HomeMy WebLinkAboutRES 04-250 RESOLUTION NO. 04-250
WHEREAS, construction of the street, storm sewer, water and sanitary sewer
improvements constructed in Barrington Heights Phase VI Subdivision have been
completed as follows:
Street and Storm Sewer Improvements
• Claybourn Drive from existing dead end on Heights Avenue approximately 955
linear feet west to the 3-OM-4P end of roadway markers.
• Prescott Drive from the proposed Claybourn Drive approximately 1,162 linear
feet south to the proposed Ellington Lane.
• Ellington Lane from existing dead end approximately 233 linear feet west
to the 3-OM-4P end of roadway markers.
Water and Sanitary Sewer Improvements
• Lots 22-33, Block 1; Lot 57, Block 5; Lots 8-10, Block 6; Lots 1-21, Block 7 and
Lots 1-13, Block 8.
;and,
WHEREAS, the developers of said addition desire to have these improvements
accepted and maintained by the City; and,
WHEREAS, the director of the Public Works and Engineering Department
recommends that said improvements meet city standards and qualify for acceptance for
permanent maintenance, and the City Council is of the opinion that said improvements
should be accepted and maintained by the City of Beaumont;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT street, storm sewer, water and sanitary sewer improvements in the Barrington
Heights Phase VI Subdivision, are hereby accepted by the City of Beaumont and shall be
continuously maintained by the City contingent upon filing of the final plat, complete with
filings of dedication of all rights-of-way and easements required on the preliminary and final
plats.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 26th day of
October, 2004.
Mayor Evelyn M. Lord -
Cn
pp �