HomeMy WebLinkAboutRES 86-140 R E S O L U T I O N
WHEREAS, on October 9 , 1984, City Council awarded an
engineering services contract to Mark Whiteley and Associates for
the design of the St. Elizabeth/Gaylynn and IH-10/11th Street
Drainage Projects from the Comprehensive Drainage Program (CDP)
derived from a drainage study performed by Kohler & Kohler,
Consulting Engineers, detailing needed construction in various
areas of the city to relieve flooding; and,
WHEREAS, during the preliminary phase of the engineering
contract, Mark Whiteley found that the project described by Kohler
& Kohler would benefit only limited areas; and,
WHEREAS, Mark Whiteley suggested to the city that a
modification in the design would increase the affected area with
only a moderate increase in construction costs; and,
WHEREAS, the design phase has been completed and bids
taken with the low bid fifteen percent ( 15%) more than the original
construction estimate; and,
WHEREAS, Mark Whiteley has requested amending his
contract to increase the design phase by $12, 440 making the total
contract "not-to-exceed" amount $42, 519;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the City Manager be, and he is hereby, authorized to amend the
contract between Mark Whiteley and Associates and the City of
Beaumont to increase the design phase to $16, 438. 60 .
PASSED BY THE CITY COUNCIL of the City of Beaumont this
the ��day of h,�„�� 1986.
Mayo r -
2 -