HomeMy WebLinkAboutRES 92-041 912— -- 'e741 RESOLUTION WHEREAS, on September 17, 1991, the City Council authorized the City Manager to enter into a contract with E. R. Dupuis Concrete Company, Inc. in the amount of$125,212.20 for construction of the Crockett Street Parking Plaza; and, WHEREAS, during the course of construction of this project unknown underground obstructions in the form of building foundation walls and concrete-embedded trolley tracks have been encountered in the area to be excavated; and, WHEREAS, to remedy this existing condition, the contractor has submitted a price of $10.00 per cubic yard for excavation for a total cost of $7,200.00. Two hundred (200) cubic yards of backfill material will be required at $9.00 per cubic yard for a total cost of$1,800.00. Total cost of excavation and backfill is $9,600.00. The engineering staff recommends that water lines to service a future sprinkler system be installed during pavement construction. Approximately 400 linear feet of 1" polypropylene pipe at $2.00 per linear foot will be required. Total cost of water service lines is $800.00; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager, be, and he is hereby authorized to execute Change Order No. 1 in the amount of $10,400.00 to reflect the revised scope of work for this project. PASSED BY THE CITY COUNCIL of the City of Beaumont this the �- e day of 1992. ? - Mayor -