HomeMy WebLinkAboutRES 90-052 90 -sue.
R E S O L U T I O N
WHEREAS, construction of the water, sanitary sewer,
storm sewer and street improvements in Windsor Park - Section I
described as follows, have been completed:
Street and Storm Sewer Improvements:
• Windsor Parkway from Dowlen Road 800 feet west
• Weston Court from Windsor Parkway 220 feet south to and
including the cul-de-sac
Water and Sanitary Sewer Improvements:
• Lots 1 through 8, Block 1
• Lots 1 through 7, Block 2
and,
WHEREAS, the developers of said addition desire to have
these improvements accepted and maintained by the City; and,
WHEREAS, the director of the Public Works and Engineering
Department recommends that said improvements meet city standards
and qualify for acceptance for permanent maintenance, and the City
Council is of the opinion that said improvements should be accepted
and maintained by the City of Beaumont;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the water, sanitary sewer, storm sewer and street improvements
of Windsor Park - Section I as described above, are hereby
accepted by the City of Beaumont and shall be continuously
maintained by the City contingent upon filing of the final plat
complete with filings of dedication of all rights-of-way and
easements shown required on the preliminary and final plats.
-9� - Sa 9- a7- 9Z)
PASSED BY THE CITY COUNCIL of the City of Beaumont this
the day of ,��cU�e�i 1990.
- Mayor -