Loading...
HomeMy WebLinkAboutRES 04-272 RESOLUTION NO. 04-272 WHEREAS, on October 28, 2003, the City Council of the City of Beaumont, Texas, awarded a contract to Brystar Contracting, Inc., in the amount of $4,224,066.30 for the Delaware Street Extension project; and, WHEREAS, Change Order No. 1 in the amount of$8,490 was required to install a junction box on the existing 24-inch water pipe to eliminate lowering the existing water line and to eliminate any disturbance in the water distribution system thereby increasing the contract amount to $4,232,556.30; and, WHEREAS, Change Order No. 2 is necessary for the extra costs of sand bedding material need to install a 36" transmission line; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be, and he is hereby authorized, to execute Change Order No. 2 to the Delaware Street Extension project for the extra cost of the sand bedding material needed to install the 36-inch transmission line in the amount of $42,406 increasing the contract amount to $4,274,962.30. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 16th day of November, 2004. E ® - or a Evelyn M. Lord - � Y Y L