Loading...
HomeMy WebLinkAboutRES 84-333 R E S O L U T I O N WHEREAS, on September 6 , 1983, the City Manager was authorized to enter into an agreement with Schaumberg and Polk , Inc. for engineering services in connection with the College Street T. I. P. Project; and, WHEREAS, the agreement with Schaumberg and Polk , Inc. is for an amount not to exceed $415,425 ( the preliminary phase is not to exceed $77,020; the design phase is not to exceed $149,415; and the construction phase is not to exceed $188,990) with the project limits being from Pearl Street to Eleventh Street; and, WHEREAS, as a result of a more detailed traffic study, it has been determined that the limits of the project should be expanded to include the section between Pearl Street and Main Street; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be, and he is hereby , authorized to execute an amendment to the agreement between the City of Beaumont and Schaumberg and Polk , Inc. to include costs to perform the additional services required ( the design phase to be increased to $159,901 ; and the construction phase to be increased to $200,320) . PASSED BY THE CITY COUNCIL of the City of Beaumont this the ZI day of 1984. Mayor -