Loading...
HomeMy WebLinkAboutRES 81-178 7.0' R E S O L U T I O N WHEREAS, on September 9, 1980, City of Beaumont entered into a contract with Daniels Building and Construction Company for the remodeling of the City Auditorium; and, WHEREAS, Change Order No. 2 has been recommended for the additions as stated in Exhibit "A" attached hereto and made a part hereof; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CI'T'Y OF BEAUMONT: THAT the City Manager be, and he is hereby, authorized to execute Change Order No. 1 to the contract with Daniels Building and Construction Company thereby increasing the amount of the contract from $3,720,659 to $3,753,044. PASSED BY THE CITY COUNCIL of the City of Beaumont this the day of Q, c�G . 1981. ' - Mayor _ ' Ile- '� trATIO'�S ADDI T ION MII -')N BELL D . REX GOODE BEAU?,'FONT CITi' AUDITORIUM . _ ASS ,;IATED ARCHITECTS G PL 'NERS BEAUMONT, .TEXAS BEAUMONT, TEXAS CHANGE ORDER NO. 2 1 APRIL 1981 The General Contractor is directed to make the following changes in the contract: 1 . Increase allowance for 11 type "SF" light fixtures to $250 . 00/each. ADD $ 1 , 860 . 00 2 . Add 6 type "SF" fixtures previ-ously deleted. ADD 1 , 320 . 00 3. Install carpet in rooms 107 , 236 , 237 , 242 , and 243 in lieu of 1/8" thick vinyl composi- tion floor tile . ADD 1 , 430 . 00 4 . Revise decorative mouldings on North and South walls of Auditorium to provide an enhanced decorative treatment similar to that noted on the original drawings .. ADD 7 , 500 . 00 5 . Revise moulding design of Proscenium Arch to provide a decorative treatment similar to the original design. ADD 9 , 250 . 00 6 . Reinstate vinyl wall covering deleted by Change Order No . 1 . ADD 3 , 380 . 00 7 . Use DECOUSTIC panels at orchestra pit in lieu of 2" thick TECTUM panels . ADD 7 , 645 . 00 TOTAL ADD THIS CHANGE ORDER ADD $32 , 385 . 00 MILTON BELL & D. REX GOODE ASSOCIATED ARCHITECTS & PLANNERS 5 Milton Bell alb EXHIBIT "A"