HomeMy WebLinkAboutRES 88-137 AGMA ffM NO R E S O L U T I O N WHEREAS, on December 9, 1986, City Council awarded a contract to Sterling Utility Construction, Inc. , in the amount of $736,378 for Sanitary Sewer Improvements Contract 18C; and, WHEREAS, Change Order No. 1 is requested to adjust contract estimates to reflect the as-built quantities and thereby decrease the contract amount by $18,508.63; and, WHEREAS, the project has been completed in accordance with the plans and specifications; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the herein described project is accepted by the City of Beaumont and the City Manager be, and he is hereby, authorized to approve Change Order No. 1 and make final payment to Sterling Utility Construction, Inc. , in the amount of $44,077.95. PASSED BY THE CITY COUNCIL of the City of Beaumont this the day of , 1988 Mayor - APPROVAL OF CONTRACT CHANGE Change Order No. 1 & Final Date: June 6, Project: City of Beaumont Contract 18C - Separation Sewers North (Long Avenue) EPA Grant No. C-481254-03 Owner: City of Beaumont, Texas P.O. Box 3827 Beaumont, Texas 77704 Contractor: Sterling Utility Construction, Inc . P.O. Box 1878 Leesville, Louisiana 71496 To The Owner: Approval of the following contract change is requested . Reason For Change: A. To adjust the "as-built" quantities of all bid items that deviate from the original contract bid item quantities. B. To reflect the various plan revisions (alterations) required during construction, with no "extra work" and utilizing existing bid items. C. To increase the contract amount for "extra work" performed by the Contractor for improvements constructed in addition to the contract plans. D. Adjustment of the contract 's construction period to include the approved contract time extensions. ORIGINAL CONTRACT AMOUNT $ 736,378.00 AMOUNT OF PREVIOUSLY APPROVED CHANGE ORDER NO. 0 - _U_ TOTAL CONTRACT AMOUNT BEFORE THIS CHANGE ORDER 736,378.00 THIS CHANGE ORDER: A. Adjustment of the original contract bid item quantities to reflect the actual "as-built" quantities. Bid Item No. Description Net Change 2 6" sanitary sewer installed in trench outside of street; decrease 199.5 L.F. @ $20.00/L.F. -$ 3,990.00 3 6" sanitary sewer installed in trench under concrete and/or asphalt street; increase 16.5 L.F. @ $50.00/L .F. +$ 825 .00 4 6" sanitary sewer furnished & installed without casing, bored & jacked; decrease 26 L .F. @ $46.00/L.F. -$ 1,196.00 5 8" sanitary sewer installed in trench outside of street; increase 279.5 L.F. @ $22.00/L.F. +$ 6,149.00 6 8" sanitary sewer installed in trench under concrete and/or asphalt street; decrease 120 L.F. @ $58.00/L .F. -$ 6,960.00 7 8" sanitary sewer furnished & installed in casing, bored & cased; increase 30 L .F. @ $90.00/L.F. +$ 2,700.00 1of6 A. (Continued) Bid Item No. Description Net Change 8 12" sanitary sewer installed in trench outside of street; increase 5 L.F. @ $32.50/L.F. +$ 162.50 9 12" sanitary sewer installed in trench under concrete and/or asphalt street; decrease 11.5 L.F. @ $81.50/L .F. -$ 937.25 10 12" sanitary sewer bored and jacked, with no casing required, including bore pit, grouting & testing; increase 20 L.F. @ $50.00/L.F. +$ 1,000.00 11 12" sanitary sewer furnished & installed with 20" steel casing; increase 12 L.F. @ $110.00/L.F. +$ 1,320.00 12 12" sanitary sewer installed in trench in highway R.O.W. not under pavement; increase .5 L.F. @ $32.00/L.F. +$ 16.00 13 15" sanitary sewer installed in trench under concrete and/or asphalt street, or outside street; increase 66.5 L.F. @ $80.00/L.F. +$ 5,320.00 14 24" sanitary sewer installed in trench outside of street; increase .5 L.F. @ $56.00/L.F. +$ 28.00 15 12" PVC DR-18, C-900 force main installed in trench outside of street; decrease 30 L.F. @ $22.00/L.F. -$ 660.00 16 12" PVC DR-18, C-900 force main installed in trench under concrete and/or asphalt street; increase 40 L.F. @ $61.00/L.F. +$ 2,440.00 17 12" PVC DR-18, C-900 force main bored & jacked; decrease 75 L.F. @ $55.00/L.F. -$ 4,125.00 19 12" x 45% 22-1/2% or 11-1/4° ductile iron force main fittings, mechanical joint, or PVC fittings; increase 3 EA. @ $300.00/EA. +$ 900.00 21 Sanitary sewer manholes for 21" I .D. & smaller sewer lines, 0-6 ' deep; increase 1 EA. @ $800.00/EA. +$ 800.00 22 Sanitary sewer manholes for 21" I.D . & smaller sewer lines, additional depth in excess or 61 ; decrease 3 V.F. @ $120.00/V.F. -$ 360.00 24 Drop inlet for sanitary sewer manholes, all sizes, all depths; decrease 6 EA. @ $350.00/EA. -$ 2,100.00 26 Abandon existing sanitary sewer manhole, includ- ing base/pavement replacement; decrease 2 EA. @ $1,200.00/EA. -$ 2,400.00 28 Tie in proposed sanitary sewer to existing man- hole; increase 2 EA. @ $280.00/EA. +$ 560.00 34 Additional length for reconnection of sanitary sewer laterals to new manhole, all sizes; decrease 40 L.F. @ $51 .00/L .F. -$ 2,040.00 35 Locate existing far side sanitary sewer service lines; decrease 2 EA. @ $150.00/EA. -$ 300.00 2of6 A. (Continued) Bid Item No. Description Net Change 36 Connect near side service line leads to new primary sanitary sewer or new manhole; decrease 4 EA. @ $610.00/EA. -$ 2,440.00 37 Connect far side service line leads to new primary sanitary sewer or new manhole; decrease 3 EA. @ $750.00/EA. -$ 2,250.00 38 4" service line cleanouts; decrease 18 EA. @ $100.00/EA. -$ 1,800.00 39 Catch basins and/or catch basin manholes; decrease 1 EA. @ $1,200.00 -$ 1,200.00 40 Storm drain manholes, precast concrete manholes; decrease 3 EA. @ $800.00/EA. -$ 2,400.00 41 15" R.C.P. separation storm sewer installed in trench, under concrete and/or asphalt street; decrease 128.5 L .F. @ $52.00/L .F. -$ 6,682.00 42 15" R.C.P. separation storm sewer installed in trench, behind the street curb; increase 94.5 L .F. @ $31.00/L.F. +$ 2,929.50 43 18" R.C.P. separation storm sewer installed in trench, under concrete and/or asphalt street; decrease 30 L .F. @ $59.00/L .F. -$ 1,770.00 44 18" R.C.P. separation storm sewer installed in trench, behind the street curb; increase 11.5 L.F. @ $35.00/L.F. +$ 402.50 45 21" R.C.P. separation storm sewer installed in trench, under concrete and/or asphalt street; decrease 6.5 L .F. @ $65.00/L .F. -$ 422.50 46 21" R.C.P. separation storm sewer installed in trench, behind the street curb; decrease 17 L.F. @ $38.00/L.F. -$ 646.00 47 36" R.C.P. separation storm sewer installed in trench, behind the street curb; decrease 1 L.F. @ $47.00/L.F. -$ 47.00 53 Replacement of 4" x 4' 0" concrete sidewalks; increase 395 L.F. @ $6.00/L .F. +$ 2,370.00 54 Replacement of concrete driveways with 5" of reinforced concrete; decrease .05 S.Y. @ $21.00/S.Y. -$ 1.05 55 Replacement of improved driveway with 6" of shell , gravel , asphalt/base, or iron ore; increase 110.82 S.Y. @ $12.00/S.Y. +$ 1,329.84 56 Remove & replace at new elevation and/or new location existing storm and/or combined sewer; decrease 50 L.F. @ $46.00/L.F. -$ 2,300.00 57 Additional fittings for gravity sewers; decrease 8 EA. @ $40.00/EA. -$ 320.00 58 Bypass pumping of sewage flows; decrease 100 hours @ $60.00/Hr. -$ 6,000.00 3 of 6 A. (Continued) Bid Item No. Description Net Change 59 Cement stabilized sand, 1-1/2 sacks of cement per cubic yard of clean sharp sand; decrease _$ 1,865.42 108.14 C.Y. @ $17.25/C.Y. 60 Class I embedment; decrease 48.5 C.Y. @ _$ 1,164.00 $24.00/C.Y. 61 Trench dewateringg by well point; decrease _$ 0.00 500 L.F. @ $0.00 L.F. 62 Type 1 saw cutting of concrete pavement; decrease 2446 L .F. @ $0.00/L .F. -$ 0.00 ITEM A - TOTAL REVISED CONTRACT AMOUNT -$ 27,123.88 B. Various plan revisions (alterations) required during construction, with no "extra work" and utilizing existing bid items. 1 . New manhole MH N-64P was constructed approximately 5 feet west of planned location to keep from obstructing existing drainage ditch on Forrest Street. 2. Line 9-2" from Station 7 + 00 to Station 0 + 02.5 on Ewing Street was relocated from under existing street pavement to behind the street curb and another manhole, MH N-79P, installed. 3. Line "E" (12" force main) was installed at various lower elevations along the route from Station 0 + 38 to Station 6 + 93 and Station 8 + 68 to Station 10 + 54 at the Contractor's request to facilitate ease of construction and possible conflicting utilities. From Station 6 + 93 to Station 8 + 41, the Contractor originally installed this section generally in accordance with the plans; however that extreme pipe joint deflections, due to a poor bore/case installation, resulted in the inability of the force main from holding (passing) the hydrostatic test. Subsequently, the Contractor decided to abandon this section of force main and reinstall a replacement section at a high elevation using the open cut trench method. 4. New manhole MH N-38P was relocated approximately 15 feet east of the planned location in order to intercept the existing 6" sanitary sewer on Stephenson Street. Additionally, the slope of Line "G" (8" sanitary sewer) from Station 0 + 00 to Station 2 + 33 was reduced to .33% in order to intercept the existing 6" sanitary sewer on Stephenson Street. 5. Line "F" (storm sewers) modifications consisting of the addition of two new junction boxes, one new ditch inlet struction, deleting some proposed storm sewer leads, and minor relocations of new storm sewers were constructed to facilitate obstructions from existing utilities, a building's overhanging canopy, and the discovery of previously unknown existing storm sewers. C. To increase the contract amount for "extra work" performed by the Contractor for improvements constructed in addition to the contract plans, as follows: 1 . Additional asphaltic concrete overlay, 2 inches thick, along Miller Street between Grant Avenue and Willow Street, in accordance with the Contractor' s letter dated July 31, 1987: 15.8 S.Y. @ $8.25/S.Y. +$ 130.35 2 . Additional street pavement consisting of reinforced concrete curb and gutter section, approximately 2 feet wide, on Miller Street between Grant Avenue and Willow Street, in accordance with the Contractor's letter dated July 31, 1987: 78 L.F. @ $16.00/L.F. +$ 1,248.00 4of6 3.' Tie"In an existing 12 inch storm sewer lead into the new 21 inch RCP storm sewer using PVC lateral saddle located at Miller Street and Grand Avenue, in accordance with the Contractor's letter dated July 31, 1987: Lump Sum +$ 400.00 4. Clean out and install a new concrete invert inside and existing ditch inlet catch basin which was damaged during boring/casing opera- tions located at the Southwest corner of Forrest Street and Long Avenue, in accordance with the Contractor' s letter dated July 31, 1987: +$ 300.00 Lump Sum 5. The originally proposed conduit run "IP" and wire size for incoming power for the Long Street at Grand Avenue Lift Station was changed from 2-1/2" to 3" conduit and the wire size changed from 3-No. 250 MCM with 1 No. 2 to 3-No. 300 MCM with 1 No. 2, in accordance with the Contractor's letter dated July 31, 1987: Lump Sum +$ 880.00 6. A clean sealant coating was applied to the cement masonary block walls for the Long Street and Grand Avenue Lift Station to prevent moisture penetration , in accordance with the Contractor' s letter dated July 31, 1987: Lump Sum +$ 357 .50 7. A previously unknown 2' x 4' existing storm sewer cast-in-place box culvert under Magnolia Street at Miller Street was unavoidably damaged during the installation of the new 15 inch sanitary sewer. The additional cost to make these cast-in-place repairs and maintain traffic control is in accordance with the Contractor' s letter dated May 31, 1987: Lump Sum +$ 4,830.20 8. The proposed 100 SCFM ventilator for the Long Street at Grand Avenue Lift Station was changed to a 750 SCFM ventilation to conform with State Design Criteria. This additional cost is in accordance with a letter dated September 16, 1987 from the Contractor's lift station subcontractor: Lump Sum +$ 469.20 ITEM C - TOTAL REVISED CONTRACT AMOUNT +$ 8,615.25 D. Adjustment of the contract's construction period to include the approved contract time extensions. CONTRACT TIME BEGAN - March 13, 1987 ORIGINAL CONTRACT TIME (CALENDAR DAYS) - 270 Days ORIGINAL CONTRACT DEADLINE - December 7, 1987 Time extensions due to weather are as follows: March 11, 1987 - Rainout March 23, 1987 - Rainout May 6, 1987 - Rainout May 7, 1987 - Mudout May 8, 1987 - Rainout June 3, 1987 - Rainout June 9, 1987 - Rainout June 10, 1987 - Rainout June 11, 1987 - Rainout June 12, 1987 - Rainout June 30, 1987 - Rainout July 9, 1987 - Rainout 5 of 6 T-ime extensions due to weather (Continued) July 10, 1987 - Mudout August 10, 1987 - Rainout August 31, 1987 - Rainout September 11, 1987 - Rainout September 16, 1987 - Rainout September 28, 1987 - Rainout November 9, 1987 - Rainout November 14, 1987 - Rainout November 25, 1987 - Rainout November 27, 1987 - Rainout Total of time extensions due to weather conditions: 22 days TOTAL CONTRACT TIME EXTENSION FOR THIS CHANGE ORDER NO . 1 & Final - 22 Days REVISED CONTRACT DEADLINE - December 29, 1987 DATE OF SUBSTANTIAL COMPLETION - December 11, 1987 TOTAL CHANGE THIS CHANGE ORDER NO. 1 & Final -$ 18,508.63 TOTAL REVISED CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $717,869.37 CONDITION OF CHANGE: Contractor acknowledges and agrees that the adjustments in Contract Price and/or Contract Time stipulated in this Change Order represent full compensation for all increases or decreases in the cost of, or the time required to perform the entire work under the contract, arising directly or indirectly from this Change Order and all previous Change Orders. Acceptance of this waiver constitutes an agreement between Owner and Contractor that the Change Order represents an all inclusive, mutually agreed upon adjustment to the contract, and that Contractor will waive all rights to file a claim on this Change Order after it is properly executed. Submitted by: Approved by: Accepted by: c aum urg o ck, th-c. bier 11 ng Of i ri ty -c—lfy--OT Beaumont, exas Consulting Engineers Construction Co. , Inc. Date: - l5 —S8 Date: Date: cc: Mr. S. A. Webb, Director of Water Utilities, Beaumont, Texas Mr. Albert E . Haines, City Manager, Beaumont, Texas Mr. Kennith Sterling, Sterling Utility Construction Co. , Inc. Mr. John Lock, P.E. , TWDB (Austin) Mr. Alex McMurray, Inspector, TWDB (Houston) 6 of 6