Loading...
HomeMy WebLinkAboutRES 84-436 fn R E S O L U T I O N WHEREAS, on October 2 , 1984, the City awarded a contract to Jim Walters Construction Company to provide for drainage improvements to the Beaumont Public Library; and, WHEREAS, Change Order No. 1 has been proposed to relocate a 15" drainage pipe and to install a manhole at a cost of $1 ,271 .64 ; and, WHEREAS, additional excavation was done to determine the extent of underground obstruction after encountering concrete stabilized material around the air conditioning lines at a cost of $ 534.90 ; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be, and he is hereby , authorized to execute Change Order No. 1 to the contract with Jim Walters Construction Company increasing the contract amount by $1 ,806.54 for a total contract amount of $12,483.74 . PASSED BY THE CITY COUNCIL of the City of Beaumont this the �.�/� day of 1984 . - Mayor -