Loading...
HomeMy WebLinkAboutRES 04-090 RESOLUTION NO. 04-090 WHEREAS, on August 19, 2003, the City Council of the City of Beaumont, Texas, awarded a contract to Allco, Inc., in the amount of$833,786 for the Barscreen Area and Belt Press Conveyor Improvements Project; and, WHEREAS, Change Order No. 1 in the amount of$163,626 is required to restore the structural integrity of 1500 square feet of walls and ceiling surface area inside the wet well of the main pump station at the Wastewater Treatment Plant by installing 4-inch thick repair mortar and reinforcement, to install 80 mils of protective coating to the restored surface area, and to provide diversion pumping during construction,thereby increasing the contract amount to $997,412; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be, and he is hereby authorized, to execute Change Order No. 1 to the Barscreen Area and Belt Press Conveyor Improvements Project in the amount of $833,786 to restore the structural integrity of 1500 square feet of walls and ceiling surface area inside the wet well of the main pump station at the Wastewater Treatment Plant by installing 4-inch thick repair mortar and reinforcement, to install 80 mils of protective coating to the restored surface area, and to provide diversion pumping during construction increasing the contract amount to $997,412 PASSED BY THE CITY COUNCIL of the City of Beaumont this the 20th day of April, 2004. WOO M r Evelyn M. Lord - ionkkk