Loading...
HomeMy WebLinkAboutRES 90-223 id R E S O L U T I O N WHEREAS, on August 1, 1990, the City Council of the City of Beaumont awarded a contract in the amount of $846,256. 30 to BO- MAC Contractors, Inc. for the reconstruction of various streets throughout the City; and, WHEREAS, included in the project was a process in which several streets would be reconstructed; and, WHEREAS, due to the favorable bids received on all projects, the design for streets within this project were re-evaluated, necessitating Change Order No. 1, attached hereto as Exhibit "A", increasing the contract by $190,418. 00 to $1, 036, 674.86; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: That the City Manager, be, and he is hereby authorized, to execute Change Order No. 1, attached hereto as Exhibit "A", increasing the contract by $190,418 . 00 to $1, 036, 674.86 to BO-MAC Contractors, Inc. for the reconstruction of various streets throughout the City of Beaumont. PASSED BY THE CITY COUNCIL of the City of Beaumont on this the day of �,C�/ , 1990. Mayor - 2,?o - 02 9� J CHANGE ORDER No.: 1 Date: October 2 1990 PROJECT: 1990 Street Reconstruction OWNER: City of Beaumont CONTRACTOR: BO-MAC Contractors, Inc. THE FOLLOWING CHANGES ARE TO BE MADE TO THE ORIGINAL SCOPE OF WORK AS SET FORTH IN THE CONTRACT DOCUMENTS Description: Delete 3"limestone base and add 4" asphalt stabilized base. ITEM EST - UNIT TOTAL NO QTY UNIT DESCRIPTION PRICE PRICE 4 57,565 SY 3"Flexible Base $2.80 ( $161,182.00) 4A 60,000 SY 4" Asphalt Stabilized Base $5.86 $351,600.00 ORIGINAL CONTRACT PRICE $ 846,256.30 NET FROM PREVIOUS CHANGE ORDERS $ 0.00 TOTAL AMOUNT OF THIS CHANGE ORDER $ 190,418.00 PERCENT CHANGE FOR THIS ORDER 22.5% TOTAL PERCENT CHANGE TO DATE 22.5% NEW CONTRACT AMOUNT $1,036,674.30 ACCEPTED BY: Contractor APPROVED BY: City Engineer Director of Public Works City Manager ATTESTED BY: City Clerk EXHIBIT "A"