HomeMy WebLinkAboutRES 84-333 R E S O L U T I O N
WHEREAS, on September 6 , 1983, the City Manager was
authorized to enter into an agreement with Schaumberg and Polk ,
Inc. for engineering services in connection with the College Street
T. I. P. Project; and,
WHEREAS, the agreement with Schaumberg and Polk , Inc. is
for an amount not to exceed $415,425 ( the preliminary phase is not
to exceed $77,020; the design phase is not to exceed $149,415; and
the construction phase is not to exceed $188,990) with the project
limits being from Pearl Street to Eleventh Street; and,
WHEREAS, as a result of a more detailed traffic study, it
has been determined that the limits of the project should be
expanded to include the section between Pearl Street and Main
Street;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the City Manager be, and he is hereby , authorized to execute
an amendment to the agreement between the City of Beaumont and
Schaumberg and Polk , Inc. to include costs to perform the
additional services required ( the design phase to be increased to
$159,901 ; and the construction phase to be increased to $200,320) .
PASSED BY THE CITY COUNCIL of the City of Beaumont this
the ZI day of 1984.
Mayor -