Loading...
HomeMy WebLinkAboutRES 90-050 90. 5 d R E S O L U T I O N BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be, and he is hereby, authorized to approve the request of the Beaumont Yacht Club for deferral of six monthly payments in the amount of $4,975.85 each owed to the City under its management and concessions contract for the City-owned marina conditional upon the Club's constructing a proposed repair project for the boat launching ramps at the marina as described in Exhibit "A" attached hereto. PASSED BY THE CITY COUNCIL of the City of Beaumont this the day of , 1990. - Mayor - 9D- � �z�--9a 03/08/90 BEAUMONT YACHT CLUB BOAT LAUNCH RAMP RECONSTRUCTION SPECIFICATIONS March 8, 1990 COFFERDAM CONSTRUCTION Construct Cofferdam and De-water - construct a water tight cofferdam across slip (approximately 125' in length) . Cofferdam shall be located so as to provide ample working space for construction of the launch ramp. for cofferdam econstruction ashall lbe replacedrwithed units of like size and quality following removal of the cofferdam. The work area shall be kept de-watered during all construction and initial cure of concrete. DEMOLITION OF EXISTING DAMAGED AREAS OF LAUNCH RAMP Contractor to inspect existing ramp and note damaged areas. Demolition of the existing damaged areas of ramp are to be saw cut and broken on a line 12" above the highest damage found. Any existing reinforcing steel is to be left extending 24" beyond the break line. The broken concrete sections of the existing ramp may be broken into smaller pieces and used in combination with heavy clay to fill wash out holes at the end of the existing launch ramp. Otherwise the broken concrete is to be removed from the site and disposed of by the contractor. Remove five existing walkways between ramps (see Sheet 1 attached) . All materials, trash, rubble, etc. shall be removed from site and disposed of by the contractor. CONSTRUCT CONCRETE EXTENSION TO EXISTING LAUNCH RAMP Construct concrete launch ramp extension to the existing launch ramp (see Sheet 2 attached) . Form and pour a six inch (611) concrete ramp using 6 x 6 x 6 gauge welded wire mat reinforcement. Grade beams to have #4 reinforcing bars. Concrete to be five (5) sack, 3000 PSI mix with 4" maximum slump. If concrete is 4-1/2" thick or thicker at saw cut line install cinch anchors and 1/2" x 12" x 3" L-bolts on 18" centers (see Sheet 3 attached) . Washouts or voids within the new extension ramp area shall be backfilled with select clay material and compacted to 95% proctor prior to placing concrete for ramp. Surfaces of ramp shall receive a lateral tine finish. All form materials shall be removed prior to demolition of cofferdam. CONSTRUCTION OF WALKWAYS All existing walkways are to be removed (see Sheet 1 attached) . All existing pilings are to cut off 6" below the bottom of the ramp and capped with concrete (see Sheet 3 attached) . Sauna tubes will be used to extend the piling to elevation 3.0' as referenced to tide gauge at fuel dock of Beaumont Yacht Club. The tubes shall be installed according to accepted construction standards, which includes the concrete through the welded wire reinforcement of the new slab (see Sheet 2 attached) . Four (4) #4 reinforcing bars shall be placed in each tube (see Sheet 4 attached) . 4 x 6 # 1 Fine treated (CCA-.4) lumber to be bolted to sides o sauna tube with 5/8" galvanized bolts Exhibit "A" Page 1 l 03/08/90 (see Sheet 4 attached) . Bolts are to be countersunk into the 4 x 6 so as not to protrude the finish surface. Two (2) 2 x 6 # 1 pine treated (CCA-.4) and one (1) 2 x 8 # 1 pine treated (CCA-.4) shall be used to for the walk boards and be attached with galvanized ring shank nails. Walk boards are to be supported with 2 x 6 # 1 pine treated (CCA-.4) at 24" on center (see sheet 4 attached) . COFFERDAM REMOVAL All material's used to construct the cofferdam shall be removed from the slip following completion of the ramp construction. Prior to the removal of the cofferdam the representative of the Beaumont Yacht Club shall inspect the work site. Disposal of the earthen material used in cofferdam construction shall be placed by the contractor in two areas designated on the Beaumont Yacht Club property. The-designated disposal area shall be selected by the representative of the Beaumont Yacht Club. CLEAN UP Upon completion of the project the contractor shall remove from the site and dispose of all materials, waste, scraps, trash, etc. and prior to leaving the site the contractor shall notify the representative of the Beaumont Yacht Club for a final inspection. GENERAL NOTES 1. All materials to be new. 2. Concrete to be 5-sack, 3000 PSI mix. 4" minimum slump. 3. All bolts and nails to hot dipped galvanized. 4. All lumber to be # 1 pine treated (CCA-.4) 5. Contractor to verify all dimension and site conditions. 6. Contractor and the representative of the Beaumont Yacht Club shall verify channel depth elevations along cofferdam prior to beginning work on cofferdam and shall verify again after the removal of the cofferdam materials. Page 2 PIER V 4 �S� APPRpxIM.vTE EXISTING R..oMP WITH 2EMoVEEXISTI eNO¢ePLd�°o 5 '=1L�eb MILKWAYS C '"'�'Y'"I RAMP�x-[F1•tslor� j L �) (t.4MP RAMP f= -. -0.2 ML.-O.2 RAMP ?_sMP -0.6 tee. 0.3 1V o`k 4 � wa-rcQ Lj E J 3 ELEV 2.0 4 1=LEVATIOtJg �gSEp J oI,1 -rlpE �u4GE A-t FUEL pocK I CoNGRcTE RAIMIP� EXISTING r L.4VNc.H FZAMP w.�L.ICw.a�rs coNG RET I= � NeT Te xaLE As PF+,t T SNEgT 1 of 4 -b d o Z -L33HS t — - - T 1'1 v'HdS p• �jM1151X� S L .LON ( �13axlo= gnllSlx3 i I I J � I ra• 1• 0 C I 1-b H fl�r n J 3 a I L N o aasr'8 Slvo\1b'�t3-t3 N (Y 1 4 +1 jr A 1} } N l 3LVw l xcadd.y� WAA N I I �nlislxa 0 OD - I I I I D I s•E•,a I I F ( BOO dW9� 9r111CIX3 �d Q i �1va218 Ono Lc��y�tt f I m i N i I�►oFStl3SX3- dltivZi 3.L3a>tio> ^ � I 1 r jI�o N I I n I l-- - —73 — —— °•9--13 td �cl I1slx3 - 1 I I I - I f, a' 04 to L !� 1,161 d V 443 �n p0m Jl v N rn r � � x F o� o N m D r a N w 0 61 µ. � A n o 4 � m W 6. m m w • o � T O -lam �xs 2x� 4 xCc, a—Y Iu SLeave vi CouO"LE2z1uK QoLT I w I � d L in e I > VIA., II G k G G c.aGE �tK41FP5, gt SHEET 4 of 4