Loading...
HomeMy WebLinkAboutRES 95-221 a RESOLUTION NO. WHEREAS, on March 21, 1995, City Council awarded a contract to Excavators and Constructors, Inc. for the construction of the Liberty/Laurel (Phase II) Project in the amount of$5,541,628.82; and, WHEREAS, Change Order No. 1 is being requested to compensate the Contractor for additional work due to changes in the scope of the work as follows: 1. Replacement of a 10" sanitary sewer main on Oxford Street. Identification of an existing line conflicted with proposed construction, requiring installation of a new line to maintain service. 2. Elimination of proposed 12"water main on Laurel between Fourth Street and Third Street. Existing 12" water main determined to be in acceptable condition. 3. Installation of a 15" storm sewer line on Fifth Street. Existing line that was proposed for use, had collapsed. Installation of this line also necessitated overlay of a portion of the street. 4. Replacement of an 18" storm sewer line on Sixth Street. Existing line that was proposed for use, had collapsed. 5. Removal and replacement of approximately 51 feet of concrete paving on Ewing Street. This portion of street had deteriorated to an unacceptable condition. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be and he is hereby authorized to execute Change Order No. 1, as stated above, with Excavators and Constructors, Inc. in the amount of$42,391.60. PASSED BY THE CITY COUNCIL of the City of Beaumont this the e*day of 1995. - Mayor -