminate lowering the existing water line and to eliminate any disturbance in the water distribution system thereby increasing the contract amount to $4,232,556.30; and WHEREAS, Change Order No. 2 in the amount of $42,406 was required for the extra cost of sand bedding material needed to install a 36" transmission line thereby increasing the contract amount to $4,274,962.30; and WHEREAS, Change Order No. 3 is needed for installation of an additional 344 linear feet of 30-inch and 264 linear feet of 20-inch water transmission lines and appurtenances increasing the contract amount by $294,990.00 for a total amount of $4,569,952.30; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be and he is hereby authorized to execute Change Order No. 3 in the amount of$294,990.00 increasing the contract amount to $4,569,952.30. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 4th day of January, 2005. UMO �`,' � Mayor Evelyn M. Lord - X U ..... i �' s