Loading...
HomeMy WebLinkAboutRES 95-309 RESOLUTION NO. L �r WHEREAS, construction of water, sanitary sewer, storm sewer and street improvements constructed in Pine Glen Second Addition, Phase Two was made by the Engineering Division and the Water Utilities Department as follows: Street and Storm Sewer Improvements: • Jill Lane from existing Phyllis Lane approximately 252 feet west to proposed Alece Lane. • Joyce Lane from existing Phyllis Lane approximately 300 feet west to and including the cul-de-sac on proposed Alece Lane. • Alece Lane from existing Tolivar Road approximately 1,057 feet south to and including the cul-de-sac on proposed Joyce Lane. Water and Sanitary Improvements: • Lots 6-9, 15-28, 27-51 WHEREAS, the developers of said addition desire to have these improvements accepted and maintained by the City; and, WHEREAS, the director of Public Works recommends that said improvements meet city standards and qualify for acceptance for permanent maintenance, and the City Council is of the opinion that said improvements should be accepted and maintained by the City of Beaumont; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the water, sanitary sewer, storm sewer and street improvements in Pine Glen Second Addition, Phase Two as described above, are hereby accepted by the City of Beaumont and shall be continuously maintained by the City contingent upon filing of the final plat, complete with filings of dedication of all rights-of-way, and easements required on preliminary and final plats. PASSED BY THE CITY COUNCIL of the City of Beaumont on this the day of , 1995. - Mayor -