Loading...
HomeMy WebLinkAboutPACKET APRIL 20 2004 4� it _y of Beaumont REGULAR MEETING OF THE CITY COUNCIL COUNCIL CHAMBERS APRIL 20, 2004 1:30 P.M. AGENDA CALL TO ORDER * Invocation Pledge Roll Call Presentations and Recognition Public Comment: Persons may speak on scheduled agenda items 1-2/Consent Agenda Consent Agenda GENERAL BUSINESS 1. Consider approving a one (1) year contract for the purchase of fittings, pipes and couplings for use in the Water Utilities Division 2. Consider authorizing the City Manager to increase the Barscreen Area and Belt Press Conveyor Improvements Project amount for"extra work" COMMENTS Councilmembers/City Manager comment on various matters * Public Comment (Persons are limited to 3 minutes) EXECUTIVE SESSION * Consider matters related to contemplated or pending litigation in accordance with Section 551.071 of the Government Code: Claim of Stephen Thompson Persons with disabilities who plan to attend this meeting and who may need auxiliary aids or services are requested to contact Pat Buehrle at 880-3725 a day prior to the meeting. i 1 April 20, 2004 Consider approving a one (1) year contract for the purchase of fittings, pipes and couplings for use in the Water Utilities Division i CIE1. ...Jl!. City of Beaumont Council Agenda It � = • � g em TO: City Council FROM: Kyle Hayes, City Manager PREPARED BY: Kirby Richard, Central Services Director MEETING DATE: April 20, 2004 AGENDA MEMO DATE: April 13, 2004 REQUESTED ACTION: Council approval of a one (1) year contract for the purchase of fittings, pipes and couplings. RECOMMENDATION Administration recommends award of an annual contract for purchasing fittings, pipes and couplings to various vendors at the unit costs reflected in the attached bid tabulation, with an estimated total annual expenditure of$397,130.14. BACKGROUND Bids were requested for an annual contract for couplings, brass fittings, plastic tubing and other water-related materials for use by the Water Utilities Division. The materials are used in the repair of existing water lines, installation of new water service lines, and in the maintenance of existing water mains and meters. The materials are utilized to maintain adequate water service throughout the City. Forty-seven(47)vendors were notified, with four (4) responding with bids. Specifications stated that the contract would be awarded to the low bidder per section. The low bidder per section is shaded for identification in the attached bid tabulation. The estimated annual expenditure to each vendor under the contract is as follows: $65,961.19 to Coburn Supply of Beaumont, $307,590.65 to Golden Triangle Pipe of Beaumont, $17,466.30 to Hughes Supply of Lufkin, and $6,112.00 to Rural Pipe of Jasper. BUDGETARY IMPACT Funds are available for this expenditure in the Water Utilities Division's operating budget. i Annual Contract for Fittings, Pipe and Couplings April 13, 2004 Page 2 PREVIOUS ACTION None. SUBSEQUENT ACTION None. RECOMMENDED BY City Manager, Central Services Director, and Public Works Director. BID TABULATION FOR FITTINGS,PIPES,AND COUPLINGS BID NUMBER:RF0104-18 BID OPENING DATE:MARCH 25,2004,2 PM ��- COBURN SUPPLY GOLDEN TRIANGLE PIPE HUGHES SUPPLY 'I RURAL PIPE IBEAUMONT,TX BEAUMONT TX LUFKIN TX JASPER TX Item# Qty Description Unit Total Unit Total Unit Total Unit Total BENDS 1 30 6" bend M.J.45 degree D.I.w/accessory pack E$6 00 $1,680.00 $52.70 $1;581.00 $49.26 $1,477.80 $46.23 $1,386.90 2 15 6" bend M.J.90 degree D.I.w/accessory pack 00 $915.00 $57.35 $860,25 $53.81 $80715 $53.81 $807.15 i 3 10 8"bend M.J.45 degree D.I.w/accessory ack $79.00 $790.00 $73.95, $739.50 $69.73 $697.30 $65.001 $650.00 4 10 8"bend M.J.90 degree D.I.w/accessory pack $87.00 $870.00 $81.60 $816.00: $76.93 $769.30 $76.00 $760.00 5 j 40 6"x 6"tee M.J.x M.J.x swivel D.I.w/accessory pack $110.00 $4,400.00 $102.10' $4,084.00' $96,251 $3,850.00 $96.25 $3,850.00 6 6 -16"-2"tapped cap M.J.x 2"F.I.P.T.D.I.w/accessory pack $36.00 $216.00 534.10'' $204.60 $32.211 $193.26 $32.21 $193.26 MANUFACTURER BID: T ler Tyle, I T ler/Star Pipe** Sigma** Total-Bends $8,871.00� n $7647.31 1 BOLTED COUPLINGS 7 300 3/4"bolted coupling S.B.411-010501-003 steel pipe size 1 $16.60 $4,980.00 $10.75 $3,225.00 $17.061 $5,118.00 $9.25 $2,775.00 8 100 V bolted coupling S.B.411-013201-003 steel pie $20.90 $2,090.001 $11.10! $1,110100 $21.48 $2,148.00 $10.46 $1,046.0011 9 30 1-1/4"bolted coupling S.B.411-016601-003 steel pipe size $22.22 $666.60 $11.60 $348.00' $22.84 $685.20 $12.31 $369.30 10 60 1-1/2"bolted coupling S.B.411-019001-003 steel pipe size $22.22 $1,333.20 $13.85 $831.00 $22.84 $1,370.40 $13.20 $792.00 11 200 2"bolted coupling S.B.411-023801-003 steel pipe size $29.51 $5,902.00 $15.70 $3,140.00 $30.31 $6,062.00 $18.77 $3,754.00 12 r:20 2"bolted coupling S.B.441-000263-900 C.I.pipe size $17.80 $5,340.00 $15.3$ $4,605.00 $18.29 $5,487.00 $15.50 $4,650.00� E14 2-1/2"bolted coupling S.B.441-000288-900 C.I.pipe size $19.05 $381.00 $19.85: $397,00 $19.57 $391.40 $20.00 $400.00 6"bolted coupling S.B.441-000722-900 C.I.pipe size $35.80 $7,160 00 $40.50 $8,100.00 $36.78 $7,356.00 $40.00 $8,000.0015 8"Bolted coupling S.B.441-000945-900 C.I.pipe size $51.46 $2,573.00 $51.20 $2,560.00 $52.86 $2,643.00' $50.00 $2,500.00 16 50 1 12"Bolted coupling S.B.441-000945-900 C.I.pipe size $74.28 $3,714 00 $85.60' $4,280.04' $76.30 $3,815.00 $85.38 $4,269.00 MANUFACTURER BID: Ford Smith Blair 1 Ford Dresser Total-Bolted Couplings $34,139.80 $28,596.00* $35,076.00 $28 555 30 FULL CIRCLE CLAMPS 17 25 2-1/2"X 7-1/2"full circle clamp S.B.226-00027507- $23.69 $592.25' $23.90 $597.50 $24.341 $608.50 $23.57 $589.25 000 for cast iron 18 10 4"x 7-112"full circle clamp S.B.226-00048007-000 $31.69 $316.90 $29.75 $297.50 $32.56 $325.60 $24.21 $242.101' 19 10 3-4"x 7-1/2"full circle clamp S.B.226-00037507-000 $30.19 $301.90' $26.80 $268.00 $31.02 $310.20 $24.76 $247.60 20 IO 3-4 x 7-1/2" full circle clamp S.B.226-00040007-000 $27.94 $279.40 $27.80 $278.00 $28.71 $287.10 $27.25 $272.50 �21 25 6"x 7-1/2"full circle clamp S.B.226-071007 for A.C.pipe $32.20 $805.00 $35.65 $891.25 $33.08 $827.00 $28.57, 2E2 300 2"x 7-1/2"full circle clamp S.B.226-023807 for C.I.pipe $23.38 $7,014.00.. $22.05 $6,615.00 $24.02 $7,206.00 $23.57 $7,071.00, 23 65 6"x 7-1/2"full circle clamp S.B.226-069007 for C.I.pipe $3720 $2,093.001- $35.15 $2,284.75 $33.08 $2,150.20 $33.49 $2,176.85 24 50 6"x 12-1/2"full circle clamp S.B.226-069012 for C.I.pipe $43.40 $2,170.00 $56.20 $2,810.00 $44.59 $2,229.50 $44.11 $2,205.50 25 15 6"x 15"full circle clam S.B. 226-069015 for C.I.pie $50.96 $764.40 $65.30 $979.50 $52.36 $785.40 $52.53 $787.95 26 30 6"x 20"full circle clamp S.B.226-069020 for C.I.pipe $69.87 $2,096.10 $94.65 $2,839.50 $71.78 $2,153.40 $74.28 $2,228.40 27 25 8"x 7-1/2"full circle clamp S.B.226-090507 for C.I.pie $32.81 $820.25. $42.05 $1,051.25 $33.71 $842.75 $32.39 $809.75 28 12 8"x 20"full circle clamp S.B.226-0900520 for C.I.pipe $77.81 $933.72 $111.10 $1,333.20 $79.93 $959.16 $85.60 $1,027.20,; 29 25 12"x 7-1/2"full circle clamp S.B.226-132007-000 for $36.69 $917.25 $57.70 $1,442.50 $45.57 $1,139.25 $48.01 $1=$000 Class 50 cast iron pipe I 30 16 12"x 12-1/2"frill circle clamp S.B.226-132012 for C.I.pipe $70.94 $1,135.04 $92.85 $1,485.60 $72.88 $1,16608 1 $77.01 1 $1,232.16 MANUFACTURER BID: Fortl Smith Blair Ford Romac Total-Full Circle Clams S20,239.21 $23,173.55 $20 990 14 $20,804.76 SERVICE SADDLES 31 5 2"x 3/4"service saddle for PVC pipe $7.67 $38.35 $7,30 $36.50 $7.89 $39.45 $8.57 $42.85 32 50 2"x 1"service saddle for SDR-26 PVC pipe $7.67 $383.50 $7.30 $365.00 $7.89 $394.50: $8.57 $428.50 33 5 6"x 3/4"service saddle for C-900 e i P $17.80 $89.00 $16.90 $84.50: $18.29 $91.451 $19.86 $99.30 34 5 8"x 3/4"service saddle for C-900 pipe $24,91 $124.55 $23.65 $118.25 $25.60 $128.00 $27.81 $139.05 35 100 6"x 1"service saddle for C-900 PVC pipe $17.80 $1,780.00 $16.90. $1690.00 $18.29 $1,829.001 $19.86 $1,986.00 36 40 8"x 1"service saddle for C-900 PVC pipe $24.91 $996.40 $23.65 $946.00 $25.60 $1,024.00 $27.81 $1,112.40 37 5 2"x 3/4" service saddle for cast iron pipe $8.14 $40.70 $14.15 $70.75 $29.86 $149.30 NB $0.00 38 24 2"x l"service saddle for C.I.pi e N/B $0.00 $14.15 $339.60 $29.86 $716.64 NB $0.00 39 20 6"x 1"service saddle for single strap 910-967 $17.80' $356.00 $23.35 $467.00 $18.29 $365.80 $19.86 $397.20. 40 100 6"x 1"service saddle D.S.for cast iron 1 $40.09 $4,009.00 $40.95. $4,095.00 $41.18 $4,118.00 $44.74 $4,474.00 41 25 9"-1-1/2"service saddle D.S.for cast iron _ $45.841 $1 146.001 $46.85 $1,171.25 $47.091 $1,177.25 $51.15 $1,27975 i F. COBURN SUPPLY GOLDEN TRIANGLE PIPE HUGHES SUPPLY RURAL PIPE BEAUMONT,TX BEAUMONT TX LUFKIN TX JASPER,TX Item# Qty Description Unit Total Unit Total Unit Total Unit Total 42 30 6"x 2"service saddle D.S.for cast iron $50.36 $1,510.80 $51.45 $1,543.50 $51.74 $1,552.20 $56.20 $1,686.00 43 60 8"x 1"service saddle D.S.for cast iron $49.62- $2,977.20 $50,70 $3,042.00 $50.96 $3,057.601 $3,322.20 MANUFACTURER BID: I Ford James Jones/Cambrid"e Ford A.Y.McDonald Total Service Saddles $13,451.50 $13 969 35 $14,643.19 $14,966.25, it COUPLINGS 44 50 3/4"female coupling bomze F.I.P.T. $5.15 $257.50 $4.75 $237.50 $5.30 $265.00 $5.05 $252.50 45 50 1"female coupling bronze F.I.P.T. $6.80 $340.00 I' $6.30 $315.00 $6.99 $349.50 $6.85 $342.50 46 20 1-1/2"female coupling bronze F.I.P.T. $17.18; $343.60 $16.75 $335.00 $17.66 $353.20 $18.24 $364.80', 47 20 2"female couplinE bronze F.I.P.T. $20.28 $405.60 $19.95 $399,00 $20.83 $416.60 $21.72 $434.40 48 1000 3/4"male coupling bronze M.I.P.T. $4.93 $4,930.00 $4.45 $4,450.00 $5.07' $5,070.00 $4.80 $4,800.00 49 400 1"male coupling bronze M.I.P.T. $5.76 $2,304.00 $5.25 $2,100.00'' $5.92 $2,368.00 $5.69 $2,276.00 50 100 1-1/2"male cog ling bronze M.I.P.T. $13.64 $1,364.00' $13.10 $1,310.00 $14.02 $1,402.00 $14.26 $1,426.00 51 200 2"male coupling bronze M.I.P.T. $19.44 $3,888.00 $19.05 $3,810.00' $19.98 $3,996.001 $20.77 $4,154.00 52 100 3/4"meter coupling bronze 90 degree w/M.I.P.T. $4.07, $407.00 $3.20 $320.00 $4.18 $418.00 $4.28 $428.00, 53 200 1"meter coupling bronze 90 degree w/M.I.P.T. $5.82 $1,164.00' $4.35 $87' $5.98 $1,196.00 $5.941 $1,188.00 54 25 3/4"coupling bronze straight meter coupling $2.77 $69.25! $1.90 $47.50.. $2.85 $71.25 $2.81'i $70.25 55 25 1"meter coupling bronze strai gh t w/M.I.P.T. $4.27 $106.75 $2.97 $74.25 $4.39 $109.75: $4.49 $112.251 56 400 3/4"union coupling bronze $5.86 $2,344.00 $5.75 $2,300.00 $6.02 $2,408.00 E$6.70.85 �$2,340.00 57 200 1"union coupling bronze $6.65 $1,330.00 $6.15 $1,230.00 $6.84 $1,368.00 $1,340.00 58 50 1-1/2"union couping bronze $18.69 $934.50 $18.80' $940.00 $19.21 $960.50 $20.49 $1,024.50.. 59 80 2"union coupling bronze $25.56 $2,044.80 $25.40 $2,032.00 $26.26: $2,100.80 $27.66 $2,212.80 60 400 3/4"bronze coupling $3.35' $1,340.00: $2.67 $1,068.00' $2.741!, $1,096.00 $1.071 $428.00 61 300 1"coupling bronze ------------ $5.71 $1,713.00 $4.03 $1,209.00' $4.67 1 401.00, $ , $1.63 $489.00 62 100 1-1/2"coupling bronze $12.41 $1,241.00' $8.75 $875.00 $10.151 $1,015.00 $3.45 $345.00 63 100 2"coupling bronze American made $20.53 $2,053.00 $14.45 $1,445.00 $16.78 $1,678.00 N/B $0.00 MANUFACTURER BID: Ford/Merit/Cooper James Jones/Merit/Combrid Ford/Merit A.Y.McDonald** i Total-Couplings $28,580.00 $25,367.25 $28042.60 $24 028.00 BUSHINGS 64 200 1"X 3/4" bushing bronze 1"M.I.P.T.x 3/4"F.I.P.T. $3.35 $670.00 $2.36 5472.00 $2.74 $548.00 $1.07 $214.00 65 60 1-1/2"x t"bushing bronze 1-1/2"M.I.P.T.x F.I.P.T. $8.14 $488.40 $5.72' $343.20 $6.64 $398.40 $2.33 $139.80 66 60 2"X 3/4"bushin bronze M.I.P.T.x F.I.P.T. $10.04 $602.40 $7.05' $423.00 $8.20 $492.00 $4.16 $249.60 67 60 2"x 1"bushing bronze 2"M.I.P.T.x I"F.I.P.T. $10.04 $602.40 $7.05 $423.00' $8.20 $492.00 $4.16 $249.60 68 40 2"x 1-1/2"bushing bronze 2"M.I.P.T.x 1-1/2" $10.04. $401.60 $7.05 $282.00' $8.20' $328.00 $3.46: $138.40 F.I.P.T FACTURER BID: Merit/Cooper .Merit Merit Matco** Total-Bushin s $2 764.80 $1 943.20' $2,258.40 $991.40 ANGLESTOPS 69 600 3/4"angle ball stop bronze $19.68 $11,808.00 $12.60' $7,560.00 $20.22; $12,132.00 $21.72:1 $13,032.00 70 300 1"angle ball lock wing stop bronze $29.66 $8,898.00 $31.20 $4 360.00 $30.47 $9,141.00 $32.72 $9,816.00;I 71 25 1-1/2"angle lock wing ball stop M.LP.T.x Fl . $58.86 $1,471.50 $56.50 $1,412'650 $60.47 $1,511.75 $64.94 $1,623.50 72 40 2"angle lock wing ball stop M.LP.T.x Flg. $69.45 $2,778 00 $66.75 $2,670.00' $2,854.00 $76.63 $3,065.20 73 10 3/4"corp.ball stop bronze $14.45, $144.50 $14.00 $140.00 $14.85 $148.50 $15.22,' $152.20 74 400 1"core.ball stop bronze $18.84 $7,536.00 $18.40 $7,360.00 $19.36 $7,744.00 $20.02 $8,008.0011 75 20 1-1/2"corp.ball stop bronze $38.14 $762.80 $38.40 $768.00 $39.18 $783.60 $41.01' $820.20 11 76 50 1-1/2"curb ball stop t-head $42.69 $2,134.50 $41.60. $2,080.00 $43.86 $2,193.00 $47.11 $2,355.50 77 60 2"corp.ball stop bronze $62.44 $3,746.40 $63.50 $3,810,00 $64.15 $3,849.00i $67.84 $4,070.40 78 300 314"curb ball stop bronzet-head $14.67: $4,401.00 $10.95 $3,285.00 $15.08 $4,524.00 $16.191 $4,857.00,1 79 200 1"curb ball stop bronze t-head $22.80 $4,560.00 $23.10 $4,620.00 $23.42. $4,684.00 $25.16 $5,032.001 80 too 2"curb ball stop bronze t-head $62.44 $6,244.00 $63.25 $6,325.00 $64.151 $6,415.001 $68.89 $6,889.00 81 60 1-1/2 meterflan a bronze w/F.I.P.T $44.88 $2,692.80 $11.65 $649.00 $25.00 $1,500.00. $12.47 $748.20 82 100 2"meter flange bronze with F.I.P.T. $71.57 $7,157.00 $15.25' $1,525.00 $27.00 $2,700.00 $16.27 $1,627.00 83 300 3/4"--I -nze 90 de ee $3.82 $1,146.00 $2,68. $804.00 $3.12 $936.00 $1.25 $375.00 84 300 1"ells bronze 90 degree $6.20 $1,860.00 $4.36 $1,308.00 $5.08 $1,524.00 $1.92 $576.00 85 60 1-1/2"ells bronze 90 degree $12.43 $745.80 $8.74 $524,40 $10.15' $609.00 $3.83 $229.80 86 100 2"ells bronze 90 degree $20.05 $2,005.00 $14.10 $1,410.00 $16.38 $1,638.00 $6.23 $623.00:1 87 300 3/4"street ells 90 degree bronze $5.25 $1,575.00 $3.70 $1,110.00 $4.29 $1,287.00 $1.63 $489.0011 88 200 I"street ells 90 degree bronze $8.60 L:�$1,720.001 $6.05. $1,210.00 $7.03 $1,406.00' $2.70 $540.00 89 60 1-1/2"street ells 90 degree bronze $17.18 1 030.801 $12.10 $726.00- $14.04 $842.40 $5.37 $322.20 i 1 COBURN SUPPLY GOLDEN TRIANGLE PIPE HUGHES SUPPLY 1 RURAL PIPE 1 BEAUMONT,TX BFAUMONT TX LUFIN,TX JASPER TX 1,Item#' Qty Description Uni Total Unit Total Unit Total Unit Total 90 200 2"street ells 90 degree bronze $29.14 $5,828.00 1 $20.50 $4,100.00' $23.801 $4,760.00 $9.11 $1,822.00 MANUFACTURER BID: Merit Ford Coo er Merit/James JoneslCambrid'Ford Merit A.Y.McDonald Total-Anele Stops $80 245.10 $62,806.90 $73,182.25 $67,073 20 7. NIPPLES 91 800 3/4"x2"bronze nip le $1.30 $1,040.00 $0.90 $720.00' $1.12 $896.00 $0.85 $680.00111 92 600 3/4"x 6"bronze nipple $3.32 $1,992.00 $2.30 $1,380,00..1 $2.84 $1,704.00, $2.17 $1,302.00 93 400 1"x 3"bronze nie $2.51 $1,004.00 $1.75 $?00.00'> $2.16 $864.001 $1.871 $748.00 94 100 1"x 6"bronze nipple $4.85 $485.00 $3.37 $337.00 $4.15 $415.00 $3.60 $360.00' 95 50 1-1/2"x 4"bronze nipple $5.77 $288.50 $4.01' $200.50: $4.94' $247.00 $4.29' $214.50 96 100 2"x 4"bronze nipple $7.41 $741.00 $5.15 $515.00' $6.36 $636.00 $5.51 $551.00 97 100 2"x 6"bronze nipple $10.97 $1,097.00 $7.60 $760.00 $9.38 $938.001 $8.14 $814.00 MANUFACTURER BID: Merit Merit r Merit Mateo Total-Nipples $6 647.50 $4,612.50' $5 700 00 $4669.50 1 TUBINGS 98 5,000 3/4"X 500' PVC C.T.S.tubing $0.17 $850.00 $0.12 $600.00 $0.15 $750.001 $0.12 $600.00 99 20,400 V x 300'PVC C.T.S.tubing $0.18 $3,672.00; $0.19 $3,876.00, $0.25 $5,100.00 $0.18 $3;672.00 100 2,000 1-1/2"x 100'PVC C.T.S.tubing $0.36 $720.00 $0.38 $760.00 $0.47 $940.00 $0.361 $720.00 101 2,000 2"x 100'PVC C.T.S.tubing 1 $0.461 $920.00 $0.60 $1,200.00 $0.74 $1,480.00 $0.56 $1,120.00 MANUFACTURER BID: Charter Plastics NuMex NuMex NuMex Total-Tubin s _-j $6,162.00 $6,436.00 $8 270.00' $6112.00 FIRE HYDRANT BURY 102 100 Fire Hydrant American Flo Control 13-84-B 3'6"bury $852.00, $85,200.00 $875.00 $87,500.00 $873.88 $87,388.00'N/13 I $0.00 MANUFACTURER BID: M&H/Kenned *** American Flo Control American Flo Control -�I Total-Fire Hydrant B $85 200 00 S87,500.00- $87,388.00 $0200 00 00 VALVES AND VALVE TAPS 103 60 6"gate valve M.J.x M.J. $270.00 $16,200.00 $259.10 $15,546.00 $256.20 $15,372.00 $232.00 $13,920.00 104 30 8"gate valve M.J.x M.J. $429.00 $12,870.00 $404,40 $12,132.00 $408.00 $12,240.00 $369.00 $11,070.00 105 30 Darling 865 tapping valve(Kennedy,Mueller)American $380.00 $11,400.00 $345.10 $10,353.00 $357.40 $10,722.00 $232.00 $6,960.00 made i 106 20 8"tapping valve tap x M.J. $553.00 $11,060.00 $524.20 $10,484.00' $548.91 $10,978.20 $498.00 $9,960.00 107 12 12"gate valve M.J.,ductile iron,NRS,resilient seat,wrench $870.00 $10,440.00 $780,50' $9,366.00 $848.66 $10,183.92 $767.00 $9,204.00 accessory pack,American flow Control 2512,American mad'�e 108 1 4 12"tapping gate valve M.J.,ductile iron,NRS,resilient seat, $1,270.00 $5,080.00 $1,168.40 $4,673'.b0 $1,256.02 li $5,024.08 $1,139.95 $4,559.80 wrench nut,ace.pack,Amer.flow cont.2512,American made MANUFACTURER BID' Kenned American Fl,Control`American Flo Control American Flo Control�American Flo Control I AVK*** Total-Valves&Valve Ta�s $67 050 00 $62 554.60 $64,520 20 $55,673.80 METER BOXES 109 300 #37T cast iron(solid)lid for#37 marked water, $16.31 $4,893.00 $14.95 $4,485.00 $16.31 $4,893.001 NB $0.00 concrete meter box American made 110 80 #65 cast iron meter box lid 2 piece,marked water. $28.39 $2,271.20 $26.05 $2,084.00 $28.11 $2,248.80 NB $0.00 111 200 Cast iron meter box,Ford YMBHC 141233 straight $91.20 $18,240.00 $113.951 $22,790.00 $93.75 $18,750.00 N/B $0.001 locking ball inlet with compression nut 10"high dual check lid,for 5/8"-3/4"meters it 2 50 Cast iron meter box Ford YL111-444 straight ball $137.21 $6,860.50 $171.30 $8,565.00 $140.95 $7,047.50 NB, inlet with compression nut 10"high,1"female I.P.T. outlet non-locking lid,for 1"meter 113 25 Cast iron grade adjuster Ford LYGA 1-1/4"-3" $99.96 $2,499.00` $40.40 $1,010.00 $69.43 $1,735.75 N/B $0.00 complete for Ford cast iron box YL 141233 114 24 2"Cast iron Ford 12-23/32"high protector meter box $244.77 $5,$74.4$: $305.601 $7,334.40 $251.43 $6,034.32 NB $0.0011 complete with 3 piece lid marked Water.FPMB-7 Standard finish. 115 24 2"Ball inlet Ford BFP 83-777W M.I.P.T.x Fig for a $84,82 $2,035.68 $108.00 $2,592.001 $87.13 2 $ ,091.12 NBi $0.00,1 Ford cast iron meter box 116 24 2"Ball inlet Ford BFP 31-777 M.I.P.T.x Fig for a $57.64 $1,383.36' $73.40 $1,761.60 $59.21 $1,421.04 NB $0.001 Ford cast iron meter box 117 12 2" Ford protector cast iron meter box lid end pc $10.20 $122.40 $12.75 $153.00 $10.49 $125.88 NB $0.001 FPMBL-E7 118 12 2"Ford protector cast iron meter box lid center c. _ $24.68 $296.16 $30.85 $370.20 $25.36 $304.32 NB _ $0.00 i COBURN SUPPLY GOLDEN TRIANGLE PIPE HUGHES SUPPLY RURAL PIPE BEAUMONT,TX BEAUMONT TX LUFKIN TX I IASPFR'TX Item# Qty Description Unit Total Unit Total Unit Total Unit Total FPMBL-C7 119 12 1-1/2"Ford ball valve BFP83-676W F.I.P.T.x Flg for $56.31 $675.72 $71.70 $860.40: $57.84 $694.08 NB $0.00 installing 1-I/2"meter. 120 12 1-1/2"check valve bronze Ford HFS31-666.F.I.P.T.x $47.54 $570.48' $55.85 $670.20 $48.84, $586.08 NB $0.001 fl . MANUFACTURER BID: Ford Ford Fmd/Southera Total-Meter Boxes $45.721.981 $0.00 $0.00 VALVE BOXES 121 40 Valve box top C.I.5-1/4"x 10"American made $14.00 $560.00 $12.65 $506.00 $15.51 $620.40 NB $0.00 122 60 Valve box lid C.I.for 5-1/4"box American made $9.00 $540.00 $8.50 $510.00' $9.63 $577.80 N/B $0.00 123 100 Valve box riser 5-1/4"x 2-1/4"C.I.American made $17.00 $1,700.00 $10.00 $1,000.00' $9.90 $990.00;N/B $0.00 124 100 Valve box bottom 5-1/4"Tylere 562-S $24.00 $2,400.00 $22.55 $2,255.00 $26.40 $2,640.00 N/B $0.00 125 100 Valve box top 5-1/4"x 16"long shaft cast iron for Tyler $20.00 $2,000.00 $18.50 $1,850.00' $21.73 $2,173.00 NB $0.00 562-S American made MANUFACTURER BID i Tyler T Ier EJIW Total-Valve Boxes $7,200.00 $6,121.00 $7,001.20 _ $0.0011 FIRE HYDRANT EXTENSIONS �- 126 8 12"fire hydrant extensions for B84 American Flo Control NIB $174.25 $ $1,400.00i $155.00 $1,240.00 fire hydrant,no substitutes 127 4 18"fire hydrant extensions for B84 American Flo Control N/B $198.95 $795.80 $197.00 $788.00 $177.00 $708.00 fire hydrant,no substitutes 128 2 24"fire hydrant extensions for B84 American Flo Control N/B $224.35 $448.70 $222.00 $444.00 $199.00 $398.00,11 fire hydrant,no substitutes MANUFACTURER BID: American..Flo Control American Flo Control H Brant Re air Parts*** Total-Fire Hydrant Extensions $000 $2 638.50- $2 632 00 $2 346 00 CHECK VALVES 129 1 25 3/4"brass swing check valve with teflon seat,F.I.P.T. $25.30 $632.50 $21.40 $535.00 $27.00 $675.00 NB $0.00 130 50 1"brass check valve with teflon seat,F.I.P.T $30.80 $1,540.00 $29.50'' $1,475.00 $36.00 $1,800.00 NB $0.00 131 10 1-1/2"brass check valve with teflon seat,F.LP.T. $57.36 $573.60 $48.25 $482.50' $63.00 $630.00 N/B 132 10 2"brass check valve with teflon seat,F.I.P.T. $84.98 $849.80 $70.35 $703.50 $91.29 $912.90 NB $0.00'1 MANUFACTURER BID: Hammond/NIBW Hammond Hammond Total-Check Valves -$359590T $3,196.00 $4,017.90, $0.00 MECHANICAL JOINT RESTRAINER 133 150 6"mega lug mechanical joint restrainer series $25.39 $3,808.50 $24.80 $3,720.00 $26.74 $4,011.00 $21.47 $3,220.50 2000PV for PVC C900 class 150 pipe bolts i and gaskets packaged w/mega lug 134 140 8"mega lug mechanical joint restrainer series $34.77 $4,867.80 $34.10 $4,774.00 $36.77 $5,147.80 $29.911 $4,187.40 2000PV for PVC C900 class 150 pipe bolts and gaskets package w/mega lug 135 40 12"mega lug mechanical joint restrainer series $64.48 $2,579.20 $63.00 $2,520.00 $68.00 $2,720.00' $58.541 $2,341.601 2000PV for PVC C900 class 150 pipe;bolts r, and gaskets packaged w/mega lug 136 200 3/4"x l"cou ling union bronze NB $6.25 $1,250.00 ;$6.93 $1,386.00 NB $0.00 137 50 6"x 12"Sleeve Ductile Iron,M.J.,Amer.made $39.00, $1,950.00 $54.50 $2,725.00 $36.03 $1,801.50'NB $0.00 138 50 8"x 12"Sleeve Ductile Iron,M.J.,Amer.made $52.00 $2,600.00 $69.25 $3,462.50 $48.00 $2,400.00''N/B �_ $0,00'! MANUFACTURER BID: Ford T lei Ebba EbbalT lei Not Stated Total-Mechanical Joint Restrainer $15 805.50 $18 451.50 $17 466.30 $9 749.50 BID AMOUNT $425,674.29 $408,327.501 $424,914.88 $242617.02 Recommended'Award $65,961.19 S307,590.651 $17 466.30 1 112.00 *Denotes bid award to local vendor based on sales tax impact analysis. $6 **Denotes bid not awarded due to vendor bidding import items within the section,which is prohibited by the specifications requiring American made products only. ***Substitutes for specified product manufacturer not allowed. i 2 April 20,2004 Consider authorizing the City Manager to increase the Barscreen Area and Belt Press Conveyor Improvements Project amount for"extra work" i City of Beaumont Council Agenda Item TO: City Council FROM: Kyle Hayes, City Manager PREPARED BY: Joseph G. Majdalani, Water Utilities Manager MEETING DATE: April 20, 2004 AGENDA MEMO DATE: April 12, 2004 REQUESTED ACTION: Council approval of a resolution authorizing the City Manager to increase the Barscreen Area and Belt Press Conveyor Improvements Project amount for "extra work." RECOMMENDATION Administration recommends approval of increasing the Barscreen Area and Belt Press Conveyor Improvements Project amount by$163,626 to restore the structural integrity of 1500 square feet of walls and ceiling surface area inside the wet well of the main pump station at the Wastewater Treatment Plant by installing 4-inch thick repair mortar and reinforcement, to install 80 mils of protective coating to the restored surface area, and to provide diversion pumping during construction. BACKGROUND The interior walls and ceiling of the existing suction well at the Wastewater Treatment Plant built in the early 1950s have deteriorated and require major rehabilitation. The primary goals of the project are to restore the structural integrity of the wet well, stop the deterioration of its walls and ceiling, and prolong its life, in order to provide customers with uninterrupted and adequate service. BUDGETARY IMPACT Funds for the project are available in the Capital Improvement Funds. PREVIOUS ACTION Resolution 03-172 in the amount of 833,786 was passed by City Council on August 19, 2003. SUBSEQUENT ACTION None. RECOMMENDED BY City Manager, Public Works Director, and Water Utilities Manager. W UAllcoChanOrdBarScreen.wpd April 12, 2004 i APPROVAL Ole CONTRACT CHANGE Change Order No. 1 Date:April 12,2004 Project: City of Beaumont Barscreen Area and Belt Press Conveyor Improvements Owner: City of Beaumont 11.0.Box 3827 Beaumont,Texas 77704 Contractor: Allco, Inc. P.O.Box 3684 Beaumont,Texas 77704 To tite Owner: Approval of the following contract change is requested. Reason for Change:To increase the contract amount for"extra work"performed by the Contractor to restore the structural integrity of 1500 square feet of walls and ceiling surface area inside the wet well of the main pump station at the Wastewater Treatment Plant,to install 80 mils of protective coatingto therestored surface area,and to provide diversion pumping during construction. ORIGINAL CONTRACT AMOUNT $833,786. THIS CHANGE ORDER: Description Net Change Restore 4-inch of the walls and ceiling interior surface area of the suction well at the Wastewater Treatment Plant with repair mortar. + 97,800. Install 80 mils of protective coating over the restored surface area. + 28.500. Provide diversion pumping during construction. + 37,326. TOTAL AMOUNT OF THIS CHANGE ORDER: $163,626. TOTAL REVISED CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER: $997,412. CONDITION OF ChIANGE: "Contractor acknowledges and agrees that the adjustments in contract price and contract time stipulated inthis Change Order represents fitll compensation for all increases and decreases in the cost of,and the time required to perform the entire work under Contract arising directly or indirectly from this Change Order and all previous Change Orders. Acceptance of this waver constitutes an agreement between Owner and Contractor that the Change Order represents an all inclusive,mutually agreed upon adjustment to the Contract,and that Contractor will waive all rights to file a claiut on this Change Order after it is properly executed." Recommended By: Approved,By: Accepted By: Jo el;h(;. Rlajdalani, P.G. City of Beaumont Allco Inc. Water Utilities Manager Owner Contractor Date: _ Date: 13 O i C �y o l-I eaurno n REGULAR MEETING OF THE CITY COUNCIL COUNCIL CHAMBERS BERS AIPRIL 20, 2004 1030 P.M. CONSENT AGENDA Approval of minutes Confirmation of committee appointments A) Approve a contract for the purchase of automotive batteries for use by the Fleet Management Division B) Approve a resolution accepting maintenance of the water and sanitary sewer improvements in Calder Addition subdivision i A ...... City of Beaumont Council Agenda Item TO: City Council FROM: Kyle Hayes, City Manager PREPARED BY: Kirby Richard, Central Services Director MEETING DATE: April 20, 2004 AGENDA MEMO DATE: April 7, 2004 REQUESTED ACTION: Council approval of a contract for the purchase of automotive batteries. RECOMMENDATION Administration recommends award of a one (1) year contract for purchasing automotive batteries to Battery Warehouse of Orange at the unit costs stated below with an estimated total annual expenditure of$20,783.10. BACKGROUND Bids were requested for a one (1)year contract for purchasing automotive batteries for use by the Fleet Management Division to maintain city-owned vehicles and equipment. The specifications require fixed pricing for the most commonly used battery types, and a percentage discount off list price for other batteries as needed during the contract period. Nine (9)vendors were notified with three(3) responding with bids as reflected in the attached bid tabulation. The product line quoted by Battery Warehouse has been reviewed by Fleet Management and meets specifications set forth in the bid. The sales tax impact analysis formula has been applied to the local vendors' bids, but did not alter the bid standings. BUDGETARY IMPACT Funds are available for this expenditure in the Fleet Management Division's operating budget. PREVIOUS ACTION None. i One(1)Year Contract for Automotive Batteries April 7, 2004 Page 2 SUBSEQUENT ACTION None. RECOMM ENDED BY City Manager and Central Services Director. i ANNUAL CONTRACT FOR AUTOMOTIVE BATTERIES BID OPENING DATE: THURSDAY,APRIL 1,2004 BID NUMBER: RF0304-25 Name of Vendor Battery Warehouse-Orange Interstate Batteries NAPA Auto Parts Address 1111 16th Street 6008 College St. 3266 College St. City/State Orange,Texas Beaumont,Texas Beaumont,Texas Contact Name Whit Baker Joseph Kingsbury Jerry Roberts Phone Number (800)409-3545 (409)860-4200 (409)833-8900 Brand Bid G.E.S.Alliance Johnson Controls/Enertec NAPA Discount Offered Off List Price 35% 40% 30% App. Qty. Battery Type/BCI# Unit Cost Extended Cost Unit Cost Extended Cost Unit Cost Extended Cost 180 78U-7(34/78) $38.95 $7,011.00' $41.97 $7,554.60 $39.96 $7,192.80 132 31S $38.95 $5,141.40 $38.47 $5,078.04 $49.24 $6,499.68 ~ 115 65 $38.95 $4,479.25 $36.85 $4,237.75 $40.99 $4,713.85 18 4D $69.95 $1,259.10 $66.47 $1,196.46 $87.49 $1,574.82 12 58 $31.95 $383.40 $39.95 $479.40 $38.72 $464.64 14 75 $31.95 $447.30 $31.26 $437.64 $34.22 $479.08 14 8D $79.95 $1,119.30' $75.$1,057.98 $97.43 $1,364.02 16 U1(SP40) $24.95 $399.20 $35.77 $572.32 $: 3.24 $371.84 17 58R $31.95 $543.15' $31.47 $534.99 _ $38.721 $658.24 Total Bid Amount $2078 .10' $21,149.181 $23,318.97 i B City of Beaumont Council Agenda Item TO: City Council FROM: Kyle Hayes, City Manager PREPARED BY: Joris P. Colbert, City Engineer MEETING DATE: April 20, 2004 AGENDA MEMO DATE: April 6, 2004 REQUESTED ACTION: Council consider a resolution accepting maintenance of the water and sanitary sewer improvements in Calder Addition subdivision. RECOMMENDATION Administration recommends approval of the water and sanitary improvements for Lots 1 - 10, Block 43 in the Calder Addition subdivision. BACKGROUND The aforementioned improvements in the subdivision passed final inspection from the Water Utilities Division on April 6, 2004. BUDGETARY IMPACT None. PREVIOUS ACTION None. SUBSEQUENT ACTION None. RECOMMENDED BY City Manager, Public Works Director and City Engineer. EngAgenCalderAddsk.wpd April 6,2004 i \ 2., 5„ Y iG 3 i R E ' i EE -- LOCATION ` " Por ROA W --- _� Por 5�„ Ec 5 - • t}��' o f Po k �� K RU • • ,��:' HUSK 0 T Pork_, - • '• Q c 54 ' IAP FIR .T 0 GRUCKE i _VICINITY MAP E° N.T.S. r � C CALDER ADDITION SUBDIVISION i APPROVAL OF CONTRACT CHANGE Change Order No. 1 Date: April 12, 2004 Project: City of Beaumont Barscreen Area and Belt Press Conveyor Improvements Owner: City of Beaumont P.O. Box 3827 Beaumont, Texas 77704 Contractor: Allco, Inc. P.O. Box 3684 Beaumont, Texas 77704 To the Owner: Approval of the following contract change is requested. Reason for Change: To increase the contract amount for "extra work"performed by the Contractor to restore the structural integrity of 1500 square feet of walls and ceiling surface area inside the wet well of the main pump station at the Wastewater Treatment Plant,to install 80 mils of protective coatingto the restored surface area,and to provide diversion pumping during construction. ORIGINAL CONTRACT AMOUNT $ 833.786. THIS CHANGE ORDER: Description Net Change Restore 4-inch of the walls and ceiling interior surface area of the suction well at the Wastewater Treatment Plant with repair mortar. +$ 97,800. Install 80 mils of protective coating over the restored surface area. + 28.500. Provide diversion pumping during construction. + 37,326. TOTAL AMOUNT OF THIS CHANGE ORDER: $ 163,626. TOTAL REVISED CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER: $ 997,412. CONDITION OF CHANGE: "Contractor acknowledges and agrees that the adjustments in contract price and contract time stipulated in this Change Order represents full compensation for all increases and decreases in the cost of,and the time required to perform the entire work under Contract arising directly or indirectly from this Change Order and all previous Change Orders. Acceptance of this waver constitutes an agreement between Owner and Contractor that the Change Order represents an all inclusive, mutually agreed upon adjustment to the Contract, and that Contractor will waive all rights to file a claim on this Change Order after it is properly executed." Recommended By: Approved By: Accepted By: Jo e151� G. IVlajdalani, P.1;. City of Beauirront Allco, Inc. Water Utilities Manager Owner Contractor Date: �' ��( late: J Date: /3 D