Loading...
HomeMy WebLinkAboutRES 95-284 RESOLUTION WHEREAS, construction of the water, sanitary sewer, storm sewer and street improvements constructed in Ashton, Phase 2, with the exception of streetlights, was found to be complete by the Engineering Division and the Water Utilities Department as follows: Street and Storm Sewer Improvements • Brewton Circle from existing Regina Lane approximately 549 feet north to and including cul-de-sac; • Savannah Trace from existing Regina Lane approximately 197 feet north to 3-OM- 4P markers; • Chatom Trace from proposed Savannah Trace approximately 421 feet east to and including the cul-de-sac; Water and Sanitary Improvements • Lots 1-14, Block 1; • Lots 1-9, Block 2; WHEREAS, the developers of said addition desire to have these improvements accepted and maintained by the City; and, WHEREAS, the directors of Public Works and Water Utilities have determined that said improvements meet city standards and qualify for acceptance for permanent maintenance, and the City Council is of the opinion that said improvements should be accepted and maintained by the City of Beaumont; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the water, sanitary sewer, storm sewer and street improvements in Ashton, Phase 2, with the exception of streetlights, are hereby accepted by the City of Beaumont and shall be continuously maintained by the City contingent upon filing of the final plat, complete with filings of dedication of all rights-of-way and easements required on the preliminary and final plats and installation of the streetlights. PASSED BY THE CITY COUNCIL of the City of Beaumont on this the ' day of , 1995. - Mayor - 2