Loading...
HomeMy WebLinkAboutRES 93-207 93--07 RESOLUTION WHEREAS, construction of the water, sanitary sewer, storm sewer and street improvements constructed in Gladys West, Section II, was found to be complete by the Engineering Division and the Water Utilities Department as follows: Street and Storm Sewer Improvements • Wildflower Drive from the existing pavement on Bluebonnet Street approximately 472 feet south to and including the temporary cul-de-sac; • Buttercup Drive from the pavement on Wildflower Drive approximately 630 feet west to and including the temporary cul-de-sac; Water and Sanitary_Improvements • Lots 3 through 7, Block 3; • Lots 17 through 26, Block 4; • Lots 1 through 9, Block 6; and WHEREAS, the developers of said addition desire to have these improvements accepted and maintained by the City; and, WHEREAS, the directors of the Public Works and Public Utilities recommend that said improvements meet city standards and qualify for acceptance for permanent maintenance, and the City Council is of the opinion that said improvements should be accepted and maintained by the City of Beaumont; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the water, sanitary sewer, storm sewer and street improvements in Gladys West, Section II, as described above, are hereby accepted by the City of Beaumont and shall be continuously maintained by the City contingent upon filing of the final plat, complete with filings of dedication of all rights-of-way and easements required on the preliminary and final plats and installation of the streetlights. PASSED BY THE CITY COUNCIL of the City of Beaumont on this the �V day of - 1993. - Mayor - - 2 -