Loading...
HomeMy WebLinkAboutRES 91-231 -',2 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT a five-year Capital Program for Fiscal Year 1992 through Fiscal Year 1996, attached as Exhibit "A", be, and is hereby adopted. PASSED BY THE CITY COUNCIL of the City of Beaumont on this the day ofz� 1991. 4or - 1992- 1996 Capita/ Improvement Program CITY of BEAUMONT, TEXAS 3 , ' eau ont Ct o s c Office of the City Manager May 28, 1991 To: Mayor and Council Subject: Capital Improvement Program - Fiscal Years 1992 - 1996 The City Charter requires the presentation of a five-year Capital Program annually for consideration by the City Council. This program, commonly referred to as the CIP is to include a general summary and a list of all improvements, accompanied by corresponding project necessity statements, cost estimates, and anticipated timetables. The attached document represents the proposed program for fiscal years 1992 - 1996. The plan encompasses a five-year period with emphasis placed on the column labeled "FY 1992". These projects will require funding as part of the City's annual budget process. In the column labeled "current", the document recaps projects that are funded but have not been substantially completed . Projects labeled "planned" are included in the program to focus staff planning efforts and are subject to review and modification in the future. It is necessary for the Council to adopt a Capital Improvement Program with the annual budget on or before the 27th day of September. This action will provide a five-year plan and designate specific project allocations. Expenditure authorizations and funding mechanisms will occur during the annual budget process and throughout the fiscal year as contracts are awarded. The preparation and review of the five-year capital program is an excellent tool for assessing the City's financial needs related to the development and continuing maintenance of the valuable infrastructure of our community. Revisions and amendments may be incorporated into the plan as desired by the Council. Respectfully Submitted, Ray Riley City anager P.O. Box 3827 Beaumont, Texas 77704 Telephone 409/880-3708 Telefax 409/880-3712 I 1992-1996 Capital Improvement Program May 28, 1991 i I PROPOSED 1992-1996 CAPITAL IMPROVEMENT PROGRAM OVERVIEW OF CAPITAL IMPROVEMENT PLANNING Local officials, on behalf of citizens, take on the important responsibility of ensuring that buildings, streets, parks, and water systems are maintained and improved for their community and future use. Sound planning and fiscal commitment can ensure that major replacement costs are avoided and that the infrastructure quality remains suitable to support business and private investment in the community. A common mechanism used by local officials to manage this responsibility is the Capital Improvement Program (CIP), a plan for short- and long-range physical development. One benefit of the Capital Improvement Program is that it allows for project evaluation at a comprehensive level. It also provides the financial information necessary to carefully plan and anticipate changes in tax structure, user fees, and bonded indebtedness. The CIP process allows annual program updates to incorporate changing community priorities and financing strategies, which require careful consideration. An important determination is whether a particular project will enhance the viability of the economic base and provide quality-of-life amenities for its citizens. SUMMARY OF PROPOSED 1992-1996 CAPITAL IMPROVEMENT PROGRAM The Proposed 1992-1996 Capital Improvement Program for the City of Beaumont totals $45,550,800. This program is limited to general, street and drainage improvements. The utility system (water and sanitary sewer) improvements are to be presented in a separate,document. A total of $16,130,000 or 35% of the five-year program is comprised of projects that have necessary financial resources in hand. An additional $28,219,080 or 62% is proposed to be funded from limited fund balances combined with proceeds from debt issuance, of which $13,300,000 in general obligation bonds has been previously authorized. Grants and contributions total $1,201,720 or 3% of the long-range program. Program Highlights A large portion of the five-year plan focuses on the completion of projects authorized in the 1982 Transportation Improvement Program as well as those approved in the 1983 Comprehensive Drainage Program. Large scale street improvements total $20,750,000 or 46% of the five year total. Drainage improvement projects total $17,000,000 or 37% _of the five year total. Also included is $7,800,800 or 17% for improvements related to renovation or expansion of municipal facilities including parks and buildings. streets 46% General 17% $20,750,000 $7,800,800 Drainage 37% $17,000,000 1992-1996 Capital Improvements Financial Impact As previously stated, $28,219,080 of the five year program requires future general revenue funded from debt issuance and limited fund balance reserves. Of this total, $13,300,000 in general obligation debt remains authorized yet unissued. The City's debt is currently serviced by approximately 21� of the 54¢ property tax rate and it is proposed that all new debt be serviced from the levying of new property tax in the amount necessary to offset the annual requirements. The following narrative indicates the impact that the issuance of this debt would have on debt service requirements and the amount of tax necessary to service that debt. Issue $22,150,000 General Obligation Debt - Street & Drainage Improvements The CIP details that the financial needs for the street and drainage projects will occur in the early portion of Fiscal Year 1992. These financial needs will have a direct impact on the tax structure of the City. Assuming a 15 year payout and a 6.5% interest rate, the debt service needs would be as follows: Additional Additional Cumulative Year Debt Issue Debt Service Tax Needs Tax For Debt 1992 $12,000,000 $1,250,000 4.5¢ 25.5 1993 $10,150,000 $1,100,000 4.00 29.0¢ Thus, in order to proceed with the street and drainage projects contained in this plan, an additional 8.5¢ of property tax will be required to service the debt. It is proposed 2 that the tax increase be phased in over a two year period as indicated above. Thus, a 4.5� increase is anticipated for FY 1992. Additional Financing Requirements The preceding paragraph states that an additional levy of 8.5¢ in property tax is necessary to service the debt related to the completion of long-planned and critically necessary -street and drainage improvements. However, there are several municipal improvements that may require funding in the near future. These unfunded large scale improvements, summarized in the section titled "General Improvements", are estimated to cost over $6,000,000. In the 1991 Annual Budget, 2.00 of property tax was dedicated for capital improvements of this general nature. This tax generates approximately $550,000 annually. This sum could be used to continue a limited "pay-as-you-go" type of general improvement program. This method would require that a majority of the projects remain in the "planned" column for numerous years. It would require a minimum of eleven years to acquire necessary funds to complete the proposed projects included in this plan. This does not allow for the addition of new projects. Alternatively, the 2.0¢ could be pledged as debt service related to a larger scale program which would permit for the many proposed projects to commence as necessary. Assuming that fund reserves in the amount of $1,000,000 could be directed toward financing a portion of these improvements, it would still be necessary to issue debt of approximately $5,000,000 to complete these projects. The associated debt requirements would be as follows: Additional Related Year Debt Issue Debt Service Tax Needs 1993 $5,000,000 $525,000 2.0¢ The extent of improvements related to parks and municipal facilities depends largely on which method of financing is preferred. There are virtually no other sources of funds that could be targeted for improvements of this nature and scale. Future Considerations The 1992=1996 Proposed Capital Improvement Program may require that up to 8.5¢ of additional property tax be levied to service the debt associated with completion of the various projects. Consideration should also be given to the fact that the City's current annual tax supported debt will increase by $1,000,000 beginning in 1996. An additional 30 will be required to service our present level of debt. This will be a requirement until the year 2005 or until such time that increases in assessed values may offset these needs. 3 e 1992 CAPITAL BUDGET The total recommended program for 1992 is $16,645,800 or 36% of the five-year total. Coupled with an additional $16,005,000 of projects currently underway, over 72% of the five year program will become an immediate priority. The major funding source for FY 1992 projects is proposed to be the issuance of general obligation bonds. The plan indicates that $15,524,080 is required future general revenue, however, it is anticipated that a $12,000,000 issue will be sufficient to meet the cash flow needs of the various projects undertaken in 1992. General Improvements Proposed projects for 1992 include $295,000 in park and recreational facility improvements and $1,950,800 for improvements to municipal buildings. Program highlights include the acquisition of 25-50 acres at the original Collier's Ferry landing, now referenced as the "Pine Street Boat Ramp" for development into a City owned and maintained recreational facility. Road and parking improvements are essential at Tyrrell Park and the Athletic Complex. Municipal building improvements include the construction of the Chinn Lane Fire Station and the second phase of the restoration of the Fair Park Coliseum Roof. Funds are proposed to be allocated for rehabilitation of the telescopic seating sections at the Civic Center as well as for major air conditioning replacements at the Police Station and the Julie Rogers Theatre. The plan also provides for rain damage repairs for the interior of the Main Library. Approximately one- half of the municipal building improvements are scheduled to take place at the municipal airport, of which 90% are to be funded from an Aviation Grant. Street Improvements Major projects totaling $13,250,000 are currently underway in the Street Improvement Program. Projects include the reconstruction of College from 4th Street to Main, the West Lucas widening, and the first phase of the Concord project, which is an extension of the MLK Parkway. In addition to these large scale projects, funds are available to undertake a sidewalk construction program, to purchase and install a new traffic control system, and to repair the Phelan Boulevard Bridge. All funds required for these improvements are in hand. The FY 1992 street program includes Phases II and III of the Liberty Laurel project. Funds for these projects are to be obtained from the issuance of general obligation bonds, as:discussed earlier in this narrative. It is anticipated that these two projects will be underway by the summer of 1992. Drainage Improvements The 1992 proposed Drainage Improvement program will provide for the construction of $11,400,000 of projects. Many of the critical areas identified to receive drainage relief 4 i will be under construction. A few of the areas included in the 1992 plan are the ,,,Cartwright-Terrell Street Box, Fannin Street Box, Moore Street, and the High School Ditch. Funds necessary to construct these projects will be secured from the issuance of previously authorized drainage bonds. It is anticipated that these bonds will be issued early in Fiscal Year 1992 to meet cash flow requirements. Currently, funding is in hand for $2,150,000-'of drainage improvements in the Irving Street, Lucas Street, Caldwood and Fannett Road areas. Approximately 30% of the allocated funds have been spent or contractually committed for these improvements. 5 i a 1992-1996 CAPITAL IMPROVEMENT PROGRAM SUMMARY Prb�ects;. . CURRENT FY 1992 PLANNED IS YR TOTAL FUTURE General Improvements $605,000 $2,245,800 $4,950,000 $7,800,800 $0 . Street Improvements 13,250,000 3,000,000 4,500,000 20,750,000 Drainage Improvements 2,150,000 11,400,000 3,450,000 1 17,000,000 28;860,.000: TOTAL CAPITAL PROGRAM $16,005,000 $16,645,800 $12,900,000 45,550,80028860000! 1: CURRENT FY 1992 PLANNED .::.....::...9 .........:.:... . FUTURE ..:: . .....:. ..:::. 5YR TOTAL:: Project Expenditures To Date $5,434,200 $200,000 $0 $5,634,200 $0.. Funded Project Allocations General Improvements 505,000 25,000 0 530,000 Street Improvements 8,425,800 0 0 8,425,800 Drainage Improvements 1,540,000 0 0 1,540,000 Future General Revenue Required 0 15,524,080 12,695,000 28,219,080 :28. 86QflQ0;;. Grants&Contributions 100,000 896,720 205,000 1,201,720 0 00' TOTAL CAPITAL FUNDING $16,005,000 $16,645,800 $12,900,000 $45,550,800 $28;860,0 6 GENERAL IMPROVEMENT PROGRAM RENT FY 1 2 PLANNED : .R T.` CUR 99 TOTAL.. Riverfront Park Phase II $200,000 $0 $0 $200,000 Athletic Complex o Softball Field&Parking 250,000 0 0 250,000 o Road improvements 0 85,000 0 85,000 Tyrrell Park o Creative Playground&Trails 130,000 0 0 130,000 o Road Improvements 0 160,000 0 160,000 Lefler Community Park 0 0 200,000 200,000 Halbouty Neighborhood Park 0 0 100,000 100,000 Collier's Ferry Park 0 50,000 0 50,000 Parks&Recreation Center/Gymnasium 0 0 11000,000 1,000,000 Subtotal 000 . 2 175'000;: .. Chinn Lane Fire Station 0 400,000 0 400,000 Tyrrell Park Fire Station 0 0 500,000 500,000 North End Library 0 0 100,000 100,000 Municipal Court Annex 0 0 600,000 600,000 Julie Rogers Theater Foundation 25,000 0 200,000 225,000 Fair Park Coliseum Roof- Phase 11 0 135,000 0 135,000 Fire Station#6 Reconstruction 0 0 300,000 300,000 Civic Center Seating Rehabilitation 0 150,000 0 150,000 Airport T-Hangars 0 0 200,000 200,000 Street&Drainage Facilities 0 0 400,000 400,000 Municipal Airport Improvements 0 965,800 0 965,800 Community Health Center 0 0 1,200,000 1,200,000 Police Expansion 0 0 150,000 150,000 Air Conditioning 0 200,000 0 200,000 Main Library Interior 0 100,000 0 100,000 Subtotal Mu"hich I F"'41 0e5 25,000 1,950,800 3,650,000 ;:S.625;800' TOTAL GENERAL IMPROVEMENTS $605,000 $2,245,800 $4,950,000 $7,800,800 Fllfldlfig$Ource3 CURRENT FY 1992 PLANNED 5 YR TOTAL Grants 100,000 869,220 150,000 1,119,220 Funded Project Allocations 505,000 25,000 0 530,000 Future General Revenue Required 0 1,324,080 4,745,000 6,069,080 YMBL Coliseum Contribution 0 27,500 55,000 82,500 TOTAL FUNDING_ $605,000 $2,245,800 $4,950,000 1 $7,800,800 7 I STREET IMPROVEMENT PROGRAM P.fOjeCiS; .: CURRENT FY 1992 PLANNED 5'YRTOTAL Concord(IH10-Delaware) $2,200,000 $0 $0 $2,200,000 Concord(Delaware-Lucas) 0 0 4,000,000 4,000,000 College(4th -Main) 4,300,000 0 0 4,300,000 Liberty Laurel II 0 900,000 0 900,000 Liberty Laurel III 0 2,100,000 0 2,100,000 West Lucas 4,800,000 0 0 4,800,000 Major Drive Right-of-Way 1,450,000 0 0. 1,450,000 Sidewalk Construction Program 150,000 0 0 150,000 Traffic Control System 250,000 0 0 250,000 Phelan Bridge 100,000 0 0 100,000 Twenty-Third Street Widening 0 0 500,000 500,000 TOTAL STREET IMPROVEMENTS $13,250,000 $3,000,000 $4,500,000 $20,750,000 FUndtng`SUIIfGe ? >; > CURRENT FY 1992 PLANNED 5 YR TOTAL Project Expenditures to Date $4,824,200 $200,000 $0 $5,024,200 Funded Project Allocations 8,425,800 0 0 8,425,800 Future General Revenue Required 0 2,800,000 4,500,000 7,300,000 TOTAL FUNDING $13,250,000 $3,000,000 $4,500,000 $20,750,000 8 i I DRAINAGE IMPROVEMENT PROGRAM CURRENT FY 1992 PLANNED 5YRT6TAL FUTURE:'" Irving Street Outfall $460,000 $0 $0 $460,000 <i$Oi Lucas Street Outfall 810,000 0 0 810,000 Broadway Outfall Ditch 0 250,000 0 250,000 Cartwright-Terrell Street Box 0 8,700,000 0 8,700,000 .............................. Caldwood Drive Outfall 350,000 0 0 350,000 85Q0.00 Fannett Road Ditch No. 11 Outfall 530,000 0 0 530,000 << 67QOQ0 Fannin Street Box 0 750,000 0 750,000 High School Ditch 0 850,000 0 850,000 9.,690,000;, Moore Street Ditch 0 600,000 0 600,000 300DQQ;; Prince Street Outfall 0 0 1,600,000 1,600,000 ?"`'80Q000'` South Park Relief 0 0 1,850,000 1,850,000 «0>! Twenty-Third Street Ditch Relief 0 250,000 0 250,000 0> TOTAL DRAINAGE IMPROVEMENTS $2,150,000 $11,400,000 $3,450,000 $17,000,000 '66­..... fi00 Frandm .Soufces >: `<:` CURRENT FY 1992 PLANNED .FUTURE 9 S.;YR TOTAL:.:: Project Expenditures to Date $610,000 $0 $0 $610,000 0 Funded Project Allocations 1,540,000 0 0 1,540,000 0 Future General Revenue Required 0 11,400,000 3,450,000 14,850,000 2$;:860,000;;! TOTAL FUNDING $2,150,000 $11,400,000 $3,450,000 $17,000,000 $28,860,000:' 9 I � PROJECT DESCRIPTION & NECESSITY STATEMENTS GENERAL IMPROVEMENTS Riverfront Park Phase II ,. This project will allow for sidewalks, tables, drinking fountains, an observation tower, an additional pier/dock, a pedestrian bridge, and playground equipment in the currently undeveloped, northern area of Riverfront Park. The City has received a,50% matching grant from the Texas Parks and Wildlife Department. The anticipated completion date is Winter 1991. Athletic Complex Softball Field & Parking This project will allow for the construction of an additional three diamond softball complex with restrooms. It also provides for the construction of a new 150 car parking area, and an additional 50 car parking area between the existing parking lots on Complex I and II. The new three diamond area will serve as practice areas as well as regular play fields, and will alleviate the over-use of the existing nine diamonds. The anticipated completion date is Spring 1992. Road Improvements This project will allow for the renovation of the main road throughout the Municipal Complex as well as the repair and seal coat of the parking lots at the softball diamonds and tennis center. The repairs are necessary to avoid future large scale reconstruction. The anticipated completion date is Summer 1992. Tyrrell Park Creative Playground & Trails This project will provide for the construction of two creative play areas at Tyrrell Park. The play areas will include colorful equipment, sidewalks, a shelter, picnic tables, and a drinking fountain. One play area will be specially designed to accommodate handicapped children. The existing facilities at the park will be further expanded to include bridle paths and nature trails throughout the park. It is planned to identify, clear and mark two miles of bridle paths and one mile of nature trail. The development of these unique features will enhance the recreational attractions that currently exist at this regional facility. The anticipated completion date is Summer 1992. Road Improvements This project will allow for the reconstruction-of the main road throughout Tyrrell Park. Several sections of the major roadway are badly deteriorated. The anticipated completion date is Summer 1992. 10 j I Lefler Community Park This project will allow for the initial development of a new community park at Rose Lane and Comstock in north Beaumont. Included in this project is a creative play area, trails, bridges, a sportsfield, restrooms, and a parking area. The city expects to receive a 50% matching grant for these improvements, which will satisfy the requirements necessary to make this property a site suitable for community use. The project is planned for FY 1993. Halbouty Neighborhood Park This project will allow for the initial development of a new neighborhood park off of Gardner Road in north Beaumont. The project is planned for FY 1993. Collier's Ferry Park This project will allow for the acquisition and limited development of approximately 50 to 100 acres of property at the end of Pine Street, immediately adjacent to the Beaumont Country Club. Boat launch facilities are presently in place at this location, however, the supporting facilities such as marked parking, sidewalks, picnic tables, etc, are badly needed. Anticipated completion date is Summer 1992. Parks & Recreation Center/ Gymnasium This project will allow for the construction of an estimated 25,000 square foot recreation facility, to include an indoor basketball court, restrooms and locker areas, meeting rooms and possible administration offices. The location of this facility has not yet been determined, and the project is planned for FY 1995. Chinn Lane Fire Station This project will allow for the construction of a fire station on the Chinn Lane property in north Beaumont. At this time, it is planned to relocate the equipment and personnel located at Station #5 on Grand to this new facility, which will provide for the realignment of the various fire districts throughout the City. Recent and rapid growth in the north and northwest areas of Beaumont has caused for the existing station locations to become unbalanced. Anticipated completion date is Spring 1992. Tyrrell Park Fire Station This project will allow for the land acquisition and construction of a fire station in the Tyrrell Park area. This project is planned for FY 1995. 11 North End Library This project will allow for the acquisition of a facility In the North End for a branch library. The project is planned for FY 1994. Municipal Court Annex This project will allow for the possible relocation of the municipal court facility and administrative areas. Currently, the administrative offices are cramped, and the public waiting areas and customer service windows are equally crowded. It does not appear feasible to expand the existing court wing, and the police station continues to require additional space. The location of the proposed annex has not been determined, but the project is expected to commence by FY 1995. Julie Rogers Theater Foundation This project will allow for the construction of a subsurface watering system and the foundation stabilization of the Julie Rogers Theater. Interior cosmetic repairs are required also as a result of foundation settlement and movement. The continued movement of the foundation is contributing to major structural damage. The anticipated completion date is FY 1993. Fair Park Coliseum Roof - Phase II This project will allow for the removal of rust from the eave struts and purlins, painting of the structure, and rehabilitation of the concession area and restrooms. This work will protect the materials replaced under Phase I and prevent further rust and deterioration. Anticipated completion date is Winter 1992. Fire Station # 6 Reconstruction This project will allow for the reconstruction of the Amelia area fire station. The station is subject to flooding and is in need of repair. it is important to bring the condition of this station up to standard, because the location has proven to be acceptable. Anticipated completion date is Summer 1995. Civic Center Seating Rehabilitation This project will allow for the overhaul and repair of the Civic Center telescopic seating sections. Also planned is the replacement of the existing power system with a non-friction motor system. The existing seating sections are eleven years old and near the stage of being inoperable. The Civic Center cannot operate an assembly hall without the proper facilities. Anticipated completion date is Winter 1991. 12 I. Airport T Hangars This project will allow for the construction of ten all-steel nested T-hangars and taxiway approaches at the municipal airport. The units will be equipped with lighting, electric bi-fold doors and concrete foundations. These units would replace those destroyed during Hurricane Bonnie in 1986. The new units would satisfy the current demand which is measured by a ten aircraft waiting list. Anticipated completion is Summer 1993. Street and Drainage Facilities This project will allow for the construction of a 9,000 square foot pre-engineered metal storage building with 3,000 square feet of administrative areas at the fleet maintenance facility on Lafin Road. It will also provide an additional 3.6 acres of fenced circulation and parking area. The existing facility is over crowded with no room for expansion, and the move will allow for future growth, as well as the possible relocation of Parks and Recreation to the abandoned site on Concord. Anticipated completion date is Winter 1992. Municipal Airport Improvements This project will allow for the construction of a new runway and taxiways; the rehabilitation of the existing runway, taxiway and apron; overlay of the apron; the installation of runway lights, fencing, and a visual glide slope indicator; and the acquisition of runway protection zones at the Beaumont Municipal Airport. The City has been approved for a 90% matching grant for these improvements. The anticipated completion date is Fall 1992. Community Health Center This project will allow for the relocation of the education, training and administration divisions of the Health Department. The existing facilities, with the exception of the newer clinics, are in need of repair and expansion. It has been determined that it would be desirable to relocate the community health facilities to a more centralized location that would accommodate the health center's modernization and expansion needs. Clinic facilities would remain at the present location. Anticipated relocation date is Winter 1993. Police Station Expansion This project will allow for the expansion of the police administrative offices into the former jail facilities located in the basement of the police station. The improvements will help alleviate the over crowded conditions that currently exist at the station. The anticipated completion date is Spring 1992. 13 i I Air Conditioning This project will allow for the purchase and installation of several large cooling units for the Police Station, Julie Rogers Theater and Civic Center Complex. The anticipated completion date is Summer 1992. Main Library Interior This project will allow for new carpet, paint, replacement of damaged ceiling areas and fixtures at the upper and entry levels of the Beaumont Public Library. These improvements are necessary after several years of rain damage through the leaking roof. Anticipated completion date is Fall 1992. 14 I STREET IMPROVEMENTS Concord This project includes the construction of Gulf Street and M. L. King Jr. Parkway, from IH-10 to Live Oak Street. Additionally, it includes the widening of Live Oak and Concord from Gulf Street to East Lucas Drive. The first phase of the project will encompass IH-10 to Delaware and the second phase will continue from Delaware to East Lucas. This improvement of 2.8 miles of roadway will reduce traffic congestion, improve safety, and alleviate access difficulties associated with residential, commercial, school and Fair Park traffic. Traffic volumes on this route are expected to increase 33% by 1992 to 11,000 vehicles/day. Estimated completion date is Summer 1993. College (4th - Main) This project consists of reconstruction and widening of College to provide left-turn lanes and wider through lanes between 4th and Main Streets. The project also provides for the construction of the Wall Street Connector, between Neches and Jefferson. The connector is necessary to tie in with the proposed underpass on Wall Street and M. L. King Parkway. Delays along the 1.5 mile roadway are currently experienced due to narrow lanes, occasional on-street parking, short blocks, and vehicles waiting to make left turns. Traffic volumes are anticipated to reach 20,000 cars/day, and the existing condition of the roadway is poor. Given the extreme deterioration of the road surface, reconstruction is inevitable. Estimated completion date is Winter 1992. Liberty Laurel 11 and 111 Phase II of this project_includes the rehabilitation of Liberty and Laurel between Forrest and Eleventh Streets. Phase II includes the construction of a Connector, a grade separation at IH-10 and an additional traffic lane on Phelan Boulevard to Lucas. This project will alleviate current and future traffic congestion at existing east-west crossings of IH-10 and Calder, College, North, and Harrison and provide for smooth traffic flow into and out of the Central Business'District. Estimated completion date is Summer 1994. West Lucas The project includes the development of a roadway section from Laurel Avenue to Folsom Drive, with left-turn lanes at major intersections. Phase I, Laurel to Delaware, is included as a project in the State Urban System Highway Program. Phase 11 continues from Delaware to Folsom. This roadway serves as a major north-south arterial. Capacity restraints and traffic congestion indicate that the roadway must be widened. Estimated completion date is Winter 1992. 15 Major Drive Right-of-Way This project is a City-State effort to widen Major Drive from Phelan Boulevard to Dishman Road. It is a continuation of the Major Drive widening between College and Phelan. Additional phases include the widening from Dishman to Highway 105; College to Washington; and Washington to Fannett Road. Current traffic congestion along the 1.4 mile roadway mandates the widening of this major north-south arterial. The City's share of the project is to acquire the right-of- way.. Estimated completion date is Winter 1992. Sidewalk Construction Program This program will allow for the construction of sidewalks throughout the City. Target areas will be in neighborhoods in which elementary schools exist, and those neighborhoods which have pedestrian traffic to local shopping and personal services. Sidewalks provide a safe avenue of travel for school-children and adult pedestrians, while also making the roadway safer for motorists. Estimated completion date is Winter 1992. Phelan Boulevard Bridge Repair This project will provide for the rehabilitation of the Phelan Boulevard Bridge crossing between Kennedy and Belvedere. The bridge spans approximately 100 feet across a major drainage canal. The project allow for the installation of new expansion joints and the repair of the end caps. Separation of bridge slabs has occurred due to tension and cracking in the end caps. This increases the potential danger of the bridge collapsing. Estimated completion date is Winter 1991. Traffic Control System This project will provide for the replacement of the downtown traffic computer and 40 intersection controllers and cabinets. The new system will have the capacity to expand to signals outside the downtown area. The existing traffic control system is obsolete and cannot be expanded. A new system will allow for effective signal timing as well as system component maintenance at reduce costs. Estimated completion date is Winter 1992. Twenty-Third Street Widening This project allows for the widening of Twenty-Third Street from Calder Avenue southward to Laurel. The roadway will be widened to four lanes with left turn lanes at the major intersection of Phelan. This construction will alleviate the traffic congestion in this area and allow for safer vehicle travel. Estimated completion date is Summer 1995. 16 DRAINAGE IMPROVEMENTS Irving Street Outfall This project will allow for the construction of an underground box to replace a deteriorated storm sewer line that runs from the Irving Underpass to Burt Street. Phase I will be from M. L. King to Hemlock, and Phase II will extend from Hemlock to Burt. This project will alleviate flooding in the area between M. L. King Parkway and the Mobil refinery. Estimated completion date Summer 1991. Lucas Street Outfall This project will allow for the construction of a new outfall to accommodate runoff from the Lucas Street Roadway project and the surrounding area. The outfall will extend southward from the Calder and Lucas intersection to Hillebrandt Bayou. This outfall is critical in ensuring that flooding along Lucas Drive does not continue. Estimated completion date is Fall 1992. Broadway Outfall Ditch This project will allow for the cross connection of the Broadway Box with a parallel box in the abandoned Southern Pacific right-of-way. The project will also provide for the reconstruction or replacement of damaged or overloaded inlets. This project is necessary in order to relieve the flooding in a 204 acre area between Eighth Street and the Neches River that is served by the Broadway Box. Estimated completion date is Summer 1992. Cartwright-Terrell Street Box This three phase project includes the construction of the Delores Street Ditch, the reconstruction of inlets and culverts and the regrading of roadside ditches in the Cartwright area. Existing storm sewer pipes and ditches will be enlarged throughout the 2,500 acre area bounded by IH-10, College, Avenue E and Washington. This project does involve participation with Drainage District 6 and estimated completion date of Phases I and II is Summer 1992. Phase III is considered a future project. Caldwood Drive Outfall This project will double the capacity of the Caldwood Addition Outfall by allowing for the construction of a storm sewer on East Caldwood Drive from Old Hillebrandt Bayou ,to Bristol; , . Approximately 30 inadequate inlets will be reconstructed with the project. Estimated completion . date is Winter 1991. 17 i I Fannett Road Ditch No. 11 Outfall This project will allow for the construction of a box culvert along Fannett Road to Harriot. The culvert will cross connect with the Harriot Street storm sewer. Estimated completion date is Winter 1991. Fannin Street Box This project will allow for the installation of a 5' x 8' box from IH-10 to Eleventh Street along Fannin. This box system covers approximately 490 acres. Estimated completion date of the first phase is Summer 1992. Future phases will follow. High School Ditch This project will allow for the construction of a concrete lined ditch, reconstruction of catch basins, and installation of box culverts. This project area covers 600 acres bounded by Ashley, Second, Southern Pacific Railroad Tracks, and South Eleventh Street. The first phase of this project will be completed Winter 1992. Moore Street Ditch This project will include improvements necessary to increase the capacity of the Moore Street Ditch System through the installation of a box for the Highland Avenue Crossing and the construction of a new line to relieve flow in the existing storm sewer along East Virginia. The new line will extend from the concrete-lined Moore Street Ditch northward to a cross connection with the East Virginia storm sewer north of Alabama. Estimated completion date is Spring 1992. Prince Street Outfall This project is a system of storm sewers and ditches that extend from Cleveland, along Prince and Pope, to the Neches River marshes. The project will alleviate flooding in the areas along Pine Street, Magnolia and Grand, and the Central Ninth Grade Center and Bowie Junior High. Estimated completion date is Summer 1993. South Park Relief This project includes installation of a new storm sewer system to divert water flowing south from the Pipkin-Church Street area to a new outfall channel along the Southern Pacific right- of-way. This project is necessary to alleviate flooding in the 409 acre area of south Beaumont served by the Ector Street Ditch system. Particular benefits will be in the Park-Saxe area. Estimated completion date is Spring 1993. 18 I Twenty-Third Street Ditch Relief This project will Include cl.new storm sewer on Gladys designed to relieve the overload on the 23rd Street drainage way. This project requires the completion of the Lucas Outfall, and is necessary to prevent flooding in the Lucas, Delaware, and Central Drive areas. Estimated completion date is Summer 1993. 19