HomeMy WebLinkAboutRES 92-135 1,55-
RESOLUTION
WHEREAS, construction of the water, sanitary sewer, storm sewer and street
improvements in Gladys West - Section One, Phase II described as follows, have been
completed:
Street and Storm Sewer Improvements:
o Bluebonnet Street from the existing pavement 571 feet east to the end of
a temporary turnaround.
Water and Sanitary Sewer Improvements:
• Lots 9 through 20, Block 2
• Lots 10 through 16, Block 4
• Lots 1 and 2, Block 3
and,
WHEREAS, the developers of said addition desire to have these improvements
accepted and maintained by the City; and,
WHEREAS, the director of the Public Works and Engineering Department
recommends that said improvements meet city standards and qualify for acceptance for
permanent maintenance, and the City Council is of the opinion that said improvements should
be accepted and maintained by the City of Beaumont;
�� -/a:5- Qs-� r- 5 �
61
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the water, sanitary sewer, storm sewer and street improvements of Gladys West -
Section One, Phase II, as described above, are hereby accepted by the City of Beaumont and
shall be continuously maintained by the City contingent upon filing of the final plat complete
with filings of dedication of all rights-of-way and easements shown required on the preliminary
and final plats.
PASSED BY THE CITY COUNCIL of the City of Beaumont this the / 9,
day of �ti� , 1992.
- mayor -