Loading...
HomeMy WebLinkAboutRES 89-005 1WEND S Nc� ____� R E S O L U T I O N WHEREAS on October 25, 1988, City Council awarded a contract to Doty Construction, Inc. , in the amount of $63,370.90 for the construction of the 6" PVC pipe installation for the Fire Training Grounds Project; and, WHEREAS, on December 2, 1988, Change Order No. 1 was approved increasing the contract amount by $1 ,195.97 for a total of $64,566.87 ; and, WHEREAS, Change Order No. 2 is requested in the amount of $893.00 to connect approximately 3 LF of fifteen inch (15" ) PVC storm sewer at present grade and adjust elevation of 55 LF of six inch (6" ) PVC pipe to connect to manhole, thereby increasing the contract amount to $65,459.87; and, WHEREAS, the project has been inspected by the Engineering Division and is in conformance with the plans and specifications; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the herein described project is accepted by the City of Beaumont and the City Manager be, and he is hereby, authorized to approve Change Order No. 2 and make final payment to Doty Construction, Inc. , in the amount of $5,339.31 . PASSED BY THE CITY COUNCIL of the City of Beaumont this the �i1. _ day of , 198 . Mayor -