HomeMy WebLinkAboutRES 93-031 RESOLUTION
WHEREAS, construction of the water, sanitary sewer, storm sewer
and street improvements in Ashton Subdivision have been completed as
follows:
Street and Storm Sewer Improvements:
• Regina Lane from the existing pavement approximately 610
feet west, turning south for a distance of approximately 380
feet to and including the cul-de-sac.
• Savannah Trace from Regina Lane approximately 428 feet south to
and including the cul-de-sac.
Water and Sanitary Sewer Improvements:
• Lots 1 - 12, Block 1
• Lots 1 - 12, Block 2
and,
WHEREAS, the developers of said addition desire to have these
improvements accepted and maintained by the City; and,
WHEREAS, the director of the Public Works and Engineering
Department recommends that said improvements meet city standards and
qualify for acceptance for permanent maintenance, and the City Council is of
the opinion that said improvements should be accepted and maintained by the
City of Beaumont;
�� ` - �A
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the water, sanitary sewer, storm sewer and street improvements of
Ashton Subdivision, as described above, are hereby accepted by the City of
Beaumont and shall be continuously maintained by the City contingent upon
filing of the final plat, complete with filings of dedication of all rights-of-way
and easements required on the preliminary and final plats and installation of
streetlights.
PASSED BY THE CITY COUNCIL of the City of Beaumont this
the % day of 11993.
- Mayor -