Loading...
HomeMy WebLinkAboutRES 85-135 R E S O L U T I O N WHEREAS, on September 25, 1984 the City of Beaumont awarded a contract to Russ Miller Construction Company in the amount of $204,798.41 (City' s share, including engineering fee is $69,405.72) for the construction of Shelby Drive from 135 feet south of Doty a distance of 330 feet to a point 140 feet north of Gross as a 37-foot residential collector street in lieu of a 27-foot residential street, and the construction of storm drainage along Riggs Street from Calhoun to Drainage District No. 6 ' s ditch No. 12-B; and, WHEREAS, the project has been completed at a total cost of $205,856.35 (City' s share is $170,293.51) , which is an overrun of $1 ,057.94 (City' s share is $887.79) , or 0 .520 of the total project; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT construction of Shelby Drive from 135 feet south of Doty and the construction of storm drainage along Riggs Street is hereby accepted by the City of Beaumont and that the City Manager be, and he is hereby, authorized to make final payment to Russ Miller Construction Company in the amount of $10,292.82. PASSED BY THE CITY COUNCIL of the City of Beaumont this the Zal day of , 1985. 444 4r.4W%!n-,.&e - Mayor -