Loading...
HomeMy WebLinkAboutRES 92-149 i; RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be, and he is hereby authorized, to approve the revised Beaumont Municipal Transit System ADA Paratransit Plan substantially in the form attached hereto as Exhibit "A". PASSED BY THE CITY COUNCIL of the City of Beaumont this the e&,e day of 1992. - Mayor - it MAY 27 '92 11:16 PRINTS 11PRESSIGNS•+4 09-3369668 P.2 Beaumont Municipal Transit System. Response to 30 Day Review Letter on ADA Paratransit Plan Description of Proposed Cam lementar Paratransi.t service Conmant- Please make a "best guess" among the various demand estimates described.. It is questionable whether the proposed process will produce: a better estimate of demand. It is doubtful whether a six month period of time will be sufficient to conduct eligibility. certification and put scheduling capability in place in order to measure the full (non--capacity constrained) demand for Special Transit Services. Moreover, as the plan points out, people are not likely to continue to Gall in for trips for which there is no capacity. Many people will not bother to become certified if they know capacity is limited. Response•. The most logical method of estimating demand would be the method described on pages 13-14 of the previously submitted plan. This method estimates an increase in demand of 3 to 3. 5 trines the current levels will occur as a result of the expanded eligibility criteria under ADA. Data collection for the past three months has not supported this increase. However, as time passes and the disabled public becomes aware of the law under ADA, and as additional vehicle capacity is added to the special Transit flee,t, demand will -most probably increase significantly. This increase will certainly be more than the demand experienced during the short period since ADA became effective in January 1992. However, BMT does not envision demand .increasing as much as three fold as a. result of ADA_ Therefore, a demand estimate of two times the, current legal will be adopted for planning purposes. Data collection during the past three month--; has indicated that approximately 10t of paratransit eligible passengers who request a trip cannot be scheduled with existing capacity, about 5% of scheduled passengers do not get a time Urithin one hour of their initial request, and that about 1-1 of scheduled passengers are picked up one hour or more late. An additional 49 new ADA eligible passengers have been certified into the STS Program since ADA became effective in January or 1992. This represents almost an St increase in the total number in the program as of January 1992. Thus, BMT will recommend to City Council the purchase of enough Para-transit vehicles and the hiring of enough additional operators in FY 1993 to eliminate the exulting capacity constraints and allow for a significant increase in demand. Specifics are outlined in the timetable of milestones. EXHIBIT "A" i I" Y 27 '92 11:16 PRINT 'NPRE.'SIINS-+409-3369668 P.3 Comment: Please provide a timetable with milestones for service modifications based on the best available estivate of demand you have now. Please indicate on the timetable an estimated date for full compliance with ADA requirements. Response: The timetable below lists planned milestones which Will bring the Beaumont Municipal Transit System into compliance with ADA. June 1992: -Present recommendation to City Council to purchase an additional three paratransit vehicles and hire another four operators for the STS Program. Service would be increased from three vehicles operating a total of 28 hours on weekdays and two vehicles operating a total of 16 hours on Saturdays, to five : vehicles operating a total of 56 hours on weekdays and three vehicles operating a total of 28 hours on Saturdays. This would about double current operating capacity. -Prepare FTA Capital and operating Assistance Grant for purchase of three paratransit vehicles and operating monies for FY 1993 . Present to city council and submit to FTA. September 1992• -FTA approves grant for FY 1993. -Paratransit vehicle specifications are prepared and requests for bids are sent out. Decembcsr 1992: -Contract awarded for three paratransit vehicles. March 1993: -Take delivery of three paratransit vehicles. -Hire and train additional four operators. -Implement expanded STS service by placing additional paratransit vehicles Into operation. -COMPLIANCE WITH ADA SHOULD BE COMPLETED AT THIS TIME BASED ON DEMAND ESTIMATE OF TWO TIMES CURRENT LEVEL. May 1993: -STS Program evaluated to ensure compliance with ADAnd. Constraint indicators such as trip denials, late pick-ups, a trips scheduled more than one hour from requested time will be tracked. June 1933- -If constraints still exist, recommendations will be made to City Council for purchase of additional vehicles and the hiring of additional operators in the FY 1994 budget. -Prepare FY 1994 grant request and submit to FTA. NOTE: Compliance with ADA will continued to be evaluated on a yearly basis with recommendations made. to City Council during the budget preparation time frame of May-June each year. ii MAY 27 '92 1117 PRINT` Ih1PRE ,IOri,+409-336 668 P.4 Comment: Beauzont's current policy is that subscription trips should consume no more that 50t of total trips. However Exhibit G shows that 73% of trips are subscription trips (assuming dialysis and work trips . are subscription trips) . How will Beaumont make the trip patterns . consistent with the policy and with the ADA requirement? Response' All dialysis and work trips are not on a subscription basis. Many of them are scheduled on a call-in basis. BMT is ciirrentiy in compliance with the ADA requirement of limiting subscription trips to 50-% of capacity. Com��nt: Please provide five year operating and capital budgets that are consistent with the demand estimate and the milestones fax achievement of ADA compliance. ResRQnse: The following is a projected operating and capital budget for the operation of the STS Program only. This budget assumes that the additional paratransit vehicles purchased in FY 1993 will provide enough capacity to eliminate any constraints and bring B24T into compliance with ADA. Replacement vehicle costs are included for existing fleet vehicles. An increase of 5% is projected each year for operating expenses. FY 1993: LOCAL FEDERAL TOTAL Capital at 1tr/90 $ 20,000 $180,000 $200,000 (Purchase three paratransit vehicles) Operating at 50/50 $151,300 $151,300 $327,200 (iholudes only six months of expanded STS service) FY-_1994: LOCAL FEDERAL TOTAL Capital -0- -0- -0- Operating at 50/50 $211,350 $211,350 $449,300 FY 1995: LOCAL FEDERAL TOTAL Capital. at 10/90 $ 30,000 $270,000 $300,000 (replace three 2989 and one 1983 model paratransit vehicles) ii MAY 27 '92 11:18 PRINTr TMPRE SI0HS/+q05--336'-68 P. operating at 50/50 $222,600 $221,600 $471, 800 FY 1996: LOCAL FEDERAL TOTAL Capital -0- -0- -0- operating at 54/50 $232,400 $232,400 $495,400 FY 1997: LOCAL FEDERAL, TOTA L Capital -o- -a- --0- Operating at 50/50 $243, 800 $243,810 $520,200 NOTE., Operating cost totals include projected revenues of $24,600, $26,6010, $28, 60x, $30,604, and $32,640 for the fiscal years Of 1993, 1994, 1995, 1996, and 1997 respectively. Deserit,tioa of Eligibility Determimation Process Comment: What is Beaumont's policy regarding presumptive eligibility if an application is not processed with the ADA required 21 days? Response The answer to this question is found on pages 26-27 of the previously submitted plan. presumptive eligibility is given to anyone who either presents a certification from another transit system or makes a claim of being eligible although has no certification documentation. These individuals are given presumptive eligibility for 21 days. In both cases, during their initial request for Service, they will be informed if they plan to use the service for more than 21 days, they will be required to fill out an application form -and process through the system as a Local resident normally would. Service will not be provided beyond the 22 day period unless they have turned in a completed application form and been approved. Comment• Please provide clarification regarding the administrative appeals Process. Since the STS Coordinator is the first level of appeal and does the certification, there does not appear to be a separation of functions. Response: The Beaumont Municipal Transit System only has a General Manager and an Assistant Manager. Being a small system and not having a large staff, each of the above two individuals performs a myriad of different functions. In the case of the Assistant Manager, he acts as the STS coordinator, Maintenance Director, operations Director, N- 27 '92 11:19 PRINT IMPRESSIONS,'+409-336%68 P.6 a k Safety Director, Training Director, etc. Since he is the person who _ either approves or denies STS applications, then he is first in the appeals process for a denied applicant to plead his/her ease before. Next in line would be the General Manager and then Director of Public Works. nescripti0h of Public Particiyation Process comment: Was the plan, made available in accessible formats? Response; The plan was made available in accessible formats to anyone who requested one. Comment; Please provide documentation of public notice of the opportunity to comment on the plan. Response! Exhibits T, U, V, W, and X to the previously submitted plan all document the public participation process. Exhibit T is the flyer distributed on revenue vehicles which announced both public hearings. Exhibit U contains a copy of the press release announcing both public hearings and the list of media to which it was distributed. Exhibit v contains copies of the public hearing announcements published in the local newspaper, Exhibit W is a list of attendees rrom the first public hearing. Exhibit X is a summary of the comments made at the second public hearing on the proposed plan. Attached is a copy of the minutes from. the City Council meeting of January 21, 1992 at which time the second public hearing was conducted. .Comment- Please provide documentation that the demand estimate and budgets have been presented to the City Council. Response: Attached is a copy of the City Council meeting minutes of June 2, 1992, at which time the demand estimate and paratransit budgets were presented_