HomeMy WebLinkAboutRES 04-018 RESOLUTION NO. 04-018
WHEREAS, bids were received for a contract for a comprehensive risk management
study of Beaumont Fire/Rescue Services; and,
WHEREAS, Emergency Services Consulting Group, Inc. submitted a bid in the total
amount of$41,335; and,
WHEREAS, City Council is of the opinion that the bid submitted by Emergency
Services Consulting Group, Inc. should be accepted;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the bid submitted by Emergency Services Consulting Group, Inc. for a
comprehensive risk management study of Beaumont Fire/Rescue Services in the total
amount of$41,335 be accepted by the City of Beaumont and the City Manager is hereby
authorized to execute a contract for the study substantially in the form attached hereto as
Exhibit "A."
PASSED BY THE CITY COUNCIL of the City of Beaumont this the 20th day of
January, 2004.
- Mayor 11fro Tern Becky Ames -
Emergency Serviees Consulting inc.
Personal Services Contract
This agreement made this day of 2004, by and
between the City of Beaumont and Emergency Services Consulting inc. (ESO), doing
business as a corporation in York, Pennsylvania, hereinafter called Emergency Services
Consulting inc..
Witnesseth:
That for and in consideration of the payment and agreements hereinafter mentioned and
attached to be made and performed by the above City and ESG, hereby agree to
commence and complete the consultation and to provide the work described and comply
with the terms of the contract documents for the:
Comprehensive Risk Management Study of the Beaumont Fire/Rescue Services
Hereafter called the "project" for the sum of $36,330.00 plus expenses not to exceed
$5,005.00. Expenses are anticipated to include travel, lodging,and meals.
Total bid for services, not to exceed: $41,335.40.
ESCi will furnish all labor and other services necessary to complete the work relating to
and including the development and administration of the study. Ma hereby agrees to
perform the work as specified by the City as outlined in the attached scope of work.
The City shall pay EKE-
25%payment due upon contract signing
• 25%payment due upon receipt of draft report(Tasks I and I!)
• 25%payment due upon receipt of Strategic Plan Draft(Task III)
• 2S%payment due upon receipt of invoice, final report and completion of project
(oral presentation).
This agreement shall be binding upon all parties hereto and their respective heirs,
executors, administrators, successors, and assigns.
The laws of the state of Texas shall govern this agreement.
This agreement is an integrated writing, executed by the parties after negotiation and
discussions of all material provisions. Either party has relied upon no inducements,
concessions or representations of the fact, except as-set forth in this agreement and the
ESCii proposal. - _
IN WITNESS WHEREOF, the parties hereto have executed,.or caused_ to be executed by-"'
their duly uthorized officials, the
Y agreement is two (I)-copies, each of which shall-be _
deemed an on ' - --
gmal, on the first date written above.
City of Beaumont,Texas Emergency Services Consulting inc- -
By: Br.
Signature Jack W. Snook,President
EXHIBIT "N'
Emergency Services Consulting inc.
Scope of Work
The following steps, activities and analysis will be accomplished to produce the final
report and recommendations. This methodology has been developed specifically for the
Beaumont Fire/Rescue Services based on our understanding of your expectations.
However, it utilizes approaches, tools, and techniques proven through experience to
provide the kind and quality of information needed to make objective, informed
decisions.
Task No. l: Development of Project Work Plan
Activity: ESCi will meet with and refine the proposed work plan with the project's
management team to gain a comprehensive understanding of the project's
background, goals, and expectations. This action plan shall be developed
identifying:
A. Primary tasks to be performed
B. Person(s)responsible for each task
C. Time table for each objective to be complete
D. Method of evaluating results
E. Resources to be utilized
F. Possible obstacles or problem areas associated with the accomplishment of
each task
This meeting will also help to establish working relationships, make logistical
arrangements, determine line of communications, and finalize contractual arrangements.
Other agenda items to be discussed includes data collection approach, finalize interview
plan and tentative schedule, interim milestones, meetings, deliverables, and to obtain
pertinent reports and background material.
Task No. 2: Review of Background Information
Activity: Review and evaluate documents and information relevant to this project
including:
A General plan of the municipality or community
B. Existing community growth managemem plans
C. Current and proposed land use plans D. Zoning maps and zoning code
E. Current comprehensive planning documents= - s
F. City building codes and ordinances -
G. Local census statistics - - -
H. Physical facilities
I. Incident data, service practices, current service delivery objectives and
targets, and other relevant information
2
Emergency Services Consulting mc.
Task No. 3: Stakeholders Input
Activity: Conduct interviews with and gather information from key personnel
including:
A. City Manager
B. Finance function managers
C. Fire Department managers and other staff
D. Labor representatives
E. City planning staff
F. Building officials
G. Others as they may contribute to this project
The project team will interview key stakeholders of any organization associated with this
study. At a minimum, members of the project team will interview elected officials, fire
agency officials, labor representatives and, as appropriate, representatives that the agency
deems necessary.
From these interviews ESCi will obtain additional perspective on operational, economics,
and policy issues facing the agency. In addition, the project team will learn more about
availability of data necessary to meet projected goals.
Task No. 4: Community Risk Analysis
Activity: Conduct a complete and thorough analysis of the community fire, rescue, and
hazardous materials risk The purpose of this phase of the project is to
quantify, .as accurately as possible, in what areas, and to what degree, the
community is at risk of fire or disaster, created by both man and nature.
Objective 1: Workload Analysis - An overview of the, organization's historical
incident workload shall be developed evaluating:
A Incident volume by type
B. Incident volume by land use
C. Incident volume by demographics
D. Incident volume temporal analysis
E. Incident volume by resource
F. Other historical workload data as may be appropriate
Objective Z: Geographic Risk Analysis—A fire incident risk analysis of all areas of
the municipality will be completed and presented in graphic format and
will include consideration of
A. Occupancy risk classification
B. Quantification of occupancy risk type by zoning or land use classification
C. Quantification of occupancy risk type density
3
Emergency Services Consulting inc.
D. Development of relative risk scoring for zoning or land use classes
4
Emergency Services Consulting inc.
Objective 3: Target Hazard Analysis- The community's target hazards shall be
identified and mapped, including:
A. Occupancy-sensitive hazard locations
B. High hazard materials and processes
C. Transportation corridors with elevated hazard
D. Sensitive government or community function hazards
Task No. 5: Fire Department Agency Analysis
Activity: Conduct a complete and thorough organizational analysis of the agency based
on the elements included in the following ten objectives. The purpose of this
phase of the project is to quantify the efficiency, effectiveness, and
capabilities of the department in relation to the community's risks as
identified in Task No. 4. This phase can be an excellent foundation for the
preparation of the agency for accreditation by providing a third-party,
independent and systematic examination of the inner workings of all aspects
of the operation.
Objective l: Organization Overview - An overview of the organization shall be
developed evaluating:
A Responsibilities and line of authority
B. Attributes of successful organizations
C. History,formation,and general description of the Fire/Rescue Services today
D. Chain of command
E. Organizational structure
F. Operating budget,funding,fees,taxation,and financial resources
G. Cost recovery efforts
K Current description of the fire suppression infrastructure
Objective 2: Management Component-Areas to be evaluated include:
A. 11ission,vision, strategic planning, goals and objectives
B. Adequacy of SOGs,rules and regulations, policies
C. Financial controls
D. Critical issues
E. Challenges of the future
F. Internal and external communications
G. Decision making process
H. Document control
I. Security
I Reporting and records
5
Emergency Services Consulting inc.
6
Emergency Services Consulting hm
Objective 3: Planning for Fire Protection- The agency's planning process shall be
identified and reviewed. Key components include:
A. Organizing for the planning process
B. Review and evaluate the adequacy of the current planning process
C. Identifying critical issues and analyzing current and future services
D. Review elements of tactical planning within the organization
E. Review elements of operational planning within the organization
F. Review elements of master planning within the organization
G. Make recommendations relative to future planning efforts
Objective 4. Risk Management — Review and make recommendations on various
elements within the operation of the agency that present or mitigate
risks of civil or legal action, injury, or illness, that would have a
detrimental effect on the organization, including:
A Compliance programs for regulations and standards
B. Analysis of risk management strategy
C. Analyze risks associated with current employment practices
D. Analyze risks associated with current termination practices
E. Analyze risks associated with current training practices
F. Review safety policies,practices and programs
G. Review job-related injury processes
H. Liability insurance programs
I. Property insurance programs
Objective S. Personnel Management - Personnel management program shall be
reviewed, focusing on:
A Policies, rules, regulations,manuals, and handbooks
B. Reports and records
C. Compensation
D. Labor-management relationship and issues
E. Certifications and licensing
F. Disciplinary process
G. Counseling services
H. The application and recruitment process
I. Testing, measuring, and promotion-processes
J. Health and wellness programs
Objective 6. Staffing-Review the staffing levels of the Fire D_ epartment. Areas to
be considered include: - -
A Review and evaluate administration and support gaffing levels
B. Review and evaluate operations staffing levels
C. Review staff allocation to various functions and divisions `
D. Analyze current staffing performance for incidents
E. Review operational staff distribution
F. Review distribution of responsibilities and activity levels of personnel
7
Emergency Services Consulting inc.
Objective 7: Capital Assets and Capital Improvement Programs — Review status
of current major capital assets (facilities and apparatus) and analyze
future needs relative to the purchase of necessary capital improvement
items including:
A Facilities - Tour and make recommendations in areas critical of current station
location and condition. Items to be contained in the report include:
• Location • Code compliance
• Age, condition, serviceability • Efficiency of design
• Staffing capability • Environmental issues
• Construction • Safety
B. Apparatus/vehicles -Review and make recommendations regarding inventory
of apparatus and equipment. Items to be reviewed include:
• Age, condition, and serviceability
• Distribution and deployment
• Maintenance
• Regulations compliance
• Future needs
C. Support equipment
D. Methods of financing capital needs
Objective 8. Delivery Systems: Suppression, Rescue, and HazMat — Review and
make recommendations in areas specifically involved in, or affecting,
service levels and performance. Areas to be reviewed shall include,
but not necessarily be limited to:
A_ Alarm systems and communications
B. Dispatch capabilities and methods
C. Current response time performance levels and capabilities, analyzed through
Geographical Information Systems software
D. Facility deployment strategies, analyzed through Geographical Information
Systems software as appropriate
E. Resource deployment strategies, analyzed through Geographical Information
Systems software as appropriate
F. Suppression, rescue, hazmat, and other specialized programs scope of
delivery
G. Incident control and management practices
H. Standard response deployment.practices
I. Mutual aid, automatic aid
• plans and agreements
• frequency and type of use
• methods of communication
• inter-department training
8
Emergency Services Consulting inc.
Objective 9: Training Program - Review and make overall recommendations in
critical areas involving training. Items to be reviewed include:
A. General training competencies
B. Training administration
C. Training schedule
D. 'gaining facilities
E. Training program goals and objectives
F. Training procedures and manuals
G. Record keeping
H. Clerical support
Objective 10: Fire Prevendon/Public Education Program - review the department's
efforts toward fire injury prevention and public education programs.
Elements to be evaluated.include:
A Code enforcement activities
B. New construction inspection and involvement
C. General inspection program
D. Fire and injury public education programs
E. Fire investigations
F. Pre-incident planning
G. Statistical Collection and Analysis
Task No. 6: Customer Centered Strategic Planning Process
Activity: Customer Input Opportunity- ESCi will assist the Fire/Rescue Services in
identifying external customers/key members of the community who will be
invited to participate as the Citizen's Advisory Group for this portion of the
process. Once identified, invitations will be mailed and ESCi facilitators will
convene this Citizen's Advisory Group for the purpose of gaining a realistic
view of external customer needs and expectations of their Department,
including:
1. How customers prioritize the services provided by the Department.
2. Areas of customer concern about the Department.
3. Customer expectations of the Department.
4. Positive attributes of the Department as identified by external customers.
The meet' will be o - - —
uig organized after normal working hours to accommodate carious vrork = _
schedules. At a minimum, we recommend the representatives of this Citizen's Advisory
Group include but not be limited to:
• Business owners. - - -
• Chamber of Commerce representative:
• Prominent citizens in the community.
• Members of civic organizations.
• Media representative.
9
Emergency Services Consulting inc.
• Multiple citizens who have been actual recipients of the
Department's services.
• Representatives of neighborhood organizations.
• Representative(s)of non-profit organizations.
• Representatives of local industry.
ESCi personnel will facilitate this group meeting. This step is critical, as it makes certain
that customer needs and concerns are incorporated into the strategic plan. It ensures that
the Department recognizes the public concerns and incorporates them into the long-range
strategic planning process and provides the public with important background
information about their Fire/Rescue Services that they might not have been exposed to
under normal circumstances.
Activity: Strategic Planning Workshop- ESCi will facilitate a two-day strategic
planning workshop that will fully integrate all phases of this study project, as well as the
customer's input, in order to clearly articulate a vision for the future of the agency and to
identify realistic and achievable goals and objectives that will lead the agency toward this
vision over the next five years.
Successful achievement of this objective requires the formation of a Department Strategic
Planning Group. The composition of this group should include representative members
from all ranks, divisions, and shifts of the Department. As stated in the RFP, it is
important that representatives from Local 399 IAFF, fire administration and other
constituencies fully participate in this process. These members shall become liaisons
between the planning group and their respective shifts, divisions and workgroups
throughout the development and implementation of the plan. They will need to meet
regularly with their respective workgroups, shifts, divisions and sections to disseminate
information on the various steps of the planning process as it progresses, and obtain
valuable feedback and input from the other members of the Department at large to put
back into the planning process. This two-way exchange of information ensures that
everyone in the Department who chooses to have a voice in the process has one. These
communication-conduits are integral, and vital to the success of the strategic planning
process.
Objective 1: Mission, Vision, Values- The Strategic Planning Group will be
guided through the process of development and/or review of
meaningful vision, mission, and values for the organization:
I. Vision statements describe the way the Department views itself min'-the future.
2. Mission-statement describes the purpose for which the Department-exists:
3. Values enumerate the principles, tenets or ideas-that are important-to-the
members.
Participative, collaborative development of the mission and vision--statements=and
the values of the Beaumont Fire/Rescue Services. are pivotal to ensure that there is
Department-wide"buy-in"and support for the plan(s)_and their development.
ESO will facilitate discussions that ensure participation by all present, to stimulate
challenging thought process, prevent tangential discussion, and to move the group
to consensus.
10
Emergency Services Consulting Lac.
Objective 2: Internal and External Assessment- Identification or review of both
internal and external needs and issues(SWOT Analysis):
1. Strengths of the organization.
2. Weaknesses of the organization.
3. Opportunities for the organization.
4. Threats to the organization.
The importance of the internal customers of the organization lending their full
participation to the strategic planning process cannot be overemphasized. The
members who compose the Beaumont Fire/Rescue Department are the primary
internal customers of both the Department and of each other. Their participation,
involvement, and interaction with the strategic planning group,-particularly at this
point in the process, are critical to the vitality and overall success of the resultant
plans. Analyzing the strengths, weaknesses, opportunities for,and the threats to the
organization is the next critical step in the strategic planning process, and the
participation of the internal customers is crucial to the success of the plan at this
point.
Strengths are important as areas of the organization to be built upon, and
weaknesses are areas to be identified as potential spots for improvement.
Opportunities are extremely important to the organization as areas to be viewed as
positive prospects. Threats must be identified and dealt with if plausible, but at the
very least they will be known to the organization. The strategic planning group
may identify other critical issues facing the Department either currently or in the
future at this point as well. These may include issues that the strategic planning
group identifies as critical to the health and success of the organization.
This activity will intensely utilize the previous agency evaluation portion of this
study project as a foundation for identification and analysis of strength and
weaknesses.
Objective 3: Goals, Objectives, Tasks, and Performance Measures- The
Strategic Planning Group will be guided through the process of
identification and articulation of,the primary goals necessary
achieve its future vision, as well as the development-of achievable
and realistic objectives, tasks, and timelines for-accomplishment and
methods for measuring this accompksh` ent: This process will
include:
1. Establishment of organizational goals that address the concerns identified
by the internal and external customers. Goals will be achievable, realistic,
and measurable and will be specific enough to provide organizational
movement toward the articulated vision of the agency
11
Emergency Services Consulting inc.
2. For each goal,the development of one or more measurable objectives that
are written in such a manner that describes the criteria judging the
outcome as complete or successful, and the time frame expected to reach
the desired outcome.
3. Development of associated tasks for each goal and objective utilizing the
format of identified measurable criteria.
4. Development of performance measures for ongoing assessment of
Department's performance based on current and anticipated service
demands.
The establishment of realistic goals and objectives will demonstrate attainment of
this objective for the Department at this stage of the process. In order to meet the
mission of the Department,the establishment of these goals is essential to providing
the Department and the individual members with a clear direction.
The goals and objectives established during this process will become management
tools and should be updated on a continuous basis as priorities change and as
specific goals and/or objectives are achieved. The goals and objectives can then be
used to identify what has been achieved and to denote changes within the
community and the organization. .
Task No. 7: Development and Review of Draft Project Report
Activity: ESO will develop and produce an adequate quantity of publication-quality,
bound, draft versions of the written report for review by the client. Client
feedback is a critical part of this project and adequate opportunity will be
provided for review and discussion of the draft report prior to finalization The
report will include:
A. An Executive Summary describing the nature of the report,the methods of
analysis,the primary findings, and critical recommendations.
B. Detailed narrative analysis of each report component, structure in easy-to-
read sections and accompanied by explanatory support to encourage
understanding by both staff and civilian readers.
C. Clearly designated recommendations, highlighted,for easy reference and
catalogued as necessary in a report appendix.
D. Supportive charts,graphs, and diagrams,where appropriate.
E. Supportive maps, utilizing Geographical Information Systems analysis as
necessary.
12
Emergency Services Consulting inc.
Task No. 8: Delivery and Presentation of Final Project Report
Activity: ESCi will complete any necessary revisions of the draft and produce the
specified quantity of publication-quality, bound, final versions of the written
report. Formal presentations of the project report will be made by ESCi
project team member(s) to staff elected officials, or the general public and
will include the following:
A Conduct a complete and thorough organizational analysis of the agency a
summary of the nature of the report, the methods of analysis, the primary
findings, and critical recommendations.
B. Supportive audio-visual presentation
C. Review and explanation of primary supportive charts, graphs, diagrams,
and maps,where appropriate.
D. Opportunity for questions and answers, as needed.
Deliverables
ESCi will be responsible for the following specific deliverables in keeping with the
schedule described below:
1. Work plan.
2. Collection'and review of organization documentation.
3. Identification and coordination of stakeholders and sessions involving
stakeholders.
4. Weekly status reports and debriefings after each on-site session.
5. Two(2)copies of the draft reports will be delivered for review of accuracy of
obtained information.
6. Ten(10)professionally bound copies of the final report.
d - -
13