Loading...
HomeMy WebLinkAboutRES 95-313 RESOLUTION NO. ' - J L3 WHEREAS, Mustang Engineering, Inc. has requested, on behalf of their client, Centana Intrastate Pipeline Company, the City grant a five foot wide permanent pipeline easement and a fifty-five foot wide temporary construction easement, out of Blocks 22, 26 and 27 of the Heflebower and Scott Subdivision, as described on Exhibit "A" attached hereto, for the transportation of natural gas; and, WHEREAS, Centana has offered to pay the City $200.00 per rod (16.5 feet = a rod) x 87.52 rods for a total of $17,504.00 for the easement and the temporary construction easement; and, WHEREAS, the City Council has considered the execution of said pipeline easement and is of the opinion that said pipeline easement is necessary and desirable and that same should be accepted; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be and he is hereby authorized to execute pipeline easements as described above to Centana Intrastate Pipeline Company, for consideration of $17,504.00. PASSED BY THE CITY COUNCIL of the City of Beaumont this theme/. day Of � �E , 1995. - Mayor - . SUBJECT PROPOSED FIVE FOOT PIPELINE EASEMENT SP AND 1 zee <i FIFTY—FIVE FOOT ED S-RA" TEMPORARY CONSTRUCTION BW EASEMENT OUT OF — BLOCKS 22, 26 AND 27 CANq FpNNEZj 124 I '. HEFLEBOWER AND SCOTT SUBDIVISION Cr,Y ' LEGEND I Serge ieeat—t PROPOSED PIPELINE °'a,t EASEMENT - f TEMPORARY CONSTRUCTION EASEMENT LOCATION MAP N.T.S. - i 5' PROPOSED _ PIPIELINE j 0 — — EASEMENT j — ?o j - - - - - - - - Q \� TEMPORARY N.T.S. C❑NSTRUCTI❑N \� EASEMENT j TEMP❑RARY C❑NSjTRUCTI❑N EASEMENT 27.5' `/V - - - - - ~27.5, EXHIBIT "A" _AI N,S7