HomeMy WebLinkAboutRES 04-241 RESOLUTION NO. 04-241
BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF BEAUMONT:
THAT the City Manager be and he is hereby authorized to execute an agreement with
Sigma Engineers, Inc.for the design and construction management of the new Convention
and Visitors Bureau (CVB) Office Building and Visitor Center. The agreement is
substantially in the form attached hereto as Exhibit "A" and made a part hereof for all
purposes.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 5th day of
October, 2004.
Ma r Evelyn M. Lord -
All
�' i
AGREEMENT FOR ARCHITECTURAL SERVICES
This Agreement made as of the day of ,2004 between the City of Beaumont,
Texas, hereinafter referred to as "Owner," and Sigma Engineers, Inc., hereinafter referred to as
"Architect" for the following Project: New Convention and Visitors Bureau Office Building/
Visitors Center City of Beaumont, Texas, hereinafter referred to as "Project." The Owner and
Architect agree as set forth below.
ARTICLE 1
ARCHITECT'S RESPONSIBILITIES
1.1 ARCHITECT'S SERVICES
1.1.1 The Architect's services consist ofthose services performed by the Architect,
Architect's employees and Architect's consultants as enumerated in Articles
2 and 3 of this Agreement and any other services included in Article 11.
1.1.2 The Architect's services shall be performed as expeditiously as is consistent
with a high degree of professional skill, care, and diligence practiced by
Architects of Jefferson County and the orderly progress of the Work. The
term"high degree of professional skill" shall require more than mere average
professional work, but shall not be construed herein to require perfection.
Upon request of the Owner, the Architect shall submit for the Owner's
approval a schedule for the performance ofthe Architect's services which may
be adjusted as the Project proceeds,and shall include allowances for periods
of time required for the Owner's review and for approval of submissions by
authorities having jurisdiction over the Project. Time limits established by this
schedule and approved by the Owner shall not, except for reasonable cause,
be exceeded by the Architect or Owner,and any adjustments to this schedule
shall be mutually acceptable to both parties.
1.1.3 The services covered by this Agreement are subject to the time limitations
contained in Subparagraph 10.4.1.
_l.
EXHIBIT "A"
ARTICLE 2
SCOPE OF ARCHITECT'S BASIC SERVICES
2.1 DEFINITION
2.1.1 The Architect's Basic Services consist of those described in Paragraphs 2.2
through 2.6 and any other services identified in Article 11 as part of Basic
Services, and include without limitation normal roofing, landscaping,
structural,civil,mechanical and electrical engineering services and assistance
in the selection and procurement, including preparation of specifications, of
furniture and furnishings, and any other engineering services necessary to
produce a set of Construction Documents, which will be sufficient and
adequate to fulfill the purposes of this project, as described by and required
in Paragraph 2.4.
2.2 SCHEMATIC DESIGN PHASE
2.2.1 The Architect, in consultation with the Owner, shall develop a written
program for the Project to ascertain Owner's needs and to establish the
requirements for the Project.
2.2.2 The Architect shall provide a preliminary evaluation of the Owner's program,
construction schedule and construction budget requirements,each in terms of
the other, subject to the limitations set forth in Subparagraph 5.2.1.
2.2.3 The Architect shall review with the Owner alternative approaches to design
and construction of the Project.
2.2.4 Based on the mutually agreed-upon program, schedule and construction
budget requirements,the Architect shall prepare,for approval by the Owner,
Schematic Design Documents consisting of drawings and other documents
illustrating the scale and relationship of Project components. The Schematic
Design shall contemplate compliance with applicable laws, statutes,
ordinances, codes and regulations.
2.2.5 The Architect shall submit to the Owner a preliminary detailed estimate of
Construction Cost based on current area, volume or other unit costs and
which indicates the cost of each category of work involved in constructing the
Project and establishes an elapsed time factor for the period of time from the
commencement to the completion of construction.
-2-
2.3 DESIGN DEVELOPMENT PHASE
2.3.1 Based on the approved Schematic Design Documents and any adjustments
authorized by the Owner in the program,schedule or construction budget,the
Architect shall prepare for approval by the Owner, Design Development
Documents consisting of drawings and other documents to fix and describe
the size and character of the Project as to architectural, structural, civil,
mechanical and electrical systems, materials and such other elements as may
be appropriate,which shall comply with applicable laws,statutes,ordinances,
codes and regulations. Notwithstanding Owner's approval ofthe documents,
Architect will provide Documents and specifications which will be sufficient
and adequate to fulfill the purposes of the Project.
2.3.2 The Architect shall advise the Owner of any adjustments to the preliminary
estimate of Construction Cost in a further Detailed Statement as described in
Paragraph 2.2.5.
2.4 CONSTRUCTION DOCUMENTS PHASE
2.4.1 Based on the approved Design Development Documents and any further
adjustments in the scope or quality of the Project or in the construction
budget authorized by the Owner,the Architect shall prepare,for approval by
the Owner, Construction Documents consisting of Drawings and
Specifications setting forth in detail requirements for the construction of the
Project,which shall comply with applicable laws, statutes, ordinances,codes
and regulations.
2.4.2 The Architect shall, with assistance of the Owner, prepare the necessary
bidding information, bidding forms, the Conditions of the contract, and the
form of Agreement between the Owner and contractor, and other required
bidding documents necessary to provide the Owner a completed bid
document.
2.4.3 The Architect shall advise the Owner of any adjustments to previous
preliminary estimates of Construction Cost indicated by changes in
requirements or general market conditions.
2.4.4 The Architect shall assist the Owner in connection with the Owner's
responsibility for filing documents required for the approval of other
governmental authorities having jurisdiction over the Project.
-3-
2.5 BIDDING
2.5.1 The Architect, following the Owner's Approval of the Construction
Documents and of the latest preliminary detailed estimate of Construction
Cost, shall assist the Owner in obtaining bids and assist in awarding and
preparing contracts for construction.
2.5.2 If the lowest bid for the construction of the Project exeeeds the total
construction cost of the Project as set forth in the approved Detailed
Statement of Probable Construction Costs of the Project submitted by the
Architect, then the Architect, at its sole cost and expense, will revise the
Construction Documents in a continuous fashion so that they are completed
in a timely manner as may be required by the Owner to reduce or modify the
quantity or quality of the work so that the total construction cost of the
Project will not exceed the total construction cost set forth in the approved
Detailed Statement of Probable Construction Costs.
2.6 CONSTRUCTION PHASE-ADMMSTRATION OF THE CONSTRUCTION
CONTRACT
2.6.1 The Architect's responsibility to provide Basic Services for the Construction
Phase under this Agreement commences with the award of the Contract for
Construction and terminates at the completion of the one(1)year warranty
period. Architect shall inspect the Project prior to the expiration of the
warranty period and report to Owner the condition of the Project, including
any deficiencies or warranty issues.
2.6.2 The Architect shall provide administration of the Contract for Construction
as set forth below and in the edition of AIA document A201, General
Conditions of the Contract for Construction, current as of the date of this
Agreement,unless otherwise provided in this Agreement or approved by the
City.
2.6.3 Construction Phase duties,responsibilities and limitations of authority of the
Architect shall not be restricted, modified or extended without written
agreement of the Owner and Architect.
2.6.4 The Architect shall be a representative of and shall advise and consult with the
Owner(1)during construction,and(2)at the Owner's direction from time to
time during the correction, or warranty period described in the Contract for
Construction. The Architect shall have authority to act on behalf of the
Owner only to the extent provided in this Agreement unless otherwise
modified by written instrument.
-4-
2.6.5 The Architect shall visit the construction site at least two times a week,while
construction is in progress,to become familiar with the progress and quality
of the Work completed and to determine if the Work is being performed in a
manner indicating that the Work,when completed,will be in accordance with
the Contract Documents. Architect shall provide Owner a written report
subsequent to each on-site visit. On the basis of on-site observations as an
architect, the Architect shall keep the Owner informed of the progress and
quality of the Work, and shall exercise care and diligence in discovering and
promptly reporting to the Owner any defects or deficiencies in the work of
Contractor or any subcontractors. The Architect represents that he will
follow high professional standards as described in 1.1.2 herein in performing
all Services under this Agreement. The Architect shall promptly correct any
defective designs or specifications furnished by the Architect at no cost to the
Owner. The Owner's approval, acceptance,use of or payment for all or any
part of the Architect's services hereunder or of the Project itself shall in no
way alter the Architect's obligations or the Owner's rights hereunder.
2.6.6 The Architect shall not have control over or charge of and shall not be
responsible for construction means, methods, techniques, sequences or
procedures, or for safety precautions and programs in connection with the
Work. The Architect shall not be responsible for the Contractor's schedules -
or failure to carry out the Work in accordance with the Contract Documents.
The Architect shall not have control over or charge ofacts or omissions of the
Contractor, Subcontractors, or their agents or employees, or of any other
persons performing portions of the Work.
2.6.7 The Architect shall at all times have access to the Work wherever it is in
preparation or progress, but shall have no responsibility for job site safety.
2.6.8 Except as may otherwise be provided in the Contract Documents or when
direct communications have been specially authorized, the Owner and
Contractor shall communicate through the Architect. Communications by and
with the Architect's consultants shall be through the Architect.
2.6.9 Based on the Architect's observations at the site of the work and evaluations
of the Contractor's Applications for Payment,the Architect shall review and
certify the amounts due the Contractor:
2.6.14 The Architect's certification for payment shall constitute a representation to
the Owner, based on the Architect's observations at the site as provided in
Subparagraph 2.6.5 and on the data comprising the Contractor's Application
for Payment,that the Work has progressed to the point indicated and that the
quality ofthe Work is in accordance with the Contract Documents. The fore-
5-
going representations are subject to minor deviations from the Contract
Documents correctable prior to completion and to specific qualifications
expressed by the Architect. The issuance of a Certificate for Payment shall
further constitute a representation that the Contractor is entitled to payment
in the amount certified. However, the issuance of a Certificate for Payment
shall not be a representation that the Architect has(1)reviewed construction
means,methods,techniques,sequences or procedures,or(2)ascertained how
or for what purpose the Contractor has used money previously paid on
account of the Contract Sum.
2.6.11 The Architect shall have the authority to reject Work which does not conform
to the Contract Documents. Whenever the Architect considers it necessary
or advisable for implementation of the intent of the Contract Documents,the
Architect will have authority to recommend to the Owner additional
inspection or testing of the Work in accordance with the provisions of the
Contract Documents, whether or not such Work is fabricated, installed or
completed. However, neither this authority of the Architect nor a decision
made in good faith either to exercise or not exercise such authority shall give
rise to a duty or responsibility of the Architect to the Contractor,
Subcontractors, material and equipment suppliers,their agents or employees
or other persons performing Portions of the Work.
2.6.12 The Architect shall review and approve or take other appropriate action upon
Contractor's submittals such as Shop Drawings, Product Data and Samples
for the purpose of(1)determining compliance with applicable laws, statutes,
ordinances and codes; and(2) determining whether or not the Work will be
in compliance with the requirements of the Contract Documents. The
Architect shall act with such reasonable promptness to cause no delay in the
Work or in the construction of the Owner or of separate contractors, while
allowing sufficient time in the Architect's professional judgment to permit
adequate review. Review of such submittals is not conducted for the purpose
Of determining the accuracy and completeness of other details such as
dimensions and quantities or for substantiating instructions for installation or
performance ofequipment or systems designed by the Contractor,all ofwhich
remain the responsibility of the Contractor to the extent required by the
Contract Documents. The Architect's review shall not constitute review or
approval of safety precautions, nor of construction means, methods,
techniques, sequences or procedures. The Architect's approval of a specific
item shall not indicate approval of an assembly of which the item is a
component. When professional certification of performance characteristics
of materials,systems or equipment is required by the Contract Documents,the
Architect shall be entitled to rely upon such certification to establish that the
materials, systems or equipment will meet the performance criteria required
by the Contract Documents.
2.6.13 The Architect shall prepare Change Orders and Construction Change
Directives, with supporting documentation and data if deemed necessary by
the Architect,for the Owner's approval and execution in accordance with the
Contract Documents, and may authorize minor changes in the Work not
involving an adjustment in the Contract Sum or an extension of the Contract
Time which are not inconsistent with the intent of the Contract Documents.
2.6.14 On behalf of the Owner,the Architect shall conduct inspections to determine
the dates of Substantial Completion and Final Completion, and shall issue
Certificates of Substantial and Final Completion. The Architect will receive
and review written guarantees and related documents required by the Contract
for Construction to be assembled by the Contractor and shall issue a final
certificate for Payment upon compliance with the requirements of the
Contract Documents.
2.6.15 The Architect shall interpret and provide recommendations on matters
concerning performance of the Owner and Contractor under the requirements
of the Contract Documents on written request of either the Owner or
Contractor. The Architect's response to such requests shall be made with
reasonable promptness and within any time limits agreed upon.
2.6.16 Interpretations and decisions of the Architect shall be consistent with the
intent of and reasonably inferred from the Contract Documents and shall be
in writing or in the form of drawings. When making such interpretations and
initial decisions, the Architect shall endeavor to secure faithful performance
by both Owner and Contractor, and shall not be liable for results or
interpretations or decisions so rendered in good faith in accordance with all
the provisions of this Agreement and in the absence of negligence.
2.6.17 The Architect shall render written decisions within a reasonable time on all
claims, disputes or other matters in question between the Owner and
Contractor relating to the execution or progress of the Work as provided in
the Contract Documents.
2.6.18 The Architect (1) shall render services under the Agreement in accordance
with the high professional standards as described in paragraph 1.1.2 herein;
and(2)by acknowledging payment by the Owner of any fees due,shall not be
released from any rights the Owner may have under the Agreement or
diminish any of the Architect's obligations thereunder.
2.6.19 The Architect shall provide the Owner with one(1)set of reproducible prints
and one (1) set of compact disks compatible with AutoCad 20001 of the
construction drawings showing all significant changes to the Construction
Documents during the Construction Phase. Drawings shall indicate significant
.7.
changes in the Work made during construction based on marked-up prints,
drawings and other data furnished by the Contractor to the Architect.
ARTICLE 3
ADDITIONAL SERVICES -
3.1 GENERAL
3.1.1 The services described in this Article 3 are not included in Basic Services
unless so identified in Article 11, and they shall be paid for by the Owner as
provided in this Agreement, in addition to the compensation for Basic
Services. The services described under Paragraphs 3.2 and 3.4 shall only be
provided if authorized or confirmed in writing by the Owner. If services de-
scribed under Contingent Additional Services in Paragraph 3.3 are required
due to circumstances beyond the Architect's control,the Architect shall notify
the Owner prior to commencing such services. If the Owner deems that such
services described under Paragraph 3.3 are not required,the Owner shall give
prompt written notice to the Architect. If the Owner indicates in writing that
all or part of such Contingent Additional Services are not required, the
Architect shall have no obligation to provide those services. Owner will be
responsible for compensating the Architect for Contingent Additional Services
only if they are not required due to the negligence or fault of Architect.
3.2 PROJECT REPRESENTATION BEYOND BASIC SERVICES
3.2.1 If more extensive representation at the site than is described in Subparagraph
2.6.5 is required, the Architect shall provide one or more Project
Representatives to assist in carrying out such additional on-site
responsibilities.
3.2.2 Project Representatives shall be selected, employed and directed by the
Architect, and the Architect shall be compensated therefore as agreed by the
Owner and Architect. The duties,responsibilities and limitations of authority
of Project Representatives shall be as described in the edition of AIA
Document B352 current as of the date of this Agreement, unless otherwise
agreed.
3.3 CONTINGENT ADDITIONAL SERVICES
3.3.1 Making material revisions in Drawings, Specifications or other documents
when such revisions are:
3.3.1.1 inconsistent with approvals or instructions previously given by
the Owner, including revisions made necessary by
adjustments in the Owner's program or Project budget;
3.3.1.2 required by the enactment or revision of codes, laws or
regulations subsequent to the preparation of such documents,
or
3.3.1.3 due to changes required as a result of the Owner's failure to
render decision in a timely manner.
3.3.2 Providing services required because of significant changes in the Project
including, but not limited to, size, quality,complexity,the Owner's schedule,
or the method of bidding and contracting for construction,except for services
required under Subparagraph 2.5.2.
3.3.3 The.Architect shall provide documents for alternate, separate or sequential --
bids or providing services in connection with bidding or construction prior to
the completion of the Construction Documents Phase.
3.3.4 Providing consultation concerning replacement of Work damaged by fire.or
other cause during construction, and furnishing services required in
connection with the replacement of such Work.
3.3.5 Providing services made necessary by the default of the Contractor, or by
failure of performance of either the Owner or Contractor under the Contract
for Construction.
3.3.6 Providing services in connection with a public hearing,arbitration proceeding
or legal proceeding except where the Architect is party thereto.
3.4 OPTIONAL ADDITIONAL SERVICES
3.4.1 Providing financial feasibility or other special studies,previously approved by
Owner.
3.4.2 Providing planning surveys, site evaluations or comparative studies of
prospective sites.
3.43 Providing special surveys,environmental studies and submissions required for
approvals of governmental authorities or others having jurisdiction over the
Project.
3.4.4 Providing services relative to future facilities, systems and equipment.
-9-
3.4.5 Providing coordination of construction performed by separate contractors or
by the Owner's own forces and coordination of services required in connection
with construction performed and equipment supplied by the Owner.
3.4.6 Providing services in connection with the work of a construction manager or
separate consultants retained by the Owner.
3.4.7 Providing detailed quantity surveys or inventories of material;equipment and
labor.
3.4.8 Making investigations, inventories of materials or equipment, or valuations
and detailed appraisals of existing facilities.
3.4.9 Providing assistance in the utilization of equipment or systems such as testing,
adjusting and balancing, preparation of operation and maintenance manuals,
training personnel for operation and maintenance and consultation during
operation.
3.4.10 Providing services other than as provided in Section 2.6.4, after issuance to
the Owner of the final Certificate for Payment and expiration of the Warranty
period of the Contract for Construction.
3.4.11 Providing services of consultants for other than architectural, structural,
mechanical, roofing, civil and electrical engineering portions of the Project
provided as a part of Basic Services.
3.4.12 Providing any other services not otherwise included in this Agreement or not
customarily furnished in accordance with generally accepted architectural
practice.
ARTICLE 4
OWNER'S RESPONSIBILITIES
4,1 The Owner shall consult with the Architect regarding requirements for the Project,
including(1)the Owner's objectives,(2)schedule and design constraints and criteria,
including space requirements and relationships, flexibility, expendability, special
equipment, systems and site requirements,as more specifically described in Paragraph
2.2.1.
4.2 The Owner shall establish and update an overall budget for the Project,including the
Construction Cost, the Owner`s other costs and contingencies related to all of these
costs.
-10-
4.3 The Owner Shall designate a representative authorized to act on the Owner's behalf
with respect to the Project. The Owner or such authorized representative shall render
decisions in a timely manner pertaining to documents submitted by the Architect in
order to avoid unreasonable delay in the orderly and sequential progress of the
Architect's services.
4.4 The Owner shall furnish the services of geotechnical engineers when such services are
requested by the Architect and agreed to by the Owner. Such services may include
but are not limited to test bores, test pits, determinations of soil bearing values,
percolation tests,evaluations ofhazardous materials and hazardous materials storage,
ground corrosion and resistivity tests,including necessary operations for anticipating
sub-soil conditions, with reports and appropriate professional recommendations.
4.5 The Owner shall furnish structural,mechanical,chemical,air and water pollution tests,
tests of hazardous materials, and other laboratory and environmental tests,
inspections and reports required by law or the Contract Documents.
4.6 The Owner shall famish all legal,accounting and insurance counseling services as may
be necessary at any time for the Project, including auditing services the Owner may
require to verify the Contractor's Applications for Payment or to ascertain how or for
what purposes the Contractor has used the money paid by or on behalf of the Owner.
4.9 The services,information,surveys and reports required by Paragraphs 4.4 through 4.7
shall be famished at the Owner's expense, and the Architect shall be entitled to rely
upon the accuracy and completeness thereof in the absence of any negligence on the
part of the Architect.
4.8 The Owner shall give prompt written notice to the Architect if the Owner becomes
aware of any fault or defect in the Project or nonconformance with the Contract
Documents.
4.9 Architect shall propose language for certificates or certifications to be requested of
the Architect or Architect's consultants and shall submit such to the Owner for review
and approval at least fourteen(14) days prior to execution. The Owner agrees not
to request certifications that would require knowledge or services beyond the scope
of this Agreement.
_llr
ARTICLE 5
CONSTRUCTION COST
5.1 DEFINITION
5.1.1 The Construction Cost shall be the total cost or estimated cost to the Owner
of all elements of the Project designed or specified by the Architect.
5.1.2 The Construction Cost shall include the cost at current market rates of labor
and materials furnished by the Owner and equipment designed, specified,
selected or specially provided for by the Architect, plus a reasonable
allowance for the Contractor's overhead and profit. In addition,a reasonable
allowance for contingencies shall be included for market conditions at the time
of bidding and for changes in the Work during construction.
5.1.3 Construction Cost does not include the compensation of the Architect and
Architect's consultants,the costs of the land,rights-of-way,financing or other
costs which are the responsibility of the Owner as provided in Article 4.
5.2 RESPONSIBILITY FOR CONSTRUCTION COST
5.2.1 Evaluations of the Owner's Project budget, preliminary estimates of
Construction Cost and detailed estimates of Construction Cost prepared by
the Architect represent the Architect's best judgment as a design professional
familiar with the construction industry. It is recognized,however,that neither
the Architect nor the Owner has control over the cost of labor, materials or
equipment, over the Contractor's methods of determining bid prices,or over
competitive bidding or market conditions. Accordingly,the Architect cannot
and does not warrant or represent that bids will not vary from the Owner's
Project budget or from any estimate of Construction Cost or evaluation
prepared or agreed to by the Architect.
5.2.2 No fixed limit of Construction Cost shall be established as a condition of this
Agreement by the furnishing,proposal or establishment of a Project budget,
unless such fixed limit has been agreed upon in writing and signed by the
parties thereto. If such a fixed limit has been established,the Architect shall
be permitted to include contingencies for design,bidding and price escalation,
to determine what materials, equipment, component systems and types of
construction are to be included in the Contract Documents, to make
reasonable adjustments in the scope of the Project and to include in the
Contract Documents alternate bids to adjust the Construction Cost to the
fixed limit. Fixed limits,if any,shall be increased in the amount of an increase
.12.
in the Contract Sum occurring after execution of the Contract for
Construction.
5.2.3 If the Bidding Phase has not commenced within 90 days after the Architect
submits the Construction Documents to the Owner, any Project budget or
fixed limit of Construction Cost shall be adjusted to reflect changes in the
general level of prices in the construction industry between the date of
submission of the Construction Documents to the Owner and the date on
which proposals are sought.
ARTICLE 6
USE OF ARCHITECT'S DRAWINGS,
SPECIFICATIONS AND OTHER DOCUMENTS
6.1 The Drawings, Specifications and other documents prepared by the Architect for this
Project are instruments of the Architect's service for use solely with respect to this
Project and, unless otherwise provided, the Architect shall be deemed the author of
these documents and shall retain all common law,statutory and other reserved rights,
including the copyright. The Owner shall be permitted to retain copies, including
reproducible copies,ofthe Architect's Drawings,Specifications and other documents
for information and reference in connection with the Owner's use and occupancy of
the Project. The Architect's Drawings, Specifications or other documents shall not
be used by the Owner or others on other projects for additions to this Project or for
completion of this Project by others, unless this Agreement is terminated because
Architect is in default of this Agreement, at which time the documents become the
property of the City of Beaumont.
6.2 Submission or distribution of documents to meet official regulatory requirements or
for similar purposes in connection with the Project is not to be construed as
publication in derogation of the Architect's reserved rights.
ARTICLE 7
TERMINATION,SUSPENSION OR ABANDONMENT
7.1 Architect may terminate this Agreement upon not less than thirty days written notice
should the Owner fail substantially to perform in accordance with the terms of this
Agreement through no fault of the Architect. Owner may terminate this Agreement
or any phase thereof upon thirty(30)days prior written notice to the Architect with
the understanding that immediately upon receipt of such notice, all work and labor
being performed under the Agreement shall cease immediately. Before the end of the
thirty(30) day period, Architect shall invoice the Owner for all work it performed
-13-
prior to the receipt of such notice. No amount shall be due for lost or anticipated
profits. All plans, field surveys, and other data related to the Project shall become
property ofthe Owner upon termination ofthe Agreement and paragraph 6.1 shall not
apply and they shall be promptly delivered to the Owner in a reasonably organized
form. Should Owner subsequently contract with a new architect for continuation of
services on the Project, Architect shall cooperate in providing information.
7.2 if the Project is suspended by the Owner for more than 30 consecutive days, the
Architect shall be compensated for services performed prior to notice of such
suspension. When the Project is resumed, the Architect's compensation shall be
equitably adjusted to provide for expenses incurred in the interruption and resumption
of the Architect's services.
7.3 This Agreement may be terminated by the Owner upon not less than seven days
written notice to the Architect in the event that the Project is permanently abandoned.
If the Project is abandoned by the Owner for more than 90 consecutive days, the
Architect or the Owner may terminate this Agreement by giving written notice.
7.4 Failure of the Owner to make payments to the Architect in accordance with this
Agreement shall be considered substantial nonperformance and cause for termination.
7.5 If the Owner fails to make payment to Architect within thirty(30)days of receipt of
a statement for services properly performed, the Architect may, upon seven days
written notice to the Owner, suspend performance of services under this Agreement.
Unless Architect receives payment in full within seven (7) days of the date of the
notice, the suspension shall take effect without further notice. In the event of a
suspension of services under this section, the Architect shall have no liability to the
Owner for delay or damage caused the Owner because of such suspension of services.
7.6 In the event of termination not the fault of the Architect, the Architect shall be
compensated for services properly performed prior to termination.
ARTICLE 8
MISCELLANEOUS PROVISIONS
8.1 This Agreement shall be governed by the laws of the State of Texas.
8.2 Terms in this Agreement shall have the same meaning as those in AIA Document
A201,General Conditions of the Contract for Construction, current as of the date of
this Agreement.
8.3 The Owner and Architect, respectively, bind themselves, their partners, successors,
assigns and legal representatives to the other party to this Agreement and to the
-14-
partners,successors,assigns and legal representatives ofsuch other party with respect
to all covenants of this Agreement. Neither Owner nor Architect shall assign this
Agreement without the written consent of the other.
8.4 This Agreement represents the entire and integrated agreement between the Owner
and Architect and supersedes all prior negotiations, representations or agreements,
either written or oral. This Agreement may be amended only by written instrument
signed by both Owner and Architect.
8.5 Nothing contained in this Agreement shall create a contractual relationship with or a
cause of action in favor of a third party against either the Owner or Architect.
8.6 Unless otherwise provided in this Agreement, the Architect and Architect's
consultants shall have no responsibility for the discovery,presence,handling,removal
or disposal of or exposure of persons to hazardous materials in any farm at the
Project site,including but not limited to asbestos,asbestos products,polychlorinated
biphenyl(PCB)or other toxic substances,provided,however,Architect shall have the
responsibility to and shall report to the Owner the location of any hazardous material
that an architect of skill and expertise should have noticed.
8.7 Upon receipt of prior written approval of Owner,the Architect shall have the right to
include representations of the design of the Project, including photographs of the
exterior and interior, among the Architect's promotional and professional materials.
The Architect's materials shall not include the Owner's confidential or proprietary
information ifthe Owner has previously advised the Architect in writing ofthe specific
information considered by the Owner to be confidential or proprietary. The Owner
shall provide professional credit for the Architect on the construction sign and in the
promotional materials for the Project.
ARTICLE 9
PAYMENTS TO THE ARCHITECT
9.1 DIRECT PERSONNEL EXPENSE
9.1.1 Direct Personnel Expense is defined as the direct salaries of the Architect's
personnel engaged on the Project and the portion of the cost of their
mandatory and customary contributions and benefits related thereto, such as
employment taxes and other statutory employee benefits, insurance, sick
leave, holidays,vacations, pensions and similar contributions and benefits.
9.2 REIMBURSABLE EXPENSES
_is.
9.2.1 Reimbursable Expenses are in addition to compensation for Basic and
Additional Services and include expenses incurred by the Architect and
Architect's employees and consultants in the interest of the Project, as
identified in the following clauses.
9.2.1.1 Expenses in connection with authorized out-of-town travel;
long distance communications and fees paid for securing
approval of authorities having jurisdiction over the Project.
9.2.1.2 If authorized in advance by the Owner, expense of overtime
work requiring higher than regular rates.
9.2.1.3 Expense of renderings,models and mock-ups requested by the
Owner.
9.2.1.4 Reproduction expenses associated with the printing of Plans
and Specifications to be used in the Bidding Phase.
9.3 PAYMENTS ON ACCOUNT OF BASIC SERVICES
9.3.1 Payments for Basic Services shall be made monthly and, where applicable,
shall be in proportion to services performed within each phase of service, on
the basis set forth in Subparagraph 10.2.2.
9.3.2 When compensation is based on a percentage of Construction Cost and any
portions of the Project are deleted or otherwise not constructed,
compensation for those portions of the Project shall be payable to the extent
services are performed on those portions,in accordance with the schedule set
forth in Subparagraph 10.2.2 based on(1)the lowest bona fide bid or(2)if no
such bid or proposal is received, the most recent preliminary estimate of
Construction Cost or detailed estimate of Construction Cost for such portions
of the Project.
9.4 PAYMENTS ON ACCOUNT OF ADDITIONAL SERVICES
9.4.1 Payments on account of the Architect's Additional Services and for
Reimbursable Expenses shall be made monthly upon presentation of the
Architect's statement of services rendered or expenses incurred. Such charges
shall be included as a separate item on the Architect's statement for Basic
Services.
9.5 PAYMENTS WiTBBELD
9.5.1 No deductions shall be made from the Architect's compensation on account
of penalty, liquidated damages or other sums withheld from payments to
-16-
contractors,or on account of the cost of changes in the Work other than those
for which the Architect is responsible.
9.6 ARCHITECT'S ACCOUNTING RECORDS
9.6.1 Architect shall make available to Owner or Owner's authorized representative
records of Reimbursable Expenses and expenses pertaining to Additional
Services and services performed on the basis of a multiple of Djrect Personnel
Expense for inspection and copying during regular business hours for three
years after the date of the final Certificate of Payment, or until any litigation
related to the Project is final, whichever date is later.
ARTICLE 10
BASIS OF COMPENSATION
The Owner shall compensate the Architect as follows:
10.1 BASIC COMPENSATION
10.1.1 FOR BASIC SERVICES, as described in Article 2, and any other services
included in Article 11 as part of Basic Services,Basic Compensation shall be
as follows:
Six Point Eight Seven Five Percent (6.875%)of the construction cost, not
to exceed Sixty-five Thousand Dollars( $65,000),unless the agreed upon
program is expanded.
10.1.2 Progress payments for Basic Services in each phase shall total the
following percentages of the total Basic Compensation payable:
• Schematic Design Phase 15%
• Design and Development Phase 20%
• Construction Documents Phase 30%
•Bidding Phase 10%
• Construction Phase 25%
• Total Basic Compensation 1000/0
10.2 COMPENSATION FOR ADDITIONAL SERVICES
10.2.1 FOR PROJECT REPRESENTATION BEYOND BASIC SERVICES, as
described in Paragraph 3.2, compensation shall be computed as follows:
-17-
See Attachment
10.2.2 FOR ADDITIONAL SERVICES OF TIE ,ARCHITECT, as described in
Articles 3 and 11, other than (1) Additional Project Representation, as
described in Paragraph 3.2, and (2) services included in Article 11 as part of
Additional Services,but excluding services ofconsultants,compensation shall
be computed as follows:
See Attachment"A".
10.2.3 FOR ADDITIONAL SERVICES OF CONSULTANTS,including additional
structural, mechanical, electrical, and civil engineering services and those
provided under Subparagraph 3.4.11 or identified in Article 11 as part of
Additional Services, a multiple of 1.15 times the amounts billed to the
Architect for such services.
10.3 REMMURSABLE EXPENSES
10.3.1 FOR REEMBURSABLE EXPENSES,as described in Paragraph 9.2,and any
other items included in Article 11 as Reimbursable Expenses, a multiple of
1.15 times the expenses incurred by the Architect,the Architect's employees
and consultants in the interest of the Project.
10.4 ADDITIONAL PROVISIONS
10.4.1 Payments are due and payable thirty(30)days from the date of receipt of the
Architect's invoice. Amounts for services properly performed which remain
unpaid sixty(60) days after the invoice date shall bear interest at the rate of
one(1%)percent per month.
ARTICLE 11
OTHER CONDITIONS OR SERVICES
11.1 Architect shall maintain, at no expense to Owner, a professional liability(errors and
omissions)insurance policy placed with a company rated at least B+/X by Best's Key
Rating Guide, authorized to do business in Texas, in an amount not less than one
million dollars($1,000,000). Such policy shall require the giving of written notice to
Owner at least thirty days prior to cancellation or non-renewal of any policies.
Architect shall furnish Owner with copies of said policies or certificates evidencing
such coverage.
11.2 Architect agrees to indemnify and hold harmless the City, its officers, agents,
and employees from and against any and all claims or suits for injuries,
-18-
No Text
damages, loss, or liability of whatever kind of character, arising out of or in
connection with the performance by the Architect of those services
contemplated by this Agreement,based upon the negligent acts of Architect,its
officers,agents,employees and expressly including allegations of negligence,acts
or omissions of the City of Beaumont, its agents, officers or employees, when
such negligence to the City arises from the negligent performance of professional
work undertaken by Architect hereunder.
This Agreement entered into as of the day and year first written above.
CITY OF BEAUMONT,TEXAS SIGMA ENGINEERS,INC.
OWNER ARCHITECT
BY: BY:
Kyle Hayes, City Manager Sina K.Nejad,P. E.
President
-19-