Loading...
HomeMy WebLinkAboutRES 81-422 R E S O L U T I O N WHEREAS, on May 6 , 1980, the City of Beaumont entered into a contract with Kohler and Kohler for the preparation of a Master Drainage Plan; and, WHEREAS, in order for this Study to be properly implemented, additional services must be performed by the Engineer as are listed below: (a) Prepare a rated list of all drainage projects out- lined in the Study based on a rating system determined by the Engineer and the City. As part of the rating system, the effectiveness of each project with respect to Taylor's Bayou Project and existing outfall conditions will be determined; (b) Prepare a priority list of approximately 30 projects; (c ) Prepare cost estimates on this tentative list; (d) Consult with the City to develop final project to be accomplished immediately and prepare estimates; (e) Provide additional services as required . NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be, and he is hereby, authorized to enter into a contract addendum with Kohler and Kohler for implementation of the Master Drainage Study with estimated cost of services to be $16,700 and with a fee not to exceed $20,000. PASSED BY THE CITY COUNCIL of the City of Beaumont this the / day of , 19 ::2e - - Mayo r -