HomeMy WebLinkAboutRES 84-436 fn
R E S O L U T I O N
WHEREAS, on October 2 , 1984, the City awarded a contract
to Jim Walters Construction Company to provide for drainage
improvements to the Beaumont Public Library; and,
WHEREAS, Change Order No. 1 has been proposed to relocate
a 15" drainage pipe and to install a manhole at a cost of
$1 ,271 .64 ; and,
WHEREAS, additional excavation was done to determine the
extent of underground obstruction after encountering concrete
stabilized material around the air conditioning lines at a cost of
$ 534.90 ;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the City Manager be, and he is hereby , authorized to execute
Change Order No. 1 to the contract with Jim Walters Construction
Company increasing the contract amount by $1 ,806.54 for a total
contract amount of $12,483.74 .
PASSED BY THE CITY COUNCIL of the City of Beaumont this
the �.�/� day of 1984 .
- Mayor -