Loading...
HomeMy WebLinkAboutRES 88-174 AGENDA rrEM N R E S 0 L U T 1 0 N S BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be, and ',ie is hereby, authorized to execute aln interlocal agreement with Drainage District No. 6, a copy of which is attached hereto as Exhibit "A" , foi construction of a bridge on Sherwood Drive. PASSED BY THE CITY COUNCIL of the City of Beaumont this the -t>&2LZ' day of 1988. Mayor INTERLOCAL AGREEMENT THE STATE OF TEXAS COUNTY OF JEFFERSON This Contract is made by and between the City of Beaumont, a home rule City of the State of Texas (hereinafter called "City") , and Jefferson County Drainage District No. 6, a special district of the State of Texas (hereinafter called "District") under authority of the Inter-local Cooperation Act, Texas Revised Civil Statues ANN. Article 4413 (32c) . The City and the District agree as follows : WITNESSETH: The City and the District agree there is a need to replace the existing box culvert crossing at Sherwood Drive and Ditch No. 900 with a clear span concrete bridge and to concrete line approxi- mately 225 feet of the ditch from the end of the existing lining to 100 feet downstream of the Sherwood Drive bridge in the City of Beaumont. The City and the District agree to share the total cost of this project on the following basis: 1. District will engineer and design the structure. 2. District will coordinate and manage the project during construction. Upon completion and acceptance of the project, City will maintain the bridge replacement crossing and District will maintain the open ditch portion of the project. 3. Except as provided below, the City and District will each bear 50% of the cost of this project. 4. District will render a monthly billing to City for 50% of the monthly payments made by District under the construction contract as well as pay- ments made for engineering and other costs related to the project , with payment of same from the City within twenty (20) days of receipt of billing . Exhibit "A" Inter-local Agreement Page 2 5. The cost of relocation of City owned utility lines and/or structures, if any, will be borne by the City. The cost of all other utility lines and/or structures will be shared equally by City and District. 6. The cost of providing barricades, traffic re- routing , public notice and other related items shall borne equally by City and District by including same in the construction contract . 7 . The District will receive credit for engineering fees all ready expended in analyzing this problem against monthly cost sharing billings until this expenditure has been exhausted . Data and design work all ready completed will be forwarded to the City. 8. The City will be invited to give input and review for the bridge structure prior to the finali- zation of plans and specifications for the project . 9. The District will receive bids and select the best after reviewing said bids with the City. 10. The City will be listed as additional insured on the contractors insurance certificate. EXECUTED this day of , 1988. ATTEST: THE CITY OF BEAUMONT By: By: City Clerk City Manager ATTEST: JEFFERSON COUNTY DRAINAGE DISTRICT NO. 6 By: By: Vice-President/Secretary President