HomeMy WebLinkAboutRES 89-185 R E S O L U T I O N
BE IT RESOLVED BY THE CITY COUNCIL
OF THE CITY OF BEAUMONTt
THAT the Capital Program for the period 1990 through 1994, a copy
of which is attached hereto as Exhibit "A" , be, and it is hereby,
adopted.
PASSED BY THE CITY COUNCIL of the City of Beaumont this
the 19 day of September , 1989.
Ma o -
PRELIMINARY
CAPITAL
IMPROVEMENT
PROGRAM
FISCAL YEAR 1990 - 1994
PREPARED BY THE PLANNING DIVISION
APRIL, 01989 CITY OF BEAUMONT, TEXAS
c i
INTRODUCTION
THE CAPITAL
IMPROVEMENT
PROGRAMMING PROCESS
PRELIMINARY CAPITAL IMPROVEMENT PROGRAM
Page
I. Introduction "The Capital Improvement
Programming Process" . . . . . . . . . . . . . 1
II. General Summary "Capital Improvement
Program (CIP) 1990 - 1994"
Priority Rating System . . . . . . . . . 7
CIP by Function . . . . . . . . . . . . . 8
CIP Project Summary . . . . . . . . . . . 9
III. Statement of Necessity and Cost, Financing and
Scheduling by Service Areas for the "Capital
Improvement Program 1990 - 1994"
Public Safety . . . . . . . . . . . . . .
Fire . . . . . . . . . . . . . . . 17
Public Service . . . . . . . . . . . . .
Airport . . . . . . . . . . . . 18
Community Facilities . . . . . . . . 19
Parks . . . . . . . . . . . . . 21
Public Works
Streets 25
Traffic 26
Transit 27
Public Utilities . . . . . .
Sanitation . . . . . . 29
Water 3
e
THE CAPITAL IMPROVEMENTS PROGRAMMING PROCESS
Capital Improvements programming is the multi-year
scheduling of capital improvements for a community based on
agreed-upon priorities, available funding sources, and
local financing capabilities. The capital improvements
program includes a list of all proposed capital
improvements ranked in order of priority, an identification
of all possible funding sources, an analysis of the
financing capability of the local government and a schedule
or time-table for development.
A five to six-year period is usually selected for the
capital improvements program. Two or three years is often
too short for the planning, land acquisition, designing and
financing of major public facilities. Seven or more years
is too long to realistically program major community
facilities in step with changing community needs. For the
City of Beaumont, a five-year program has been established
by the City Charter. This covers the annual capital budget
and the proposed capital improvements for the succeeding
four years.
What is a "Capital Improvement"?
Although definitions vary from city to city, capital
improvements are almost universally considered to be
projects with a long useful life and a substantial cost.
Recurring maintenance, supplies, and small equipment items
are not considered capital improvements. The following
definition is used in Beaumont's CIP process:
o A capital improvement is a major, non-
recurring expenditure for physical facilities,
including land acquisition; construction
rehabilitation, or alteration of buildings;
construction of streets, utilities, parks or
other public infrastructure acquisition of
fixed equipment.
What are the Benefits of the CIP Process?
Initiation of an ongoing CIP process is an important
step in improving the City government's effectiveness at
2
a f
physical planning and financial management. Among the
benefits that can be expected from an effective capital
improvements programming process are:
• Introduction of a longer-range perspective into the
financial planning and physical development
processes.
• Coordination of the capital projects undertaken by
all City departments and other agencies, thereby
avoiding conflicts or overlaps in scheduling and
funding.
o A means of comparing the total cost of proposed
projects with the financial resources available.
o A means of allocating scarce fiscal and labor
resources to the projects that are most crucial to
the health, safety and well-being of Beaumont's
citizens.
• The opportunity to evaluate proposed improvements
in terms of their consistency with the Council's
financial management and physical development
policies.
• Stabilization of tax rates through a rational
approach to the management of bonded indebtedness.
o A means of evaluating the effects of capital
improvements on the operating budget.
• The opportunity to involve citizens in the
decision-making process.
• The ability to evaluate the cumulative effects of
all proposed capital projects rather than
evaluating individual projects in isolation.
3
o A clear-cut means of measuring progress in
providing public improvements.
How Does Capital Improvements Programming Relate to the
Comprehensive Plan*7
The Capital Improvements Program is closely tied to
Beaumont's Comprehensive Plan. The main objectives of the
Comprehensive Plan are: (1) to identify and analyze the
major population and economic forces that might influence
the development of the community, (2) to set achievable
goals for the future of the community, (3) to establish
future requirements for public improvements and services,
and (4) to provide the official public policies for
guiding the future physical growth and development of the
community.
The importance of public facilities in implementing
community planning and development policies has been
understood and accepted for many years. The 1982 Standard
City Planning Enabling Act called for city planning
commissions to review major public works decisions for
consistency with the comprehensive plan.
4
The preparation and review of the capital
improvements program (CIP) was intended as a way
to assure that public facilities reinforced the
Policies enunciated in the (comprehensive) plan.
How Does the CIP Relate to the Annual Bud et?
Each year, the City Manager prepares an Annual Budget
for adoption by the City Council. The Budget lists in
detail all proposed expenditures and revenues for the
upcoming fiscal year. The first year of the Capital
Improvements Program is included in the budget as the
Capital Improvement Budget (CIB) . In this way, the Capital
Improvement Program serves as a "bridge" between the City's
short-range planning (the budget) and its long-range plan
(the Comprehensive Plan) . It is customary to prepare the
capital improvements budget and the capital improvements
program annually, revising the entire program and adopting
the capital improvement budget each year as part of the
regular operating budget.
5
Relaticrzhip of the C.IP to the
wive Plan and An meal Budget
The Capital
The Comprehensive Plan Improvements Pil7gram The Annual Budget
Goals, objectives, policies The five-year scheduling Planned expenditures and
and proposals for long- . of capital projects based revenue
dre Physical growth and on priorities
o , available cperating troes for current-
t• funding sources and (� menses
financing capabilities. programs p and
services) and capital projects.
6
i
GENERAL SUMMARY
CAPITAL IMPROVEMENT
PROGRAM
CCIP) 1990 - 1994
PRIORITY RATING SYSTEMS
PRIORITY RATINGS
Projects were ranked by the initiating department using the three
level scale:
Priority "A" , Critical. Indicates a project
of critical need which cannot reasonably be
postponed because it will provide a remedy for
conditions dangerous to public health,
welfare, or safety, or it brings the City into
compliance with legal requirements.
Priority "B" , Essential. Indicates projects
which should be carried out within a few years
to met current or anticipated needs or for
replacement of unsatisfactory facilities.
Priority "C" , Desirable. Indicates projects
needed for a proper and desirable expansion of
a department program. The exact timing of
these projects can wait until funds are
available.
KEY TO
FUNDING SOURCE
ABBREVIATIONS
G O B. -- General Obligation Bonds
Rev B -- Revenue Bonds
GR -- General Revenues
SC -- Service Charges
GRANT (GT) -- Federal, State Funds or CDBG
US -- Undesignated Source
7
CAPITAL IMPROVEMENT PROGRAM
FUNCTION GROUPINGS
Public Safety . . . . . . . . . . . . A
Fire . . . . . . . . . . . . . . . 100
Public Services . . . . . . . . . . . . B
Airport . . . . . . . . 100
Community Facilities . . . . . . . 200
Parks . . . . . . . . . . . . . . 300
Public Works . . . . . . . . . . . . . C
Streets . . . . . . . . . . . . . 100
Traffic . . . . . . . . . . . . . 200
Transit . . . . . . . . . . . . . 300
Drainage . . . . . . . . . . . . 400
Public Utilities . . . . . . . . . . D
Sanitation . . . . . . . . . . . . 100
Water . . . . . . . . . . . . . . 200
8
CIP 1990-1994 FUNCTION SUMMARY
FUNCT/QN'>
PRIOR. YEAR: /ICE YEAR IOTA FY 1990 F�'1991 FY 192- 994 FlJ1V©IN.G SOURCES
A. PUBLIC SAFETY
Fire $49,000 $1,750,000 $500,000 $700,000 $550,000 GR
B. PUBLIC SERVICES
Airport 0 1,590,800 760,000 400,000 430,000 GR/Grant 90%
Community Facilities 1,061,280 3,922,000 60,000 75,000 3,787,000 GR/US
Parks 179,000 6,516,000 245,000 696,000 5,575,000 GR/Grant 50%
C. PUBLIC WORKS
Streets 161,249 4,310,000 0 55,000 4,255,000 GR/GOB
Traffic 0 103,000 0 103,000 0 G R
Transit 0 1,965,000 1,095,000 300,000 570,000 GR/Grant 90%
D. PUBLIC UTILITIES
Sanitation 300,000 168,000 50,000 96,000 22,000 SC
Water 1,511,000 19,764,000 1,050,000 1 3,194,000 15,520,000 Rev. B
CIP 1990-1994 FUNDING SUMMARY
FUND/Nr SQ(1RC PR/OR YEAR.:
-FIVE YEAR 7' 7A FY f9913 i�Y 799E F:Y f992.'1994:
General Revenue (GR) $862,650 $8,777,500 $940,500 $1,334,000 $6,503,000
Grant (GT)
(Federal, State or CDBG) 171,249 6,348,500 1,669,500 995,000 3,684,000
General Obligation
° Bonds (GOB) 4,255,000 0 0 4,255,000
Revenue Bonds (Rev. 8) 373,000 19,764,000 1,050,000 3,194,000 15,520,000
Service Charges (SC) 218,000 100,000 96,000 22,000
Undesignated Source (US) 725,000 0 0 725,000
'��� :`:' �a Jj yy ... �yy�y�
:::....................}............ ��.:: .....J�;I:;S:T�t1►1341t
CAPITAL IMPROVEMENTS 1990-1994 PROJECT SUMMARY (continued)
TOTAL FY 1992- FUNDING
I D# PROJECT NAME. PRIORITY :; : COST EY i99Q FY 1991 1994 SOURCE
........ . ... ...... . .. .. . .
A. PUBLIC SAFETY
Fire:
A 101 Fire Apparatus-Pumper A $200,000 $200,000 GR
A 102 Opticom A 50,000 50,000 SC
A 103 Replacement of Snorkel 1, an Aerial Fire Truck A 450,000 450,000 GR
A 104 Fire Station#14 B 550,000 550,000 GR
A 105 Fire Station#13 B 500,000 500,000 GR
B. PUBLIC SERVICE
Airport
........ .............:...:.:.:::..::::..:::....:
B 101 Airport-- Storage Facility B $200,000 $200,000 GR
B 102 Airport--Se.wity Fencing A 610,000 610,000 GR, Grant (90%)
8103 Airport Clear Zone Easement A 70,000 70,000 GR, Grant (90%)
B 104 Airport-- Hunway B 480,000 80,000 400,000 GR, Grant (90%)
B 105 Airport--Apron Extension B 230,000 230,000 GR, Grant (90%)
>::>:>:S u lit d�:
tat...
:»::.. 1 . .9.(1:tfQO�»::»> .;. .:�. .�.�;::>::»::: .
Community Facilities'
.. .........................................
B 201 Best Years Center A $60,000 $60,000 GR
8203 Platform Expansion at Riverfront Park B 77,000 77,000 GR
B 204 Riverfront Park - Railing B 25,000 25,000 GR
B 205 1 Purchase Property- Haynes Park B 20,000 20,000 GR, Grant (50%)
PROJECT SUMMARY (continued)
CAPITAL IMPROVEMENTS 1990-1994
TOTAL' ! F'Y 1992 FUNQING
ID# PROJECT NAME PRIORITY COST FYI:990' FY i99i < 1'994 SOURCG
B 206 Beaumont Big Ticket Park C 500,000 500,000 GR, Grant (50%)
B 207 Pine Street Boat Ramp C 50,000 50,000 GR, Grant (50%)
B 208 Central Park- Relocate Locomotive C 25,000 25,000 CDBG
B 209 Atheltic Complex- Recreation Center C 2,000,000 2,000,000 GR
B 210 Civic Center Meeting Room Renovation B 55,000 55,000 GR
B 211 Outdoor Electrical Distribution Plan B 65,000 65,000 GR
8212 Harvest Club Storage Building Replacement B 20,000 20,000 GR
B 213 Civic Center Seating Renovation C 300,000 300,000 GR
N B 214 Vistors Information Center C 250,000 250,000 US
B 215 Branch Library-- Northend C 475,000 475,000 US
Parks ,
B 301 Tyrrell Park -- Playground/Trails A $185,000 $185,000 GR
B 302 Atheltic Complex--Tennis Courts Drainage A 60,000 60,000 GR
8303 Tyrrell Park-- Road Repair B 166,000 166,000 GR
B 304 Haynes Park B 50,000 50,000 GR
B 305 Alice Keith Park-Community Ctr--Renovation B 125,000 125,000 CDBG
B 306 Central Park--Tennis Courts, Jogging Path B 75,000 75,000 CDBG
B 307 Riverfront Park -- Boat Ramp B 60,000 60,000 GR, Grant.(75%)
B 308 Guserr. n Park B 50,000 50,000 GR
B 309 Tyrrell Park Regional Facilities B 750,000 750,000 GR, Grant (50%)
B 310 Tyrrell Park-- Drainage B 50,000 50,000 GR
B 311 Gilbert Park B 50,000 50,000 GR
B 312 Alice Keith Park Restrooms B 80,000 80,000 CDBG
B 313 Hebert Park B 60,000 60,000 CDBG
B 314 Jacobs Parks B 50,000 50,000 CDBG
CAPITAL IMPROVEMENTS 1990-1994 PROJECT SUMMARY (continued)
TOTAL FY 1992 FUNDING
ID# PROJECT NAME PRIORITY COST FY i990i FY 199t 1994 SOUR('
B 315 New Park Windemere Area Park B 132,000 132,000 GR, Grant (50%)
B 316 Rogers Park B 32,000 32,000 GR
B 317 Tyrrell Park--South Entrance C 45,000 45,000 GR
B 318 Athletic Complex New Tennis Courts C. 175,000 175,000 GR, Grant (50%)
B 319 Edwards School Property C 400,000 400,000 GR, Grant (50%)
B 320 Roberts Park C 40,000 40,000 CDBG
B 321 Amelia Area Park C 250,000 250,000 GR, Grant (50%)
B 322 Tyrrell Park--Trailer C 250,000 250,000 GR
w B 323 Alex Durley Community Park C 1,250,000 1,250,000 GR, Grant (50%)
B 324 Florida-- Highland Area Park C 250,000 250,000 GR, Grant (50%)
B 325 Oakland/Maple Play Lot C 50,000 50,000 CDBG
B 326 Trail Systems--Greenbelt C 200,000 200,000 GR, Grant (50%)
B 327 Fehl Neighborhood Park C 275,000 275,000 GR, Grant ' No)
B 328 Colliers Ferry Park C 1,000,000 1,000,000 GR, Grant (au%)
B 329 New Park-- Meadows Area Park C 132,000 132,000 GR, Grant (50%)
B 330 Perlstein Park C 50,000 50,000 GR
B 331 Woodlands Park C 174,000 174,000 GR, Grant (50%)
. ................ :i>:.....�.............s.........:::.::.�.+.i�w.Fhxr.r���.::::::..yr4J',,•,:..,r�Q.0:>::::::::��r..;ua�3:�.ir},.y��Q:;:
C. PUBLIC,WORKS
Street
C 101 Wall Street Connector A $460,000 $460,000 G O B
C 102 Twenty--third Street Ext Hyde Park to Delaware C 145,000 145,000 G O B
C 103 Equipment Shed B 55,000 55,000 GR
C 104 Lafin Rd Construction w Concrete Foundation C 1,150,000 1,150,000 GOB
PROJECT SUMMARY (continued)
CAPITAL IMPROVEMENTS 1990-1994
=7 7:-:777777777777
TOTAL FY. 1992 : FUNDING
ID# ;PROJECT NAME ; PRIORITY ; COST
FY 199A FY 1991 1994 SOURCE
C 105 Twenty-third Street Widening and Extension C 2,500,000 2,500,000 GOB
........�.............rte.::.::.�:.: �`......tt)Q�.::.
Traffic
C 201 Closed Loop Master Traffic Control System A $103,000 $103,000 GR
Transit
C 301 Fleet Replacement A $875,000 $875,000 GR, Grant (90%)
C 302 Service Vehicle Replacement A 65,000 40,000 25,000 GR, Grant (90%)
C 303 Para-Transit Van Replacement A 180,000 180,000 GR, Grant (0^%)
C 304 Bus Washer Replacement B 150,000 150,000 GR, Grant (. A)
C 305 Radio System B 100,000 100,000 GR, Grant (90%)
C 306 Parking Area Repairs B 300,000 300,000 GR, Grant (90%)
C 307 Parking Area Repairs C 275,000 275,000 GR, Grant (90%)
C 308 Office/Shop Equipment C 20,000 20,000 GR, Grant (90%)
�r�
,.-
CAPITAL IMPROVEMENTS 1990-1994 PROJECT SUMMARY (continued)
TOTAL FY 1992 FUNDING
ID#
PROJECT NAME PRI©RITY COST FY 1990 FY 1991; 1994 !; SOURCE
D. PUBLIC UTILITIES
Sanitation>
D 101 Vehicle Wash Area B $50,000 $50,000 SC
D 102 Administration Building B 50,000 50,000 SC
D 103 Landfill Roads, Asphalt Overlay B 46,000 46,000 SC
D 104 Maintenance Facility C 22,000 22,000 SC
In ::::.:::::: :.: ............::. ... ...
Water Utilities
D 201 Sewage Treatment Plant ProcessContCompute A $200,000 $200,000 Revenue Bernd
D 202 Protection of Major Trunk Line A 1,500,000 300,000 300,000 900,000 Revenue E J
D 203 Small Line Rehab. A 1,250,000 250,000 250,000 750,000 Revenue Bond
D 204 Replace 2" Easement Line A 1,500,000 300,000 300,000 900,000 Revenue Bond
D 205 Calder 36" Interceptor A 1,600,000 1,600,000 Revenue Bond
D 206 11th Street 36" Interceptor A 4,100,000 4,100,000 Revenue Bond
D 207 23rd Street Interceptor A 400,000 400,000 Revenue Bond
D 208 MLK 20"/30" Water Line A 650,000 650,000 Revenue Bond
D 209 East Lucas 27" Interceptor A 2,700,000 2,700,000 Revenue Bond
D 210 Shakespeare 12" Water Line B 34,000 34,000 Revenue Bond
D 211 Major Drive Elevated Tank B 3,000,000 3,000,000 Revenue Bond
D 212 Gladys 12" Water Line B 60,000 60,000 Revenue Bond
D 213 Pump Station Discharge Line B 70,000 1 70,000 Revenue Bond
PROJECT SUMMARY (continued)
CAPITAL IMPROVEMENTS 1990-1994
TOTAL FY 1992- FUNDING
ID# ;PROJECT NAME PRIORITY COST FY 1990: FY 1991 94r:::::.;.; SOURCE
D 214 East-West 24" Trans Line C 2,700,000 2,700,000 Revenue Bond
............................................ ::::: ::.:::►::::::.::r::::,:::;<.: 1.,#a#1, # :.> :,. : Qt : t :; ...;ftC#:::
>'` 'A '>
I».. 0.
ON
STATEMENT OF NECESSITY
COSTS AND FINANCING
BY FUNCTION
FOR THE
CAPITAL IMPROVEMENT PROGRAM
1990 - 1994
}
F
LL
Q
a
v
J
m
3
IL
FIRE
FUNCTION
FUNDING
GROUP# PROJECr PRIORITY COST SOURCE
A 101 Fire Apparatus --Pumper A $200,000 GR
Replacement of Engine 2 which was acquired in 19747 It has a first line
useful life of 15 years and should be replaced.
A 102 O tD icom A $50,000 SC
Installation of Opticom System at various intersections throughout the city.
This would be the second year of a 5-year plan.
A 103 Aerial Fire Truck A
$450,000 GR
Replacement of Snorkel 1, an aerial fire truck. This unit is 20 years old.
A 104 Fire Station #14 B $550,000 GR
v
Construction of two-bay fire station at Tyrrell Park. One (1) 1500 GPM
pumper would be needed for the new fire station.
A 105 Fire Station #13 B $500,000 GR
Construction of a two-bay fire station at Chinn Lane and Old Voth Road.
One 1500 GPM pumper would be needed for this new fire station.
PUBLIC FACILITIEB
AIRPORT
FUNCTION FUNDING
GROUP# 1'10JECT PRIORITY COST SOURCE
B 101 Storage Facility A
$200,000 GR
Construct ten (10) unit storage facility for private aircraft.
B 102 Security Fencing A $610,000 GR/GT
10%/90%
Security fencing is required on north,west and south boundaries to reduce
unauthorized access, eliminate stray animals and prevent vandalism of
airport property.
B 103 Clear Zone Easement A $70,000 GR/GT
10%/90%
Clear zone is required to provide adequate clearance for aircraft during
landing procedures.
r B 104 Runway B $480,000 GR/GT
00 10%1'90%
Construct 650' runway and taxiway extension and lighting for runway 12-
30.
B 105 Apron Extension B $230,000 GR/GT
10%/90%
Apron extension will provide additional area for storage of aircraft.
Taxiway will improve access to other taxiways and runway 12-30.
COMMUNITY FACIL ES
FUNCTION
FUNDING
GROUP # PROJECT PRIORITY COST SOURCE
B 201 Best Years Center-Renovation A
$60,000 GR
Replace a portion of the metal roof and gutters,sandblast and paint metal
exterior and doom,install new electrical service and emergency exit lighting.
B 203 River--'ont Park-Docking Platform B
- $77,000 GR
Construct wooden platform to expand the docking facilities along the
Neches.
B 204 Riverfront Park -Railing B
$25,000 GR
Hand railing along the edge of the water on top of the sidewalk/bulkhead.
B 205 Haynes Park -Purchase B $20,000 GR
t. Acquire property for park that is presently being leased.
ko
B 206 Beaumont Big Thicket Park C $500,000 GR/GT
50%/50%
A twenty(20)acre special use park adjacent to the National Park Services-
Big Thicket. ,
B 207 Pine Street Boat Ramp C $ 50,000 GR/GT
50%/50%
Acquire twenty(20)acres of property adjacent to the Pine Street right-of-
way boat ramp to develop proper public support facility such as parking,
docks,viewing stands and picnic areas.
B 208 Central Park- Relocate Locomotive C $25,000 CDBG
Secure, repair for public access and relocate the locomotive to possibly .
Zaharias Park.
COMMUNITY FACILITIES (continued)
FUNCTION FUNDING
GROUP# PROJECT PRIORITY COST SOURCE
B 209 Athletic Complex-Recreation Center C $2,000,000 us
Year round center offering recreation programs not currently being offered
such as, natatorium, volleyball, handball, and racquetball courts, bicycle
tract,etc.
B 210 Civic Center Meeting Room Renovation B $55,000 GR
Renovate the meeting rooms in the Civic Center,replace carpeting,ceiling
and ligb'dng, paint and install wall treatments and replace furnishings.
B 211 Om�;_3r Electrical Plan B $65,000 GR
Install permanent electrical systems to provide for festival activities on the
grounds of the Julie Rogers Theater,Civic Center,Libraries,Museums and
Riverfront Park.
N
O B 212 Harvest Club Storage Building C $20,000 GR
Construct a new secure equipment furnishings storage building.
B 213 Civic Center Seating Renovation C $300,000 GR
Replace the folding chair seating and telescoping seating.
B 214 Visitor Information Center C $250,000 GR
Visitor Information Center and Convention and Visitor's Bureau Offices,
possibly located in Babe 7aharias Park.
B 215 Branch Library-Northend C $475,000 CDBG
Construction and furnishing of a branch library in the northern portion of
the city. This would also include the acquisition of land for the building
and parking lot.
PARKS
FUNCTION FUNDING
GROUP# PROJECT PRIORITY COST SOURCE
B 301 Tyrrell Park-Playground/Trails A
$185,000 GR
Improvements include play ground equipment; two(2)pedestrian bridges;
nature pedestrian trails as well as horse trails; parking lots; and an access
road for the Garden Center.
B 302 Athletic Complex-Tennis Courts Drainage A $60,000 GR
Correct drainage for existing tennis courts and resurface the courts,which
should occur every three years,current surface was applied in 1976.
B 303 _Tyrrell Park-Road Repair B $166,000 GR
Re-surface and widen main road at Tyrrell Park, to 24'width.
B 304 Haynes `nark B $50,000 GR
N
r
Ins►a_ a creative playground at Haynes Park.
B 305 Alice Keith Park-- Community Center--Renovation B $125,000 CDBG
Renovation of community center to include restroom,kitchen,and general
improvements to the structure.
B 306 Central Park--Tennis Courts and Jogging Path B $75,000 CDBG
Build two(2)new tennis courts with fencing and lights. Construct jogging
path with exercise stations.
B 307 Riverfront Park -Boat Ramp B $60,000 GR/GT
25%/75%
Boat ramp with appropriate parking and lighting.
B 308 Guseman Park B $50,000 GR
Install a creative playground at Guseman Park.
PARKS (continued)
FUNCTION
FUNDING
GROUP# PROJECT PRIORITY COST SOURCE
B 309 "Tyrrell Park- Regional Facilities B
$750,000 GR/GT
%/50%
Further development of the 489 acre park as a regional park with major 50
regional attractions such as an RV site, paddle boat facility, maintenance
yard,archery range,and related support facilities.
B 310 Tyrrell Park-Drainage B $50,000 GR
Drainage improvements around existing facilities.
B 311 Gilbert Park B $50,000 CDBG
Install a creative playground at Gilbert Park.
B 312 Alice Keith Park-Restrooms B $80,000 CDBG
tv
tv Replace existing restroom structure.
B 313 Hebert Park B $60,000 CDBG
Construct three(3) new tennis courts at Hebert Park.
B.314 _ obs Parks B $50,000 CDBG
Install a creative playground at Jacobs Park.
B 315 Windemere Area Park B $132,000 GR/GT
50%/50%
New neighborhood parks are needed to serve neighborhoods and developing
areas that are recreation and park deficient.
B 316 Rogers Park B $32,000 GR
Install a jogging path/exercise station at Rogers Park.
B 317 Tyrrell Park -South Entrance C $45,000 GR
Create a new entrance at the south end of Tyrrell Park.
PARKS (continued)
FUNCTION
FUNDING
GROUP# PROJECT PRIORITY COST SOURCE
B 318 Athletic Complex-- New Tennis Courts C $175,000 GR/GT
50%/50%
Construct four (4) new tennis courts, fencing, surfacing, light and roof
cover for night and inclement weather use.
B 319 Edwards School Property C $400,000 GR/GT
50900%
New neighborhood parks are needed to serve neighborhoods and developing
areas that are recreation and park deficient.
B 320 Roberts Park --Tennis Court C $40,000 CDBG
Replace tennis court, fencing and lights at Roberts Park.
B 321 Amelia Area Park C $250,000 GR/GT
50%/50%
w New neighborhood parks are needed to serve neighborhoods and developing
areas that are recreation and park deficient.
B 322 Tyrrell Park-Trailer C $250,000 GR
Install two(2) new trailer courts at Tyrrell Park.
B 323 Alex Durley Community Park C $1,250,000 GR/GT
50%/50%*
A new community park is needed to serve neighborhoods and developing
areas thRt are recreation and park deficient.
' Maximum state grants are currently$500,000 for state's share.
B 324 Florida -Highland Area Park C $250,000 GR/GT
50%/50%
New neighborhood parks are needed to serve neighborhoods and developing
areas that are recreation and park deficient.
B 325 Oakland/Maple Play Lot Park C $50,000 CDBG
Install a creative playground at Oakland/Maple Play Lot.
PARIS (continued)
FUNCTION FUNDING
GROUP# PROJECT PRIORITY COST SOURCE
B 326 Trail Systems --Greenbelt C $200,000 GR/GT
50%/50%
Cooperative land use agreement with Jefferson County, Drainage District
6,and City of Beaumont using easements and right-of-ways for continuous
trail systems through the City.
B 327 Fehl Neighborhood Park C $275,000 GR/GT
50%/50%
New neighborhood parks are needed to serve neighborhoods and developing
areas that are recreation and park deficient.
B 328 Colliers Ferry Park C $1,000,000 GR/GT
50%/50%
Acquire property for regional park to attract tourist, provide camping,
natural areas,and developed areas. Provide for quality of life.
N
B 329 Meadows Area Park C $132,000 GR/GT
50%/50%
New neighborhood parks are needed to serve neighborhoods and developing
areas that are recreation and park deficient.
B 330 Perlstein Park C $50,000 GR
Install a creative playground at Perlstein Park.
B 331 Woodlands Park C $174,000 GR/GT
50%/50%
New neighborhood parks are needed to serve neighborhoods and developing
areas that are recreation and park deficient.
a
Y
0
3
v
m
a
STREETS
FUNCTION
FUNDING
GROUP# PROJECT PRIORITY COST SOURCE
C 101 Wall Street Connector A $460,000 G O B
The construction of a roadway between College Street and Wall Street on
Neches Street to allow the two streets to operate as one way pairs.
C 102 C $145,000 GOB
Twenty-Third Street Extension
The extension of Twenty-third Street from Hyde Park to Delaware Street
as a two line roadway.
C 103 B $54,300 GR
Equipment Storage Building
Finish and install two(2)20'X 100'metal buildings to store the operations
Division's street repair trucks.
N C 104 $1,156,000 G O B
Lafin Road Construction C
Construction of Latin Road with concrete foundation to handle the heavy
city vehicles and landfill traffic.
C 105 $2,510,000 G O B
Twenty-Third Street Widening and Extension C
The widening and extension of Twewnty-third Street from Calder Avenue
to the existing pavement south of the Southern Pacfic railroad tracks to
four lanes with left turn lanes at major intersections.
TRAFFIC
FUNCTION
GROUP# PROJECT PRIORITY FUNDING
COST SOURCE
C 201 Closed Loop Master-Traffic Control System A
$103,000 GR
Closed Loop Master(Traffic Control) System with peripheral equipment
to replace existing VMS 220(Traffic Control)Computer System located in
City Hall.
N
O
TRANSIT
)~UNCTION
GROUP# PROJECT' PRIORY FUNDING
IT
COST SOURCE
C 301 Fleet Replacement A
$875,000 GR/GT
Purchase of five(5)35 foot advanced design transit buses. New buses will 10 90/90%
replace 1975 model AM General buses. The AM General buses are now
15 years old and have reached their useful life of 12 years or 500,000 miles.
C 302 Service Vehicle Replacement A $65,000 GR/GT
Phase 1: Purchase of two(2)Sedans and one(1)Pick-up Truck to replace 10%/90%
two(2)Sedans purchased in 1980 and one(1) Pick-up in 1977.
Phase 2. Purchase of one (1) Tow Truck to replace a Tow Truck
purchased in 1977.
C 303 Para-Transit Van Replacement A $180,000 GR/GT
N
14 Replacement of three(3)wheelchair lift equipped vans purchased in 1983. 10%/90%
Vehicles will be used to provide Special Transit Service for the City's
mobility impaired community. The current vehicles have reached the end
of their useful lives.
C 304 Bus Washer Replacement B $150,000 GR/GT
Replace existing bus washer with new bus washer. Current bus washer 10 901/90%
was installed in 1975 and requires frequent repairs.
C 305 Radio System B $100,000 GR/GT
Replace existing radio system with new radio system. Existing system 10 1700%
installed in 1976 is obsolete and requires frequent repairs.
C 306 Parking Area Repairs B $300,000 GR/GT
Phase L• Repair/replacement of bus parking area, removal of existing 5" 10%/90% "
concrete and replacement with 8"concrete.
TRANSIT (continued)
FUNCTION
GROUP# PROJECr PRIORITY FUNDING
COST SOURCE
C 307 Parking Area Repairs C
$275,000 GR/GT
Phase 2: Repair/replacement of bus parking area, removal of existing 5" 10%/90%
concrete and replacement with 8"concrete.
C 308 O_ ffice/Shop Equipment C
$20,000 GR/GT
Purchase of two 2 electronic t 10%/90%
( ) typewriters,copy machine,and maintenance
shop equipment needed to maintain new buses. All equipment purchased
will rep:ace items purchased in 1977 with the exception of engine and
transmission diagnostic equipment needed to repair new bus engines and
transmissions.
Iv
ce
f
PUBLIC UTILITIES
SANITATION
f
FUNCTION
FUNDING
GROUP# PROJECT PRIORITY COST SOURCE
D 101 Vehicle Wash Area B
$50,000 SC
Construct 100'x 40' concrete wash area for sanitation collection vehicles
and other city equipment. A single vehicle wash stall is currently used for
600+ City vehicles to rinse vehicles after washing is performed.
D 102 Construction of Administration Building B $50,000 SC
Replacement of 10 year old 14 x 17 mobile trailer with 30 x 36
administration building.
D 103 Asphalt Overlay of Landfill Facility--All Weather Roads C $46,000 SC
Provide asphalt overlay to 4,200' of all weather roads inside the Landfill
facility.
D 104 Maintenance Facilitv C
$22,000 SC
Construction of a 30 x 40 x 20 maintenance building for utilization by
landfill operation equipment. This will provide for uninterrupted repairs
to machinery due to inclement weather conditions.
WATER UTILITIES
FUNCTION
FUNDING
GROUP# PROJECT PRIORITY COST SOURCE
D 201 Sewer Treatment Plant Process Control Computer A $200,000 Rev B
Replace Sewage Treatment Plant's process control computer. The existing
process control computer has been in service for 13 years.
D 202 Protection of Maior Sanitary Sewer Trunk LIne A $1,500,000 Rev B
Install chemical feed equipment to inject sulfide reducing chemical.
Approximately 45,000 feet of 15 inch through 60 inch sewer line is being
destroyed by sulfide corrosion.
D 203 Small Line Rehabilitation A $1,250,000 Rev B
Remove and replace or slipline approximately 42,000 feet of 6 inch,8 inch,
10 inch and 12 inch sanitary sewer.
w D 204 Replace 2 Inch Water Line A $1,500,000 Rev B
0
Install 122,500 feet of 6 inch and 8 inch water line. Existing 2 inch cast
iron water lines located in back lot easements are 50 years have been
reduced to less than 3/4 inch diameter due to a buildup of rust.
D 205 Calder 36 Inch Sanitary Sewer A $1,600,000 Rev B
Slipline approximately 9,500 feet of 36 inch sanitary sewer. The line has
suffered major hydrogen sulfide corrosion to the pipe roof and receives
significant infiltration.
D 206 11th Street 36 Inch Sanitary Sewer Rehabilitation A $4,100,000 Rev B
Slipline approximately 12,700 feet of 15 inch and 36 inch sanitary sewer.
This line has suffered major hydrogen sulfide corrosion to the pipe roof
and receives significant infiltration.
D 207 23rd Street Sewer Interceptor A $400,000 Rev B
Replace 2,400 feet of 48 inch sewer. The roof of the pipe has been
destroyed by hydrogen sulfide gas.
WATER LJTILITIES (Continued)
FUNCTION FUNDING
GROUP # PROJECT PRIORITY COST SOURCE
D 208 M.L.K. Parkway 20 inch/30 Inch Water Line A $650,000 Rev B
Relocate 20 inch and 30 inch water line to adjacent parallel street from I-
H 10 South to South Street.
D 209 East Lucas 27 Inch Sanitary Sewer A $2,700,000 Rev B
Slipline approximately 9,700 feet of 27 inch sanitary sewer. The line has
suffered major hydrogen sulfide corrosion to the pipe roof.
D 210 Shakespeare 12 Inch Water Line B
$34,000 Rev B
Install approximately 800 feet of 12 inch water line. To provide needed
volume, pressure and reliability to Dowlen West subdivision.
rw� D 211 Major Drive Elevated Tank B $3,000,000 Rev B
Installation of a 2 million gallon elevator storage tank on Major Drive near
Humble Road is required to supplement pumpage during peak flow periods
daily and to comply with Texas Department of Health regulations.
D 212 Gladys Street 12 Inch Water Inch B $60,000 Rev B
Replace 1,200 feet of damaged 12 inch water line. Increase volume,
pressure and reliability.
D 213 Pump Station Discharge Lines B
$70,000 Rev B
Replace two raw water 60 inch pump discharge pipes, approximate length
80 feet east at Wiess Park.
D 214 East/West 24 Inch Transmission Line C $2,700,000 Rev B
Install 20,000 feet of 24 inch water transmission line to provide volume,
pressure and reliability.
t