HomeMy WebLinkAboutRES 92-241 RESOLUTION
BE IT RESOLVED BY THE CITY COUN :IL OF THE
CITY OF BEAUMOi�`-
THAT a five-year Capital Program for Fiscal Year 1993 through Fiscal Year 1997,
attached as Exhibit "A", be, and it is hereby adopted.
PASSED BY THE CITY COUNCIL of the City of Beaumont on this the Z9
day of 1992.
- Mayor -
CITY OF BEAUMONT, TEXAS
CAPITAL IMPROVEMENT PROGRAM
1993 - 1997
■
r..
0
C,
"Beautpont
yf
June 12, 1992
To: Mayor and Council
Subject: Capital Improvement Program - Fiscal Years 1993-1997
The City Charter requires the presentation of a five-year Capital Improvement Program annually
for consideration by the City Council. This program, commonly referred to as the CIP is to
include a general summary and a list of all improvements,accompanied by corresponding project
necessity statements, costs estimates, and anticipated timetables. The attached document
represents the proposed program for fiscal years 1993-1997.
The plan encompasses a five-year period with emphasis placed on the column labeled"FY 1993".
These projects will require funding as part of the City's annual budget process. In the column
labeled "current", the document recaps projects that are funded but have not been substantially
completed. Projects labeled "planned"are included in the program to focus staff planning efforts
and are subject to review and modification in the future.
It is necessary for the Council to adopt a Capital Improvement Program with the annual budget
on or before the 27th of September. This action will provide a five-year plan and designate
specific project allocations. Expenditure authorizations and funding mechanisms will occur
during the annual budget process and throughout the fiscal year as contracts are awarded.
The preparation and review of the five-year capital program is an excellent tool for assessing the
City's financial needs related to the development and continuing maintenance of the valuable
infrastructure of our community. Revisions and amendments may be incorporated into the plan
as desired by the Council.
Respectfully Submitted,
r
Ray A Riley
City Manager
RAR:ct
P. ®. Box 3827 Beaumont, Texas 77704
1993 - 1997 CAPITAL IMPROVEMENT PROGRAM
TABLE OF CONTENTS
I. 1993-1997 Capital Improvement Program Highlights 1
II. Financial Summary of the Five Year Program 5
III. Public Works Capital improvement Program
Street Improvements 7
Stormwater Drainage Improvements 21
IV. General Capital Improvement Program 39
Parks & Recreation 41
Municipal Facilities 51
Public Safety 57
PROPOSED 1993-1997 CAPITAL IMPROVEMENT PROGRAM
OVERVIEW OF CAPITAL IMPROVEMENT PLANNING
Local officials, on behalf of citizens, take on the important responsibility of ensuring that buildings,
streets, parks, and water systems are maintained and improved for their community and future use.
Sound planning and fiscal commitment can ensure that major replacement costs are avoided and that
the infrastructure quality remains suitable to support business and private investment in the
community. A common mechanism used by local officials to manage this responsibility is the Capital
Improvement Program (CIP), a plan for short- and long-range physical development.
One benefit of the Capital Improvement Program is that it allows for project evaluation at a
comprehensive level. It also provides the financial information necessary to carefully plan and
anticipate changes in tax structure, user fees, and bonded indebtedness.
The CIP process allows annual program updates to incorporate changing community priorities and
financing strategies, which require careful consideration. An important determination is whether a
particular project will enhance the viability of the economic base and provide quality-of-life amenities
for its citizens.
SUMMARY OF PROPOSED 1993-1997 CAPITAL IMPROVEMENT PROGRAM
The proposed 1993-1997 Capital Improvement Program for the City of Beaumont totals $62,211,000.
This program is limited to General Improvements, Public Works & Public Safety. The Utility system
(water and sanitary sewer) improvements are to be presented in a separate document.
A total of $25,262,000 or 4" of the five-year program is comprised of projects that have necessary
fink,.-ial resources 6, ' n additional $22,552,000 or 36% is proposed to be funded primarily
with proceeds from debt issuance. Grants and contributions total $14,397,000 or 23% of the program.
Program Highlights
A large portion of the five-year plan focuses on
the completion of projects authorized in the
1982 Transportation Improvement Program
and those approved in the 1983 General
Comprehensive Drainage Program. Large 16%
scale street improvements total $27,957,000 or
45% of the five year total. Drainage
improvement projects total $24,073,000 or 39%
of the five year total. Also included is
$10,181,000 or 16% for improvements related
to renovation or expansion of municipal Streets
facilities including parks and buildings. 45%
Drainage
The recommended program for FY 1993 is 39%
$13,721,000 or 22% of the five year total.
Coupled with an additional $8,731,000 of
projects currently underway, 36% of the five
year program will become an immediate
priority. The major funding source for FY 1993
projects will be the proceeds from the 1992 general obligation bond issue.
1
General Improvements
Proposed projects for 1993 include $260,000 in park and recreational facility improvements and
$985,000 for improvements to municipal buildings, airport and public safety facilities. Program
highlights include road and parking improvements at the Best Years Center and the Athletic Complex.
Municipal building improvements include rehabilitation of the telescopic seating sections at the Civic
Center as well as major air conditioning replacements at the Police Station and the Julie Rogers
Theatre. Several Federal grants are anticipated to fund a significant portion of the General
Improvement Program.
Street Improvements
Major projects totaling $3,467,000 are currently underway in the Street Improvement Program.
Projects include the reconstruction of College from 4th Street to Main and the West Lucas widening.
In addition to these projects, funds are available to purchase and install a new traffic control system,
and to repair the Phelan Boulevard Bridge. All funds required for these improvements are in hand.
The 1993 street program includes the Major Drive widening project. Funds for this project are to be
obtained from the Federal grants.
Drainage Improvements
The 1993 proposed Drainage Improvement Program will provide for the construction of $8,536,000 of
projects. Many of the critical areas identified to receive drainage relief will be under construction. A
few of the areas included in the 1993 plan are the Cartwright-Terrell Street Phases and the High
School Ditch. Funds necessary to construct these projects have been secured from the issuance of
1992 drainage bonds.
Financial Impact
As previously stated, $22,552,000 of the five year program requires additional revenue funded
primarily from the issuance of $17,500,000 in certificates of obligation. The remaining $5,052,000 is
comprised of transfers from the General Fund and Fire Training Grounds Fund.
With the authorization of $17,500,000 in certificates of obligation, $12,000,000 would be allocated for
drainage improvements and $5,500,000 would be allocated for street projects. A debt service funding
plan is presented as follows.
{AII r.. ..1:
•>:tt
kk t•
Fiscal Additional Cumulative
Year Debt Issue Tax Needs Tax for Debt
1992 $13,300,000 $0.24
1993 $0.03 0.27
1994 17,500,000 0.27
1995 0.03 0.30
1996 0.30
1997 0.03 0.33
2
The City's debt is currently serviced by approximately $0.24 of the $0.59 property tax rate and is
projected to increase three cents in 1993 to $0.27 in order to fully provide for the debt service on the
1992 Public Improvement Bonds. It is proposed that all new debt be serviced from the levying of new
property tax in the amount necessary to offset the annual requirements. In order to proceed with the
capital improvement projects contained in this plan, an additional $17,500,000 in certificates of
obligation is expected to be issued in the latter portion of rY 1994 for street and drainage
improvements. An additional $0.06 of property tax will be required to service the debt. It is proposed
that the tax increase be phased in over a three year period, with a $0.03 increase anticipated for FY
1995 and another $0.03 increase required for FY 1997.
3
THIS PAGE LEFT BLANK INTENTIONALLY
i
CAPITAL IMPROVEMENT PROGRAM SUMMARY
1993 — 1997
Current 1993 Planned Total Future
Programs
Public Works
Street Improvements 3,467,000 3,940,000 20,550,000 27,957,000 22,750,000
Stormwater Drainage Improvements 3,439,000 8,536,000 12,098,000 24,073,000 40,845,000
General Improvements
Parks and Recreation 1,190,000 260,000 4,470,000 5,920,000 --
Municipal Facilities 635,000 985,000 2,641,000 4,261,000 2,550,000
Total Program Costs 8,731,000 13,721,000 39,759,000 62,211,000 66,145,000
Source of Funds
Available Funds 2,375,000 1,439,000 8,148,000 11,962,000 --
Grants&Contributions 917,000 3,218,000 10,262,000 14,397,000 --
Bonds/Certificates of Obligation 5,439,000 7,861,000 17,500,000 30,800,000 --
Future Revenue Required -- 1,203,000 3,849,000 5,052,000 66,145,000
Total Source of Funds 8,731,000 13,721,000 39,759,000 62,211,000 66,145,000
5
THIS PAGE LEFT BLANK INTENTIONALLY
PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
STREET IMPROVEMENTS
Current FY 1993 Planned Total Future
Project
Crockett Plaza 171,000 —— —— 171,000 ——
Traffic Control System 458,000 —— —— 458,000 ——
College St. 2,188,000 —— —— 2,188,000 ——
Spur 380 ROW 150,000 —— —— 150,000 —W. Lucas (Delaware to Folsom) 50,000 —— —— 50,000 —W. Lucas (Phelan to Delaware) 100,000 —— —— 100,000 ——
West Lucas —— —— 7,050,000 7,050,000 ——
Major Drive 100,000 -- — 100,000 --
Major Drive —— 3,200,000 —— 3,200,000 ——
Traffic Signal Installations -- 340,000 -- 340,000 --
Caldwood Street 250,000 300,000 —— 550,000 ——
Liberty—Laurelll -- -- 3,700,000 3,700,000 —
—
Liberty—Laurelll) -- -- 8,300,000 8,300,000 --
School Route Sidewalks —— —— —— —— 600,000
Washington Blvd. —— —— —— —— 2,500,000
Twenty—Third St. Overpass —— —— —— —— 2,500,000
Concord Widening -- -- -- -- 7,000,000
Folsom Road Widening —— —— —— —— 1,500,000
Calder Avenue Widening —— —— —— —— 800,000
Delaware Extension —— —— —— —— 3,350,000
Dowlen Road —— —— —— —— 4,000,000
Laurel Avenue Widening -- -- -- -- 500,000
Bridge Replacement -- 100,000 -- 100,000 --
11 th Street —— —— 1,500,000 1,500,000 ——
Total Street Improvements 3,467,000 3,940,000 20,550.000 27,957,000 22,750,000
Source of Funds
Available Funds 1,259,000 740,000 8,050,000 10,049,000 ——
Grants&Contributions 208,000 3,200,000 7,000,000 10,408,000 --
Bonds 2,000,000 —— 5,500,000 7,500,000 ——
Future Revenue Required —— —— —— —— 22,750,000
Total Source of Funds 3,467,000 3,940,000 20,550,000 27,957,000 22,750,000
7
THIS PAGE LEFT BLANK INTENTIONALLY
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
Crockett Plaza Public Works
PROJECT DESCRIPTION
Landscape and build concrete parking lot to benefit the Stedman and Stedman 11 Downtown Economic Revitalization''
Projects.
'i.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
,Engineering
Construction 171,000 171,000
Other
TOTAL COSTS 171,0001 -- -- 171,0001 --
SOURCE OF FUNDS
Available Funds 171,000 171,000
Grants &Contributions
Bonds — 1992
Bonds — 1994
Future Revenue Required
TOTAL FUNDS 171,0001 -- -- 171,0001 --
PROJECT TITLE DEPARTMENT PROJECT NO.
Traffic Control System rublic Works
PROJECT DESCRIPTION
Replacement of downtown traffic computer and 40 intersection controllers and cabinets.
I
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 458,000 458 000
Other
TOTAL COSTS 4.58,0001 458,0001
SOURCE OF FUNDS
Available Funds 250,000 250,000
Grants&Contributions 208,000 208,000
Bonds — 1992
Bonds — 1994
Future Revenue Required
TOTAL FUNDS 458,0001 __ __ 1 458.0001
* * * CITY OF BEAUMONT, TEXAS
9
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
College St, Public Works
PROJECT DESCRIPTION
Reconstruction and widening of College to provide left turn lanes and wider through lanes between Fourth and Main
Streets. The project also provides for the construction of the Wall Street Connector
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land Engineering --
Construction 2,188,000 2,188,000
Other
TOTAL COSTS 2,188,000 —— —— 2,188,000 ,
——
SOURCE OF FUNDS
Available Funds 188,000 188,000
Grants&Contributions
Bonds — 1992 2,000,000 2,000,000
Bonds — 1994 --
Future Revenue Re uired TOTAL FUNDS 2,188,000 -- -- 2,188,0001
—
PROJECT TITLE DEPARTMENT PROJECT NO.
Spur 380 ROW Public Works
PROJECT DESCRIPTION
Legal costs to acquire property.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 150,000 150,000
Other
TOTAL COSTS 150,0001 —— —— 150 000 ——
SOURCE OF FUNDS
Available Funds 150,000 150,000
Grants&Contributions
Bonds — 1992
Bonds — 1994
Future Revenue Required __
TOTAL FUNDS 150,000" —— —— 150,0001 ——
* * *-CITY OF BEAUMONT, TEXAS
10
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
W. Lucas (Delaware to Folsom) Public Works Public Works
PROJECT DESCRIPTION
I Development of a roadway section from Laurel Avenue to Folsom Drive,with left turn lanes at major intersections.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering __
Construction 50,000 50,000
Other __
TOTAL COSTS 50000 -- -- 50000 --
SOURCE OF FUNDS
Funds Available 50,000 50,000
Grants&Contributions
Bonds — 1992
Bonds — 1994
Future Revenue Required --
TOTAL FUNDS 50,000 , -- -- 50,0001 --
PROJECT TITLE DEPARTMENT t.0jECT NO.
W. Lucas (Phelan to Delaware) Public Works
PROJECT DESCRIPTION
Development of a roadway section from Laurel Avenue to Folsom Drive,with left turn lanes at major intersections.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering __
Construction 100,000 100,000
Other
TOTAL COSTS 100,0001 1 100,0001 --
SOURCE OF FUNDS
Available Funds 100,000 100 000
Grants&Contributions __
Bonds — 1992
Bonds — 1994
Future Revenue Required __
TOTAL FUNDS 100.0001 —— __ 1 100.0001
* * * CITY OF BEAUMONT, TEXAS
11
I
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
West Lucas Drive Public Works
PROJECT DESCRIPTION
Consists of widening Lucas into a four—lane roadway from Phelan to Folsom.
I
i
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 7,050,000 7,050,000
Other
TOTAL COSTS —— —— 7,050,0001 7,0570001
——
SOURCE OF FUNDS
Available Funds 850,000 850,000
Grants&Contributions 2,200,000 2,200,000
Bonds — 1992
Bonds — 1994 4,0000 4,000,000
Future Revenue Required
TOTAL FUNDS -- -- 7,050,000-7 7,050,0001
--
PROJECT TITLE DEPARTMENT PROJECT NO.
Major Drive Public Works
PROJECT DESCRIPTION
City—State effort to widen Major Drive from Phelan Boulevard to Dishman Road. City's share is to acquire the
right—of—way.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 100,000 100,000
Other
TOTAL COSTS 100,0001 —— -— 100-0001 ——
SOURCE OF FUNDS
Available Funds. 100,000 1100,000
Grants&Contributions
Bonds — 1992
Bonds — 1994
Future Revenue Required _
TOTAL FUNDS 100,0001 100,0001 —
* * * CITY OF BEAUMONT, TEXAS
12
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
Major Drive Public Works
PROJECT DESCRIPTION
Transforms Major Drive into a four lane facility from Highway 105 to Highway 124. The City provides the ROW to the
Texas Dept. of Transportation which is responsible for the construction.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL I FUTURE
Land
Engineering
Construction 3,200,000 3,200,000
Other
TOTAL COSTS -- 3,200 000 J 3-200,000
SOURCE OF FUNDS --
Available Funds
Grants& C ontributions 3,200,000 3,200,000
Bonds - 1992
Bonds_- 1994 -_-_
Future Revenue Required
TOTAL FUNDS -- 3,200,000 -- 1 3,200q000 1 --
PROJECT TITLE DEPARTMENT PROJECT NO.
Traffic Signal Installations Public Works
PROJECT DESCRIPTION
Expand signal system to include College,Washington and Fourth Street Phase I and II signal systems.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
En ineerin
Construction 340,000 340,000
Other
i
TOTAL COSTS -- 340,000 -- 340,0001 --
SOURCE OF FUNDS
Available Funds 340,000 340 000
Grants&Contributions
Bonds - 1992
-Bonds - 1994
Future Revenue Required
TOTAL FUNDS -- 340. -- 340,0001 --
* * * CITY OF BEAUMONT, TEXAS
13
i
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
Caldwood Street Public Works
PROJECT DESCRIPTION
This project will allow for the repair of streets between Laurel and Midford. These streets were destroyed during a
major Drainage Project.
i
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
I En ineerin
Construction 250,000 300,000 550,000
Other
TOTAL COSTS 250,0001 300,0001 000 ——
SOURCE OF FUNDS
Available Funds 250,000 300,000 550,000
Grants& Contributions
—Bonds — 1992
Bonds — 1994
Future Revenue Required
TOTAL FUNDS 250,0001 300,0001 -- 1 550,0001 --
PROJECT TITLE DEPARTMENT PROJECT NO.
Liberty Laurel II Public Works
PROJECT DESCRIPTION
Rehabilitation of the Liberty and Laurel Streets from Forrest Street to 11th Street.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 3,700,000 3,700,000
Other
TOTAL COSTS —— ——
SOURCE OF FUNDS 3 700 000 3,700,0001
——
Available Funds 3,700,000 3Grants&Contributions Bonds — 1992 Bonds — 1994 Future Revenue Re uired
TOTAL FUNDS -- -- 3,700,000 3,7004000
--
* * * i✓ITY OF BEAUMONT, TEXAS
14
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO. —�
Liberty—Laurel III Public Works
PROJECT DESCRIPTION
Extension of Liberty and Laurel Streets and includes a grade separation at HI-10 from 11th Street to Phelan
Boulevard
PROJECT COSTS CURRENT 1993 PLANNED TOTAL I FUTURE
Land
En ineerin
Construction 8,300,000 8,300,000
Other
TOTAL COSTS —— ——
SOURCE OF FUNDS 8,300,000 81300,000 ,
——
Available Funds 3,500,000 3,500,000
Grants&Contributions 4,800,000 4,800,000
Bonds — 1992
Bonds — 1994
Future Revenue Required
TOTAL FUNDS -- -- -1 8,300,0001 8 300 000 I --
PROJECT TITLE DEPARTMENT PROJECT NO.
School Route Sidewalks Public Works
PROJECT DESCRIPTION
Construct sidewalks on designated pedestrian school routes. This program would begin with major streets on
these routes. The program would then construct sidewalks on progressively lower volume streets.
Proposed sidewalks are 5 ft wide. Linear distance is 43,200 ft,at a cost of$25/square yard.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction —— 600,000
Other __
TOTAL COSTS —— —— —— —— 600 000
SOURCE OF FUNDS
Available Funds
Grants&Contributions
—Bonds — 1992
Bonds — 1994
Future Revenue Required -- 600,000
TOTAL FUNDS -- -- -- -- 600,000
* * * CITY OF BEAUMONT, TEXAS
15
i
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
Washington Boulevard Public Works
i
PROJECT DESCRIPTION
The reconstruction of Washington Boulevard into a four—lane arterial from Langham Road to Major Drive.
I
I
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction -- 2,500,000
Other --- __
TOTAL COSTS 000
SOURCE OF FUNDS
Available Funds
Grants& Contributions
-Bonds — 1992
-Bonds — 1994 __ —
i Future Revenue Required -- 2,500,000 :1
TOTAL FUNDS -- -- -- -- 2,500,000
PROJECT TITLE DEPARTMENT PROJECT NO.
Twenty—Third Street Overpass&Widening of Public Works Public Works
,-Roadway
PROJECT DESCRIPTION
Construction of an overpass at the Southern Pacific Railroad tracks and the widening of Twenty—Third from Calder
to the SP railroad tracks.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction —— 2,500,000
Other
TOTAL COSTS -- -- -- -- 2 500 000
SOURCE OF FUNDS
Available Funds
Grants&Contributions
Bonds — 1992
Bonds — 1994
Future Revenue Required -- 2,500,000
TOTAL FUNDS __ __ -- 2500000
* * *.CITY OF BEAUMONT, TEXAS
16
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
Concord Road Widening Public Works
PROJECT DESCRIPTION
The widening of Concord Road to a four—lane concrete roadway from Interstate 10 to Lucas Drive.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction ——Other 7,000,000
__
TOTAL COSTS —— —— —— 7-000,000
SOURCE OF FUNDS
Available Funds
Grants& Contributions
Bonds — 1992
Bonds — 1994
Future Revenue Required -- 7,000 000 '
TOTAL FUNDS -- -- -- -- 7,000,060—,
PROJECT TITLE DEPARTMENT PROJECT NO.
Folsom Road Widening Public Works
PROJECT DESCRIPTION
Consists of the widening of Folsom into a four—lane facility from Crow Road
to Dowlen Road.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction —— 1,500,000
Other
TOTAL COSTS -- -- -- -- 1,500,000
SOURCE OF FUNDS
Available Funds
Grants&Contributions
Bonds — 1992
Bonds — 1994
Future Revenue Required __ 1,500,000
TOTAL FUNDS 1 1,500,000
* * * CITY OF BEAUMONT, TEXAS
17
i
CAPITAL IMPROVEMENT PROGRAM
[PROJECT TITLE DEPARTMENT PROJECT NO.
lder Avenue Widening Public Works
PROJECT DESCRIPTION --' ---
Widen Calder into a four-lane roadway from Lucas to Phelan. This project will relieve traffic congestion occurring
on Phelan.
i'
r
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
En ineerin ---
Construction
Other -- 800,000
_j_
TOTAL COSTS -- -- -- _ 800 OOfl
SOURCE OF FUNDS
Available Funds
Grants& Contributions _
Bonds - 1992 __-
Bonds - 1994
Future Revenue Required
TOTAL FUNDS __ -- 800 000
-- -- --
800 000
PROJECT TITLE DEPARTMENT
Delaware Street Extension PROJECT NO.
Public Works
PROJECT DESCRIPTION
The extension of Delaware Street from Dowlen to Major Drive as a four lane
arterial would be provided to relieve Gladys Avenue.
PROJECT COSTS ZRENT 1993 PLANNED TOTAL FUTURE
Land
En ineerin --
Construction --
Other -- 3,350,000
TOTAL COSTS -
SOURCE OF FUNDS -- -- 3,350,000
Available Funds
Grants&Contributions
Bonds - 1992 --
Bonds - 1994 --
Future Revenue Re uired --
TOTAL FUNDS 3 350 000
-- -- -- --
3,350 000
* * * CITY OF BEAUMONT, TEXAS
18
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT
Dowlen Road Extension Public Works
PROJECT DESCRIPTION
The extension of Dowlen from College Street to Walden Road. An additional north—south corridor would be
provided for this area of the city.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL I FUTURE
Land Engineering --
Construction -- 4,000,000
Other ——
TOTAL COSTS —— —— —— —— 4,000,000
SOURCE OF FUNDS
Available Funds --
Grants&Contributions --
Bonds — 1992
Bonds — 1994 --
Future Revenue Required —— 4 000,0001
TOTAL FUNDS -- -- -- -- 4,000,000
PROJECT TITLE DEPARTMENT v PROJECT NO.
Laurel Avenue Widening Public Works
PROJECT DESCRIPTION
The widening of Laurel Avenue into a four lane roadway from Twenty—Third to IH-10. This project would relieve
congestion in the area.
i
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land —Engineering
Construction —— 500,000
Other
TOTAL COSTS -- -- -- -- 500,000
SOURCE OF FUNDS
Available Funds --
Grants&Contributions
Bonds — 1992
Bonds — 1994 --
Future Revenue Required -- 500,000
TOTAL FUNDS -- 500000
* * * CITY OF BEAUMONT, TEXAS
19
i
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
Bridge Replacement Public Works
PROJECT DESCRIPTION
This project will provide for the replacement of Brakes Bayou Bridge, a wooden structure. The bridge spans over
Brake Bayou to Marina Drive and services the Fire Training Grounds and the Beaumont Yacht Club.Also,the
rehabiltation of the Phelan Boulevard Bridge crossing between Kennedy and Belvedere. Separation of bridge slabs
has occurred due to tension and crackinq in the end caps.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 100,000 100,000
Other
TOTAL COSTS —— _100,0001 —— 1 100,0001 ——
SOURCE OF FUNDS
Available Funds 100,000 100,000
Grants&Contributions
Bonds — 1992
Bonds — 1994
Future Revenue Required —_
TOTAL FUNDS -- 100 ZOO -- 100,0001 —=
PROJECT TITLE DEPARTMENT PROJECT NO.
11th Street Public Works
PROJECT DESCRIPTION
Widen 11th Street from Washington Boulevard to Fannett Road.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 1,500,000 1,500 000
Other --
TOTAL COSTS —— —— 1,500,0001 1,5000001
——
SOURCE OF FUNDS
Available Funds --
Grants&Contributions
Bonds — 1992
Bonds — 1994 1,500,000. 1 500 000
Future Revenue Required __
TOTAL FUNDS -- -- 1,500,3337t 1,500,0001
--
* * * CITY OF BEAUMONT, TEXAS
20
PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
STORMWATER DRAINAGE IMPROVEMENTS
Current FY 1993 _ Planned Total Future
Project
Caldwood Dr. Outfall 98,000 —— —— 98,000 ——
Caldwood Drive—Phase 111 —— —— —— —— 350,000
Cartwright 1 22,000 —— —— 22,000 ——
Cartwright/Terrell—Phase Ila 104,000 -- -- 104,000 --
Cartwright/Terrell—Phase Ilb 1,000,000 7,500,000 -- 8,500,000 --
Cartwright/Terrell—Phase III -- -- -- -- 7,300,000
Lucas St. Outfall —— —— 810,000 810,000 ——
Twenty—Third St. Ditch -- -- 250,000 250,000 --
Ditch 904/Meentzen 32,000 —— —— 32,000 ——
NPDES Permit 425,000 -- -- 425,000 --
Broadway Outfall Ditch 318,000 -- -- 318,000 --
Broadway Outfall —— —— —— —— 1,475,000
Moore Street Ditch 69,000 —— —— 69,000 ——
Moore Street Ditch -- -- -- -- 3,500,000
Bond Issue Cost 200,000 -- -- 200,000 --
Prince Street—Phase 1 160,000 -- 4,150,000 4,310,000 --
Prince Street—Phase 11 —— —— —— —— 2,930,000
Prince Street—Phase 111 —— —— —— —— 2,385,000
South Park Relief 330,000 -- -- 330,000 --
South Park Relief—Phase 1 -- -- -- -- 4,150,000
South Park Relief—Phase 11 —— —— —— —— 2,930,000
South Park Relief—Phase III —— —— —— —— 2,385,000
High School Ditch —— 1,036,000 —— 1,036,000 ——
High School Ditch—Phase II -- -- 5,888,000 5,888,000 490,000
High School Ditch—Phase 111 -- -- -- -- 3,950,000
Fannin Box Design 681,000 -- -- 681,000 --
Fannin St.—Phase ' -- -- 1,000,000 1,000,000 --
Fannin St.—Phase II -- -- -- -- 4,500,000
Fannin St.—Phase III -- -- -- -- 4,500,000
Total Drainage Improvements 3,439,000 8,536,000 12,098,000 24,073,000 40,845,000
Source of Funds
Available Funds -- 675,000 98,000 773,000 --
Grants&Contributions -- -- -- -- --
Bonds 3,439,000 7,861,000 12,000,000 23,300,000 ——
Future Revenue Required -- -- -- -- 40,845,000
Total Source of Funds 3,439,000 8,536,000 12,098,000 24,073,000 40,845,000
21
THIS PAGE LEFT BLANK INTENTIONALLY
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
Caldwood Dr. Outfall Public Works
PROJECT DESCRIPTION
Double the capacity of the Caldwood Addition Outfall by allowing for teh construction of a storm sewer on East
Caldwood Drive from Old Hillebrandt Bayou to Bristol.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land __
Engineering
Construction 98,000 98,000
Other _
TOTAL COSTS 98,000 —— —— 98 000 ——
SOURCE OF FUNDS
Available Funds
Grants&Contributions
Bonds — 1992 98,000 98,000
Bonds — 1994
Future Revenue Required
TOTAL FUNDS 98,0001 -- -- 98,000 --
PROJECT TITLE DEPARTMENT PROJECT NO.
Caldwood Drive Drainage — Phase III Public Works
PROJECT DESCRIPTION
Project to complete the drainage for the Caldwood Addition and relieve all street flooding.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction —— 350,000
Other
TOTAL COSTS —— —— —— —— 350,000
SOURCE OF FUNDS
Available Funds
Grants&Contributions
Bonds — 1992
Bonds — 1994
Future Revenue Required -- 356,000
TOTAL FUNDS -- -- -- -- 350,000
* * *
CITY OF BEAUMONT, TEXAS
23
CAPITAL IMPROVEMENT PROGRAM
[P—RO�ECT TITLE DEPARTMENT PROJECT NO.Caright I Public Works
PROJECT DESCRIPTION
Construction of the Delores Street Ditch,the reconstruction of inlets and culverts and the regrading of roadside
ditches in the Cartwright area.
I
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering __
Construction 22,000 22,000
Other
TOTAL COSTS 22,000
-- -- 22000
SOURCE OF FUNDS —
Available Funds
Grants&Contributions __
Bonds — 1992 22,000 22,000
Bonds — 1994
Future Revenue Required
TOTAL FUNDS 22,0001 —— —— 22,0001 ——
PROJECT TITLE DEPARTMENT PRO.�t ,
Cartwright Ila Public Works
PROJECT DESCRIPTION
Construction of the Delores Street Ditch,the reconstruction of inlets and culverts and the regrading of roadside
ditches in the Cartwright area.
PROJECT COSTS CURRENT TOTAL FUTURE
Land _
Engineering
Construction .4—PLA—NNED
104,000
Other TOTAL COSTS 104 00 —— 104 000
SOURCE OF FUNDS
Available Funds
4000
Grants&Contributions Bonds — 1992 104000 000
Bonds — 1994 Future Revenue Re uired TOTAL FUNDS 104000 -- -- --
* * * CITY OF BEAUMONT, TEXAS
24
i
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
Cartwright(Terrell— Phase Ilb 'Public Works
PROJECT DESCRIPTION --
Cartwright Drainage Project area covers approximately 2,512 acres. The boundaries are roughly IH-10 on the
West, College on the North,Avenue E on the Northeast, and Washington Boulevard to the South.
i
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land ---
En ineerin
Construction 1,000,000 7,500,000 8,500,000
Other __
TOTAL COSTS 1 000 000 7,500,0001 8 500 000 ——
SOURCE OF FUNDS
Available Funds
Grants&Contributions
Bonds — 1992 1,000,000 7,500,000 8,500,000
Bonds — 1994
Future Revenue Required __
TOTAL FUNDS 1,000,0001 7,500,00011 8,500,0001
——
PROJECT TITLE DEPARTMENT PROJECT NO.
Cartwright/Terrell Street Box — Phase III Public Works
PROJECT DESCRIPTION
Cartwright Drainage Project area covers approximately 2,512 acres. The boundaries are roughly IH-10 on th
West,College on the North,Avenue E on the northeast,and Washington Boulevard to the South.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction —— 7,300,000
Other
TOTAL COSTS — —— —— —— 7,300,000
SOURCE OF FUNDS
Available Funds
Grants&Contributions
Bonds — 1992
Bonds — 1994
Future Revenue Required -- 7 300000
TOTAL FUNDS -- -- -- -- 7300000
* * * CITY OF BEAUMONT, TEXAS
25
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
Lucas St. Outfall Public Works
PROJECT DESCRIPTION
This project will allow for the construction of a new outfall to accommodate runoff from the Lucas Street Roadway
project and the surrounding area. The outfall will extend southward from the Calder and Lucas intersection
to Hillebrandt Bayou.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land —Engineering —
Construction 810,000 810,000
Other ——
TOTAL COSTS —— —— 1 810,0001 810,0001 ——
SOURCE OF FUNDS
Available Funds --
Grants&Contributions
Bonds — 1992 --
Bonds — 1994 810,000 810,000
Future Revenue Rewired --
TOTAL FUNDS -- -- 810,0001 810,0 0 --
PROJECT TITLE _ TMENT PROJECT NO.
Twenty—Third Street Ditch Public Works
PROJECT DESCRIPTION
Improvements to relieve the overloaded Twenty—Third Street Drainage System, requires completion of Lucas
Street.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land —Engineering —
Construction 250,000 250,000
Other
TOTAL COSTS —— —— 250,0001 250,0001 ——
SOURCE OF FUNDS
Available Funds --
Grants&Contributions
Bonds — 1992
Bonds — 1994 250,000 250,000
Future Revenue Required
TOTAL FUNDS -- -- 250,000 ,'
50 000 250,0001 --
* * * CITY OF BEAUMONT, TEXAS
26
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT
Ditch 904/Meentzen PROJECT NO.
Public Works
PROJECT DESCRIPTION
A participation project with Drainage District 6 to relieve Drainage Ditch 904. The relief ditch will connect 904 with they
Spear Road Ditch.
PROJECT COSTS CURRENT 1993
Land PLANNED TOTAL FUTURE
Engineering --
Construction 32,000
Other 32,000
TOTAL COSTS 32,000 -- 32 000
SOURCE OF FUNDS --
Available Funds
Grants&Contributions
Bonds — 1992 32,000
Bonds — 1994 32,000
Future Revenue Required ——
TOTAL FUNDS -
--
32,000 1 ——
PROJF^T I' DEPARTMENT
NPDES Perma PROJECT NO.
Public Works
PROJECT DESCRIPTION
To obtain the National Pollutant Discharge Elimination System (NPDES) permit as required by the Environmental
Protection Agency.
PROJECT COSTS CURRENT 1993 PLANNED
Land TOTAL FUTURE
Engineering ——
Construction 425,000
Other 425,000
TOTAL COSTS 425,0001 ---
SOURCE OF FUNDS -- 425000 --
Available Funds
Grants&Contributions --
Bonds.— 1992 425 000
Bonds — 1994 425 000
Future Revenue Required --
TOTAL FUNDS 425,000
425 000 ——
* * * CITY OF BEAUMONT, TEXAS
27
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
Broadway Outfall Ditch Public Works
PROJECT DESCRIPTION
Cross connection of the Broadway Box with a parallel box in the abandoned Southern Pacific right—of—way.
i
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 318,000 318,000
Other __ ----
TOTAL COSTS 318,0001 —— —— _J 318,000 ——
SOURCE OF FUNDS
Available Funds
Grants& Contributions
Bonds — 1992 318,000 318,000
Bonds — 1994
Future Revenue Required __
TOTAL FUNDS 318,000 -- -- 318,0001 --
PROJECT TITLE DEPARTMENT PROJECT NO.
Broadway Outfall Public Works
PROJECT DESCRIPTION
A project designed to relieve flooding along Broadway Street from Eighth Street to MLK Parkway.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction —— 1,475,000
Other
TOTAL COSTS
SOURCE OF FUNDS
Available Funds
Grants&Contributions
Bonds — 1992
Bonds — 1994
Future Revenue Required -- 1,475000
TOTAL FUNDS -- -- -- -- 1 1,475,0001
* * * CITY OF BEAUMONT, TEXAS
28
I
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
Moore Street Ditch Public Works
PROJECT DESCRIPTION
Improvements necessary to increase the capacity of the Moore Street ditch System through the installation of a box
for the Highland Avenue Crossing and construction of a new line to relieve flow in the existing storm sewer along
East Virginia.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering --
Construction 69,000 69,000
Other ——
TOTAL COSTS 69,0001 —— —— 1 69-000 ——
SOURCE OF FUNDS
Available Funds --
Grants&Contributions
Bonds — 1992 69,000 69,000
Bonds — 1994 --
Future Revenue Required --
TOTAL FUNDS 69,0001 —— 1 —— 1 69,0001 ——
PROJECT-TITLE DEPARTMENT PROJECT NO.
Moore Street Ditch Public Works
PROJECT DESCRIPTION
Improvements to increase the capacity of the Moore Street Ditch System with the installation of a Trunk System on
Maddox Street to East Virginia.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL I FUTURE
Land Engineering ——
Construction —— 3,500,000
Other ——
TOTAL COSTS —— —— —— —— 3,500,0001
SOURCE OF FUNDS
Available Funds --
Grants&Contributions
Bonds — 1992 ——
Bonds — 1994 ——
Future Revenue Re uired —— 3 500 000
TOTAL FUNDS -- -- -- -- 1 3,500,000
* * * CITY OF BEAUMONT, TEXAS
29
i
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE AND LOCATION DEPARTMENT PROJECT NO.
Bond Issue Cost Public Works
i
PROJECT DESCRIPTION
i
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land ——
Engineering ——
Construction
Other 200,000 200,000
TOTAL COSTS 200,0001 —— —— 1 200,000 ——
SOURCE OF FUNDS _
Available Funds ——
Grants&Contributions --
Bonds — 1992 200,000 200,000
Bonds — 1994 --
Future Revenue Re uired --
TOTAL FUNDS 200,0001 -- -- 1 200,000 --
PROJECT TITLE DEPARTMENT PROJECT NO.
Prince Street Outfall — Phase I Public Works Public Works
PROJECT DESCRIPTION
A system of storm sewers and ditches extending from Cleveland,along Prince and Pope, to the Neches River
marshes. Designed to relieve areas along Pine, Magnolia, Grand, Central Ninth Grade Center,&Bowie Jr. High
areas.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land _
Engineering __
Construction 160,000 4,150 000 4,310,000
Other I __
TOTAL COSTS 160,000 —— 4,150,0001 4,310,000 ——
SOURCE OF FUNDS
Available Funds --
Grants&Contributions __
Bonds — 19. 160,000
Bonds — 1994 4,150 000 4,150 000
Future Revenue Required
TOTAL FUNDS 1 160,0001 -- 4,150,0001 4,310.0001
--
* * * CITY OF BEAUMONT, TEXAS
30
i
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT , PROJECT NO.
Prince Street Outfall — Phase II Public Works Public Works
PROJECT DESCRIPTION
A system of storm sewers and ditches extending from Cleveland, along Prince and Pope, to the Neches River
marshes. Designed to relieve areas along Pine, Magnolia, Grand, Central Ninth Grade Center, &Bowie Jr. High
areas.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction —— 2,930,000
Other
TOTAL COSTS —— —— —— —— 2,930,000
SOURCE OF FUNDS
Available Funds
Grants&Contributions
Bonds — 1992
Bonds — 1994
Future Revenue Required -- 2,930.0001
TOTAL FUNDS -- -- -- -- 2,930,000
PROJECT TITLE OLPARTMENT IIWL JECT NO.
Prince Street Outfall — Phase III Public Works Public Works
PROJECT DESCRIPTION
A system of storm sewers and ditches extending from Cleveland,along Prince and Pope,to the Neches River
marshes. Designed to relieve areas along Pine, Magnolia, Grand, Central Ninth Grade Center,&Bowie Jr. High
areas.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL
Land FUTURE
Engineering --
Construction ——
Other -- 2,385,000
TOTAL COSTS —— —— —— 2 385 000
SOURCE OF FUNDS
Available Funds _
Grants&Contributions
Bonds — 1992
Bonds — 1994
Future Revenue Re uired 2,385,000
TOTAL FUNDS -- -- -- -- L 2,385,000
* * * CITY OF BEAUMONT, TEXAS
31
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
South Park Relief Public Works !
I
PROJECT DESCRIPTION 1
Installation of a new storm sewer system to divert water flowing south from the Pipkin—Church Street area to a new
outfall channel along the Southern Pacific right—of—way. i
i
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering __
Construction 330,000 330,000
Other I --
TOTAL COSTS 330 000 1 —— —— 330,0001 ——
SOURCE OF FUNDS
Available Funds __
Grants&Contributions __
Bonds — 1992 330,000 330,000
Bonds — 1994 --
Future Revenue Re uired __
TOTAL FUNDS 330,0001 -- -- 7 330,000 --
PROJECT TITLE DEPARTMENT PROJECT NO.
South Park Relief— Phase I Public Works
PROJECT DESCRIPTION
The South Park Relief Project area covers 445 acres. The area's boundaries are roughly Southern Pacific tracks on
the West,Church Street on the North, Palermo Street on the South,and Highland Avenue on the East.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction -- 4,150,000
Other
TOTAL COSTS —— —— —— —— 4150 000
SOURCE OF FUNDS
Available Funds
Grants&Contributions
Bonds — 1992
Bonds — 1994
Future Revenue Required —— 4 150,000
TOTAL FUNDS -- -- -- -- '41;0.000
* * * CITY OF BEAUMONT, TEXAS
32
i
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
South Park Relief — Phase II Public Works
PROJECT DESCRIPTION �
Improvement to relieve the overloaded Twenty—Third Street Drainage System, requires completion of Lucas Street l
I
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction —— 2,930,000
Other
TOTAL COSTS —— —— —— —— 2,930,0001
SOURCE OF FUNDS
Available Funds
Grants&Contributions
Bonds — 1992
Bonds — 1994
Future Revenue Required -- 2 930 000
TOTAL FUNDS -- -- -- -- 2,930,000
10JECT TITLE DEPARTMENT PRO 1!7_"T NO.
6outh Park Relief— Phase III Public Works
PROJECT DESCRIPTION
The South Park Relief Project area covers 445 acres. The area's boundaries are roughly Southern Pacific tracks on
the West,Church Street on the North,Palermo Street on the South,and Highland Avenue on the East.
PROJECT COSTS .. CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction ——
Other 2,385,000
__
TOTAL COSTS —— —— —— —— 1 2,385,000
SOURCE OF FUNDS
Available Funds
Grants&Contributions
Bonds — 1992
Bonds — 1994
Future Revenue Required -- 2 385 000
TOTAL FUNDS
* * * CITY OF BEAUMONT, TEXAS
33
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
High School Ditch—Phase I Public Works
PROJECT DESCRIPTION
High School Ditch Project area covers approximately 600 acres. The area boundaries are roughly Ashley Street on
the North, Second Street on the East, and Southern Pacific tracks on the South and S. Eleventh Street on the west.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL I FUTURE
Land __ _--
En ineerin ---
Construction 1,036,000 1,036,000
Other
TOTAL COSTS —— 1,036,0001 1,036,000
——
SOURCE OF FUNDS
Available Funds 675,000 675,000
Grants& Contributions __
Bonds — 1992 361,000 361,000
Bonds — 1994
Future Revenue Required
TOTAL FUNDS -- 1 1,036,0001 -- 1,036,000
--
PROJECT TITLE DEPARTMENT PROJECT NO.
High School Ditch — Phase II Public Works
PROJECT DESCRIPTION
High School Ditch Project area covers approximately 600 acres. The area boundarie. sre roughly Ashley Street on
the North, Second Street on the East,and Southern Pacific tracks on the South and �: ::leventh Street on the west.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land —Engineering --
Construction 5,888,000 5,888,000 490,000
Other ——
TOTAL COSTS —— —— 5.888.0001 5,888,0001 490,000
SOURCE OF FUNDS
Available Funds 98,000 98,000
Grants&Contributions
Bonds — 1992 —-
Bonds — 1994 5,790,000 5,790,000
Future Revenue Required -- 490,000
TOTAL FUNDS -- -- 5,888,0001 5,888,0001 490,000
* * * CITY OF BEAUMONT, TEXAS
34
i I
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
High School Ditch — Phase III Public Works
PROJECT DESCRIPTION
High School Ditch Project area covers approximately 600 acres. The area boundaries are roughly Ashley Street on
the North, Second Street on the East,and Southern Pacific tracks on the South and S. Eleventh Street on the west.
i
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction —— 3,950,000
Other
TOTAL COSTS —— —— —— —— 3 950 000
SOURCE OF FUNDS
Available Funds
Grants&Contributions
Bonds — 1992
Bonds — 1994
Future Revenue Required -- 3 950 000
TOTAL FUNDS -- -- -- -- 1 T950,000
000
PROJECT TITLE DEPARTiMlk NT PROJECT NO.
Fannin Box Design Public Works
PROJECT DESCRIPTION
Installation of a 5' x 8' box from I1-1-10 to Eleventh Street along Fannin.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering --
Construction 681,000 681,000
Other --
TOTAL COSTS 1 681,0001 —— —— 681,0001 ——
SOURCE OF FUNDS
Available Funds --
Grants&Contributions --
Bonds — 1992 681,000 681,000
Bonds — 1994 --
Future Revenue Required --
TOTAL FUNDS 681,0001 —— —— 681,0001 ——
* * * CITY OF BEAUMONT, TEXAS
35
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE AND LOCATION DEPARTMENT PROJECT NO.
Fannin Street Project — Phase I Public Works
I
PROJECT DESCRIPTION ~,
Project covers approximately 490 acres. The boundaries are roughly Southern Pacific tracks on the North, College
Street on the South, on the West by Hillebrandt Bayou and Southern Pacific tracks on the East.
I
PROJECT COSTS CURRENT 1993 PLANNED TOTAL I FUTURE
Land
Engineering
Construction 1,000,000 1,000,000
Other
TOTAL COSTS —— —— 7000,000 1,000,0001
——
SOURCE OF FUNDS
Available Funds
Grants&Contributions
Bonds — 1992
Bonds — 1994 1,000,000 1 000 000
Future Revenue Required __
TOTAL FUNDS 1,000,000 1 1,000,0001
--
PROJECT TITLE DEPARTMENT PROJECT NO.
Fannin Street Project — Phase II Public Works
PROJECT DESCRIPTION
Project covers approximately 490 acres. The boundaries are roughly Southern Pacific tracks on the North, College
Street on the South, on the West by Hillebrandt Bayou and Southern Pacific tracks on the East.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction -- 4500,000
Other
TOTAL COSTS —— —— —— —— 4,500,000
SOURCE OF FUNDS
Available Funds
Grants&Contributions --
Bonds — 1992 —Bonds — 1994
Future Revenue Required —— 4,500,000
TOTAL FUNDS -- -- -- -- 4,500,000
* * * CITY OF BEAUMONT, TEXAS
36
i
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT DEPARTMENT
Fannin Street Project — Phase III Public Works
PROJECT DESCRIPTION
Project covers approximately 490 acres. The boundaries are roughly Southern Pacific tracks on the North, College
Street on the South, on the West by Hillebrandt Bayou and Southern Pacific tracks on the East.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land ——
Engineering ——
Construction _ —— 4,500,000
Other --
TOTAL COSTS —— —— —— —— 1 4,5001000
SOURCE OF FUNDS
Available Funds --
Grants&Contributions
Bonds — 1992
Bonds — 1994 --
Future Revenue Required -- 41500.0 0
TOTAL FUNDS -- -- -- -- 4.500 000
* * * CITY OF BEAUMONT, TEXAS
37
THIS PAGE LEFT BLANK INTENTIONALLY
GENERAL IMPROVEMENTS
CAPITAL IMPROVEMENT PROGRAM
Current FY 1993 Planned Total Future
Parks and Recreation Projects
Riverfront Park 370,000 -- -- 370,000 --
Riverfront Park - Phase II -- -- 100,000 100,000 --
Lefler Park 240,000 -- -- 240,000 --
Halbouty Park 177,000 -- -- 177,000 --
Tyrrell Park - Playground 118,000 -- -- 118,000 --
Tyrrell Park - Hardcourt 54,000 -- -- 54,000 --
Tyrrell Park Road & Drainage -- 200,000 -- 200,000 --
Northend Gymnasium -- -- 1,500,000 1,500,000 --
Athletic Complex 15,000 60,000 -- 75,000 --
Athletic Complex-Phase I &II -- -- 550,000 550,000 --
Athletic Complex-New Road -- -- 80,000 80,000 --
Best Years Center 216,000 -- -- 216,000 --
BYC-New Parking Lot -- -- 25,000 . 25,000 New Swimming Pool-Southend -- -- 1,250,000 1,250,000 --
Colliers Ferry Park Phase II -- -- 915,000 915,000 --
Rogers Park-New Parking Lot -- -- 50,000 50,000 --
Subtotal Parks and Recreation 1,190,000 260,000 4,470,000 5,920,000 --
Municipal Facilities Projects
Health Department 175,000 -- -- 175,000 --
Health Department Health Center -- -- 2,100,000 2,100,000 --
Air Conditioner Replacement 100,000 60,000 -- 160,000 --
Civic Center Seating -- 150,000 -- 150,000 --
Julie Rogers Theater -- 25,000 -- 25,000 --
Library Interior -- -- 100,000 100,000 --
Coliseum Renovation -- -- 190,000 190,000 --
Airport T-Hangars -- -- 200,000 200,000 --
Airport Parking Facility -- -- 51,000 51,000 --
Police Evider,,;e & Storage Facility -- -- -- -- 1,750,000
Fire Environmental Improvements -- 750,000 -- 750,000 --
Chinn Lane Fire Station 360,000 -- -- 360,000 --
Rebuild Fire Station No. 6 -- -- -- -- 400,000
Tyrell Park Fire Station -- -- -- -- 400,000
Total Municipal Facilities 635,000 985,000 2,641,000 4,261,000 2,550,000
Total General Improvement Projects 1,825,000 1,245,000 7,111,000 10,181,000 2,550,000
Source of Funds
Available Funds 1,116,000 24,000 -- 1,140,000 --
Grants&Contributions 709,000 18,000 3,262,000 3,989,000 --
Future Revenue Required -- 1,203,000 3,849,000 5,052,000 2,550,000
Total Source of Funds 1,825,000 1.245,000 7111.000 10,181,000 2,550,000
39
i
THIS PAGE LEFT BLANK INTENTIONALLY
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
Riverfront Park Parks &Recreation
PROJECT DESCRIPTION
Construction of a 0.2 mile lighted trail with bridge, observation deck,fishing pier, playground, 6 picnic tables, 5
benches, utilities, landscaping,fencing & signs.
PROJECT COSTS CURRENT 1 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 370,000 370,000
Other
TOTAL COSTS 370,0001 —— 370,000
SOURCE OF FUNDS
Available Funds 254,000 254,000
Grants&Contributions 116.0001 116,000
Bonds
Bonds
Future Revenue Required
TOTAL FUNDS 370,0001 116,0001 486,0001
PROJECT TITLE t)tPARTMENT PROJECT NO.
Riverfront Park Phase II Paris 1k Recreation
PROJECT DESCRIPTION
Embankment barricade and railing to protect citizens along shoreline. Construction of pedestrian railing along
Phase II embankment to restrict access to river. Bulkheading along Phase II are to stabilize shoreline&prevent
erosion. Expansion of north end of park requires new fencing along railroad ROW,fill along embankment and
ne—rae along shoreline. Im rovement of drainage t underpass.
PROJECT COSTS
Land CURRENT 1993 PLANNED TOTAL FUTURE
En ineerin
Construction 100,000 100,00
Other
TOTAL COSTS -- -- 100 000 100 000
SOURCE OF FUNDS --
Available Funds E100-0000)
Grants&Contributions Bonds
Bonds
Future Revenue Re uired 100 000 TOTAL FUNDS -- -- 100 000 --
* * *CITY OF BEAUMONT, TEXAS
41
I
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
Lefler Park Parks&Recreation
PROJECT DESCRIPTION
Grant for Texas Parks &Wildlife does not include parking lot. Site would not be accessible for citizens with i
available parking.
I
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 240,000 240,000
Other
TOTAL COSTS 1 240 000 —— 240,0001
SOURCE OF FUNDS
Available Funds 50,000 50,000
Grants&Contributions 190,000 190,000
Bonds
Bonds
Future Revenue Required
TOTAL FUNDS 240000 -- -- 240000
PROJECT TITLE DEPARTMENT PROJECT NO.
Halbouty Park Parks&Recreation
PROJECT DESCRIPTION
Development of land recently donated to the City into a regional park facility.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 177,000 177,000
Other
TOTAL COSTS 177,0001 __ 177,0001
SOURCE OF FUNDS
Available Funds 60,000 60,000
Grants&Contributions 117,000 117,000
Bonds
Bonds
Future Revenue Required
TOTAL FUNDS 177,0001 -- —_ 7 177,0001
* * * CITY OF BEAUMONT, TEXAS
42
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
Tyrrell Park—Playground Parks&Recreation
PROJECT DESCRIPTION
Construction of two creative play areas at Tyrrell Park to include colorful equipment, sidewalks, shelter,picnic tables
and drinking fountain. One play area will be designed to accommodate handicapped children.
PROJECT COSTS CURRENT 1993 1 PLANNED TOTAL FUTURE
Land
Engineering
Construction 118,000 118,000
Other
TOTAL COSTS 1 118 000 —— 118,000 i
SOURCE OF FUNDS
Available Funds 118,000 118,000
Grants& Contributions
Bonds
Bonds
Future Revenue Required
TOTAL FUNDS 118,0001 -- 11810
00
PROJECT TITLE DEPARTMENT PF10JECT NO.
Tyrrell Park—Hardcourt Parks&Recreation
PROJECT DESCRIPTION
To provide for a 50' x 90'covered hard surface area with two basketball goals and lighting.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 54,000 54,000
Other
TOTAL COSTS 54,0001 —— 54,000
SOURCE OF FUNDS
Available Funds 54,000 54,000
Grants&Contributions
Bonds
Bonds
Future Revenue-Required
TOTAL FUNDS 54,000 , —— 1 54,0001
* * * CITY OF BEAUMONT, TEXAS
43
i
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
Tyrrell Park Road & Drainage Parks& Recreation
PROJECT DESCRIPTION
Existing road is failing. Poor drainage restricts citizen use of park. Increased visitation will require road to be
reconstructed. Access to park facilities is hindered due to water ponding.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 200,000 200,000
Other
TOTAL COSTS —— 200,000 1 200,0001
SOURCE OF FUNDS
Available Funds
Grants&Contributions
Bonds
Bonds
Future Revenue Required 200,000 200,000
TOTAL FUNDS -- 200,000 1 200,0001 --
PROJECT TITLE DEPARTMENT PROJECT NO.
Northend Gymnasium Parks&Recreation
PROJECT DESCRIPTION
A 20,000 square foot facility which would include restrooms, meeting room, locker room, showers and
support facilities.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land —
Engineeringi --
Construction 1,500,000 1 500 000
Other
TOTAL COSTS —— —— 1.500.0001 1 500 000 ——
SOURCE OF FUNDS
Available Funds ——
Grants&Contributions 1,500,000 1 500 000
Bonds
Bonds
Future Revenue Required --
TOTAL FUNDS -- -- 1 1,500,0001 1,500,0001
--
* * *.CITY OF BEAUMONT, TEXAS
44
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
Athletic Complex—Tennis Courts Parks&Recreation
i
PROJECT DESCRIPTION
Rehabilitate the eight existing tennis courts at the Municipal Complex.
i
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 15,000 15,000
Other
TOTAL COSTS 15,0001 —— 15 000
SOURCE OF FUNDS
Available Funds 15,000 15,000
Grants&Contributions --
Bonds
Bonds
Future Revenue Required
TOTAL FUNDS 15 000 -- 15 000
PRO,IEt;f -rITL,E DEPARTMENT PROJECT NO.
Athletic Complex Parks&Recreation
PROJECT DESCRIPTION
Install new irrigation system for nine (9) softball diamonds
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 60,000 60,000
Other
TOTAL COSTS 60,0001 —— 60,0001 ——
SOURCE OF FUNDS
Available Funds 24,000 24,000
Grants&Contributions
Bonds
Bonds
Future Revenue Required 36,000 36 000
TOTAL FUNDS 60,0001 —— 60
* * * CITY OF BEAUMONT, TEXAS
45
i I
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
Athletic Complex — Phase I & II Parks& Recreation
PROJECT DESCRIPTION
Construction new softball diamonds,fence, parking lot, concession stand,and restroom for new complex.
Expansion of softball program requires three new fields.
I
PROJECT COSTS CURRENT 1 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 550,000 550,000
Other
TOTAL COSTS —— 550,000 550 000
SOURCE OF FUNDS
Available Funds
Grants&Contributions —_
Bonds
Bonds
Future Revenue Required 550,000 550,000
TOTAL FUNDS ! 550,0001 550,0001
PROJECT TITLE DEPARTMENT PROJECT NO.
Athletic Complex — New Road Parks&Recreation
PROJECT DESCRIPTION
Existing road requires repair to three failed sections. Catch basins along the road path have deteriorated
creating hazards and poor drainage.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 80,000 80,000
Other
TOTAL COSTS —— 80,0001 80,0001
SOURCE OF FUNDS
Available Funds
Grants&Contributions --
Bonds
Bonds
Future Revenue Required 80,000 80,000
TOTAL FUNDS 80,0001 80,0001
* *
*CITY OF BEAUMONT, TEXAS * * *
46
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
Best Years Center Parks& Recreation
PROJECT DESCRIPTION
Renovate facility.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 216,000 216,000
Other
TOTAL COSTS 216,0001 -- -- 1 216,0001 --
SOURCE OF FUNDS
Available Funds
Grants&Contributions 216,000 216,000
Bonds
Bonds
Future Revenue Required
TOTAL FUNDS 216,0001 -- -- 1 216,0001 --
PROJECT TITLE DEPARTMENT PROJECT NO.
Best Years Center - New Parking Lot Parks&Recreation
PROJECT DESCRIPTION
Best Years Center renovation in 1992 will increase usage of facility and expanded programs will require additional
parking area.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 25,000 2-5,000
Other
TOTAL COSTS -- -- 25,3337 25,0001 --
SOURCE OF FUNDS
Available Funds --
Grants&Contributions --
Bonds
Bonds
Future Revenue Re uired I I 25,02 25,0001
TOTAL FUNDS -- -- 25,000 25,0001 --
' * *
CITY OF BEAUMONT, TEXAS
47
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
New Swimming Pool — Southend Parks&Recreation
PROJECT DESCRIPTION
Replace Alice Keith Pool. The Open Space element of the Comprehensive Plan identifies the need for a large
swimming pool in the southend of the city.
i
PROJECT COSTS CURRENT 1993 PLANNED TOTAL I FUTURE
Land
Engineering
Construction 1,250,000 1,250,000
Other
TOTAL COSTS 1 1,250,0001 1,250,0001
——
SOURCE OF FUNDS
Available Funds --
Grants&Contributions 1,250,000 1,250,000
Bonds
Bonds
Future Revenue Required --
TOTAL FUNDS -- -- 1,250,000 1,250,0 0 --
PROJECT TITLE DEPARTMENT PROJECT NO.
Colliers Ferry Park — Improvements Parks&Recreation
PROJECT DESCRIPTION
Property acquire in 1992. Master plan calls for parking area, site and drainage improvements, bulkhead, lighting,
landscaping, picnic facilities, pier/dock area. Planning Division to provide inhouse design.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering 92,000 92,000
Construction 823,000 823,000
Other
TOTAL COSTS —— —— 915,0001 915,0001 ——
SOURCE OF FUNDS
Available Funds
Grants&Contributions 440,000 440,000
Bonds
Bonds
Future Revenue Required 475,000 475,000
TOTAL FUNDS -- -- 915,0001 915,0001 --
* * * CITY OF BEAUMONT, TEXAS
48
i
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NO.
Rogers Park — New Parking Lot Parks& Recreation
PROJECT DESCRIPTION
Due to increased usag a new parking lot is needed on the south end adjacent to tennis courts, playground and
field sports areas.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 50,000 50,000
Other
TOTAL COSTS —— 50,0001 50,000
SOURCE OF FUNDS
Available Funds
Grants&Contributions
Bonds
Bonds
Future Revenue Required 50,0001 50,000
TOTAL FUNDS
50,0001 50,0001
* * * CITY OF BEAUMONT, TEXAS
49
THIS PAGE LEFT BLANK INTENTIONALLY
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NUMBER—�i
Health Department Health
PROJECT DESCRIPTION
This project will allow for the relocation of the education,training and administration divisions of the Health
Department. The existing facilities,with the exception of the newer clinics, are in need of repair and expansion.
PROJECT COSTS CURRENT PLANNED TOTAL FUTURE
Land
Engineering 1993
Construction 175,000 175,000
Other
TOTAL COSTS 175,0001 --
—— 175,000 ! ——
SOURCE OF FUNDS
Available Funds 105,000 105,000
Grants& Contributions 70,000 18,000 72,0001 160,000
Bonds
Bonds
Future Revenue Required (18,00 (72,000) (90,000)
TOTAL FUNDS 175,000 1 175,000 --
PROJECT TITLE DEPARTMENT PROJECT NUMBER
Health Department Health Center Health
PROJECT DESCRIPTION
Relocation and construction of new health center. 25,000 square feet.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 2100,000 2,100,000
Other
TOTAL COSTS —— —— 2,100,000 2100 000 1 ——
SOURCE OF FUNDS
Available Funds
Grants&Contributions
Bonds
Bonds
Future Revenue Required 2,100,000 2 100 000
TOTAL FUNDS -- -- 2 100 000 t 2100 000 --
*
* *.CITY OF BEAUMONT, TEXAS
51
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NUMBER
Air Conditioner Replacement Central Services
PROJECT DESCRIPTION
This project will allow for the purchase and installation of several large cooling units for the Police Station,
Julie Rogers Theater and Civic Center Complex.
PROJECT COSTS CURRENT 1 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 100,000 60,000 160,000
Other
TOTAL COSTS 1 100,000 60,0001 —— 160,000 ——
SOURCE OF FUNDS
Available Funds 100,000 100,000
Grants&Contributions
Bonds
Bonds
Future Revenue Re uired 60,000 1 60,000
TOTAL FUNDS 100,0001 60,0001 —— 1 160,0001 ——
PROJECT TITLE DEPARTMENT PROJECT NUMBER
Civic Center Seating Central Services
PROJECT DESCRIPTION
This project will allow for the overhaul and repair of the Civic Center telescopic seating sections. Also planned is
the replacement of theexisting power system witha non—friction motor system. The existing seating sections
are eleven years old and near the stage of being inoperable.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 150,000 150,000
Other
TOTAL COSTS —— 150,000 —— 150.0001 ——
SOURCE OF FUNDS
Available Funds
Grants&Contributions
Bonds
Bonds
Future Revenue Required 150,000 150,000
TOTAL FUNDS 1 150,0001 —— 150,0001 ——
* * *
C1 7Y OF BEAUMONT, TEXAS
52
i
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NUMBER
Julie Rogers Theater Community Services
PROJECT DESCRIPTION
Construction of a subsurface watering system.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 25,000 25,000
Other
TOTAL COSTS —— 25,000 —— 25,000 ——
SOURCE OF FUNDS
Available Funds E25,OOOTE
Grants&Contributions Bonds
Bonds
Future Revenue Re uired 25 000
TOTAL FUNDS -- —25,0001 -- 25,0 --
PROJECT TITLE .__ DEPARTMENT PROJECT NUMBER
Library Interior Community Services
PROJECT DESCRIPTION
This project will allow for new carpet,paint, replacement of damaged ceiling areas and fixtures at the upper and
entry levels of the Beaumont Public Library. These improvements are necessary after several years of rain damage
through the leaking roof.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 100,000 100,000
Other
TOTAL COSTS —— —— 100, 100,0001 ——
SOURCE OF FUNDS
Available Funds
Grants&Contributions
Bonds
Bonds
Future Revenue Re uired 100 000 100 000
TOTAL FUNDS -- -- 100 000 I 100 000 --
* * * C/TY OF BEAUMONT, TEXAS * * *
53
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT . P R 0 J E C T NUMBER
Coliseum Renovation Community Services
PROJECT DESCRIPTION --
i
Repair of extensive oxidation to the base metal comprising the roof sytem. The project will involve the insulation
removal, ridge cap replacement and eave, strut and metal roof panel replacement. This is Phase II of this project
and it consist of structural painting and remodeling.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 190,000 190,000
Other
TOTAL COSTS —— —— 190 000 190 000 —
SOURCE OF FUNDS
Available Funds
Grants&Contributions
Bonds
Bonds
Future Revenue Required
190,000 190,000
TOTAL FUNDS -- -- 190 000
190,0001 --
PROJECT TITLE DEPARTMENT PROJECT NUMBER
Airport T—Hangers Central Services
PROJECT DESCRIPTION
Construction of ten T—hangers and taxiway approaches.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction
Other 20006-0— 200,000
TOTAL COSTS —— —— 200 000 200 000
SOURCE OF FUNDS
Available Funds
Grants&Contributions
Bonds
Bonds
Future Revenue Required 200,000 200 000
TOTAL FUNDS —— —— 200,0001 200,0001 ——
* * *
CITY OF BEAUMONT, TEXAS
54
I
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT- PROJECT NUMBER
Airport Parking Facility Central Services
I
PROJECT DESCRIPTION
Construction of a sixty—six car capacity concrete parking facility at the Beaumont Municipal Airport. The minimum
standard requires that each building at the Beaumont Municipal Airport have a parking facility and the north hanger
does not.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction 51,000 51,000
Other
TOTAL COSTS —— —— 51,00 0 51 000 ——
SOURCE OF FUNDS
Available Funds
Grants&Contributions
Bonds
Bonds
Future Revenue Required 51,00-0 51 000
TOTAL FUNDS -- -- 51,000 51,0001 --
* *
*.CITY OF BEAUMONT, TEXAS
55
i
THIS PAGE LEFT BLANK INTENTIONALLY
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NUMBER
Police Property& Evidence Storage Facility Police
PROJECT DESCRIPTION
This project would provide combined space for Police and Central Services by demolishing the Lambs Building
and constructing a new two—story building on that site.
PROJECT COSTS CURRENT 1993 PLANNED Z1,500,000 FUTURE
Land
n ineerin
Construction __ 100,000
Other _—
TOTAL COSTS __ __ 150 000
SOURCE OF FUNDS -- -- 1,750000
Available Funds
Grants&Contributions
Bonds
Bonds
Future Revenue Re uired
TOTAL FUNDS __ 1,750.000
—— 1 750 000
* * * CITY OF BEAUMONT, TEXAS
57
t
CAPITAL IMPROVEMENT PROGRAM
PROJECT TITLE DEPARTMENT PROJECT NUMBER
Fire Training Ground Environmental Improvements Fire
PROJECT DESCRIPTION
Environmental cleanup.
I
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction
Other 750,000 750,000
TOTAL COSTS —— 750,0001 —— 750,0001 ——
SOURCE OF FUNDS
Available Funds
Grants&Contributions
Bonds
Bonds
Future Revenue Required 750 000 750 000
TOTAL FUNDS -- 750,0001 -- 1 750,0001
PROJECT TITLE DEPARTMENT PROJECT NO.
Chinn Lane Fire Department
PROJECT DESCRIPTION
This project will allow for the construction of a fire station on the Chinn Lane property in north Beaumont. This
station will be a relocation of the current station #5 and will allow for the realignment of the various fire districts
throu hout the Cit .
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
En ineerin
Construction 360,000 360,000
Other
TOTAL COSTS 360,0001 —— 360 000
SOURCE OF FUNDS ._
Available Funds 360,000 360,000
Grants&Contributions
Bonds
Bonds
Future Revenue Required
TOTAL FUNDS 360,0001 -- 1 360,000
* * * CITY OF BEAUMONT, TEXAS
5s
CAPITAL IMPROVEMENT PROGRAM
I
PROJECT TITLE DEPARTMENT PROJECT NUMBER
Fire Station #6 Reconstruction Fire
PROJECT DESCRIPTION
This project will allow for the reconstruction of the Amelia area fire station. The station is subject to flooding
and is in need of repair. It is important to bring the condition of this station up to standard, because,the location
has proven to be acceptable.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction —— —— —— 400,000
Other
TOTAL COSTS -- -- -- -- 400,000
SOURCE OF FUNDS
Available Funds
Grants&Contributions
Bonds
Bonds
Future Revenue Required 400,0W
TOTAL FUNDS -- -- 400,0001
PROJECT Tfl I Ea DEPARTMENT PROJECT NUMBER
Tyrrell Park Fire Station Fire
PROJECT DESCRIPTION
A new Fire Station to be constructed in the Tyrrell Park area.
PROJECT COSTS CURRENT 1993 PLANNED TOTAL FUTURE
Land
Engineering
Construction —— —— —— 400,000
Other
TOTAL COSTS —— —— —— —— 400 000
SOURCE OF FUNDS
Available Funds
Grants&Contributions
Bonds
Bonds
Future Revenue Required 400,000
TOTAL FUNDS -- -- -- -- 400,000
* * * CITY OF BEAUMONT, TEXAS
59