Loading...
HomeMy WebLinkAboutRES 93-133 13-3 RESOLUTION WHEREAS, on Monday, May 24, 1993, sealed bids were received to erect a 56' x 62' concrete foundation with all rough-in plumbing and water piping at the Fire Training Grounds located at 600 Marina Drive; and, WHEREAS, Dabar General Contractors submitted a bid in the amount of $12,183.00; and, WHEREAS, City Council is of the opinion that the bid submitted by Dabar General Contractors is the lowest and the best bid meeting specifications and should be accepted; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the bid submitted by Dabar General Contractors to erect a 56' x 62' concrete foundation with all rough-in plumbing and water piping at the Fire Training Grounds located at 600 Marina Drive in the amount of $12,183.00 be accepted by the City of Beaumont. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 14.;t - day of �x.e , 1993. '=�Vlayor -