HomeMy WebLinkAboutRES 91-283 k ' 91- aJ?3 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: That the City Manager be, and he is hereby authorized, to execute Change Order No. I with Crain Brothers, Inc. in the Repair of Irving Street Outfall Phase H Project. The proposed Change Order has been created to decrease the contract amount by $44,605.50 to $355,004.50 as shown on Exhibit "A" attached hereto. BE IT FURTHER RESOLVED that in accordance with the terms of the contract, final payment in the amount of $20,334.23 be paid to Crain Brothers, Inc. PASSED BY THE CITY COUNCIL of the City of Beaumont this the Z&dday of _ 1991. - Mayor - 91-ad'3 CITY yr BEAUMONT DATE October 24,1991 PROJECT., Repair of Irving Street Outfall Phase 11 OWNER City of Beaumont CONTRACTOR:Crain Brothers,Inc. CHANGE ORDER NO.1 THE FOLLOWING CHANGES IN THE PLANS AND10R SPECIFICATIONS ARE HEREBY MADE 1 Increase or decrease in estimated quantities to reflect actual quantities used in the amount of$44,605.50 deduct. ORIGINAL CONRACT AMOUNT: $399,610.00 NET FROM PREVIOUS CHANGE ORDERS: $ -0- TOTAL AMOUNT OF THIS CHANGE ORDER: (344,605.50) PERCENT CHANGE PER THIS ORDER: 11.16% TOTAL PERCENT CHANGE TO DATE: 11.16% NEW CONTRACT AMOUNT: $355,004.50 CONTRACT TIME IS NOTAFFECTED BY THIS ORDER, ACCEPTED BY: APPROVED BY: Contrac r Joris P.Colbert,City Engineer Tom Warmer,Director of Public Works Ray Riley,City Manager ATTESTED BY: Rosemarie Chiappetta,City Clerk CITY OF BEAUMONT � Page 1 of1 r T:Irving Street Drainage Phase If Prepared By: Loj�' , ✓ J CTOR: Crain Brothers,Inc. Hayward allicut Checked by: stimate No.:5 And Final Contract Date:June 1,1991 Contract Amount:$355,004.50' Vera Johnson Calendar Days:120 Calendar Days Used:115 Period Ending:10-31-91 ecenof Work Completed:100.00% Percent of Time Used:95.83% Change Order No.1-$-44,605.50(Reflects actual quantities used) Item Unit Actual Work Done Work Done This Total Work Done Unit Total No. Description Measure I Quantity Last Estimate Estimate To Date Price 1 Box preparation EL-T- 18.63 18.63 0.00 18.63 $8,800.00 $163,944.00 TOTAL AMOUNT OF WORK DONE: $355,004.50 2 Longitudinal&Transverse Crack Repair LF 661.00 661.00 0.00 661.00 $19.00 $12,559.00 3 Construction Joint Repair LF 735.00 735.00 0.00 - 735.00 $28.00 $20,580.00 LESS 5%RETAINAGE $0.00 4 Honey Comb Wall Repair SY 7.00 7.00 0.00 7.00 $165.00 $1,155.00 5 Exposed Rebar Wall Repair SY 222.00 222.00 0.00 222.00 $175.00 $38,850.00 DIFFERENCE. $0.00 6 10'Concrete Wall SY 7.00 7.00 0.00 7.00 $300.00 $2,100.00 7 (Clean and Grout)Catch Basins Or M.H. EA 44.00 44.00 0.00 44.00 $400.00 $17,600.00 8 Catch Basin(Concrete Liner) EA 9.00 8.00 1.00 9.00 $1,080.00 $9,720.00 LESS SPECIAL REDUCTIONS: $0,00 9 Inlet Extension EA 18.00 18.00 0.00 18.00 $990.00 $17,820.00 10 Catch Basin(New Tops) EA 17.00 16.00 1.00 17.00 $420.00 $7,140.00 LESS LIQUIDATED DAMAGES: $0.00 11 Catch Basin(Rework Throat Opening) EA 8.00 8.00 0.00 8.00 $132.00 $1,056.00 12 Catch Basin(New 4'Conc.Pad) EA 3.00 3.00 0.00 - 3.00 $150.00 $450.00 LESS PREVIOUS PAYMENTS: $334,670.27 13 Plug Holes in Box EA 19.00 19.00 0.00 19.00 $100.00 $1,900.00 14 New Concrete Sidewalk SY 256.00 256.00 0.00 256.00 $18.00 $4,608.00 AMOUNT DUE THIS ESTIMATE: $20,334.23 15 New Concrete Pavement SY 42.00 42.00 0.00 42.00 $27.00 $1,134.00 16 Asphaltic Concrete Pavement SY 122.00 0.00 122.00 122.00 $10.00 $1,220.00 17 8'Flexible Base SY 63.00 63.00 0.00 63.00 $10.00 $630.001 APPROVED BY: 18 New Concrete Curb&Gutter LF 502.00 502.00 0.00 502.00 $12.00 $6,024.00 19 Grout Pipe In Box SY 23.00 23.00 0.00 23.00 $265.00 $6,095.00 20 Cement Stabilized Backfill CU YD 14.00 14.00 0.00 14.00 $20.00 $280.00 - 21 Saw Cut LF 139.50 139.50 0.00 139.50 $1.00 $139.50 22 Structural Plate Repair LF 350.00 350.00 0.00 350.00 $110.00 $38,500.00 23 Manhole(Reset Ring&Cover) EA 2.00 2.00 0.00 2.00 $150.00 $300.001 Joris P.Colbert,City Engineer 24 Replace Grate&Frame(Type A Inlet) EA 6.00 6.001 0.00 6.00 $200.00 $1,200.00 25 Plug Storm Sewer EA 0.00 0.00 0.00 0.00 $120.00 26 Trench Protection SF 0.00 0.00 0.00 0.00 $1.00 Tom Warner,Director of Public Works